Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted ascending Subject(s) Not sorted Building(s) Not sorted Action
2011-10-2828 October 2011Scientific Understanding of the Canterbury Crustal Earthquakes from 4 September 2010 to their Closure on 21 June 2011 - Addendum: Submission by James Quinwallace, September 2011Scientific Understanding of the Canterbury Crustal Earthquakes from 4 September 2010 to their Closure on 21 June 2011 - Addendum: Submission by James Quinwallace, September 2011
    Quinwallace, James
    Submission
    Seismicity
    2011-10-2828 October 2011Scientific Understanding of the Canterbury Crustal Earthquakes from 4 September 2010 to their Closure on 21 June 2011: Submission by James Quinwallace, September 2011Scientific Understanding of the Canterbury Crustal Earthquakes from 4 September 2010 to their Closure on 21 June 2011: Submission by James Quinwallace, September 2011
      Quinwallace, James
      Submission
      Seismicity
      2011-10-2828 October 2011Darfield Earthquake: The Value of Long-term Research, 2010: Submission by The Royal Society of New Zealand, October 2011Darfield Earthquake: The Value of Long-term Research, 2010: Submission by The Royal Society of New Zealand, October 2011
        The Royal Society of New Zealand
        Submission
        Seismicity
        2011-10-2828 October 2011Canterbury Earthquakes - Answers to Critical Questions About Buildings: Submission by The Royal Society of New Zealand, October 2011Canterbury Earthquakes - Answers to Critical Questions About Buildings: Submission by The Royal Society of New Zealand, October 2011
          The Royal Society of New Zealand
          Submission
          Engineering
          2012-03-2626 March 2012SESOC practice note "Design of Conventional Structural Systems following the Canterbury Earthquake": Submission by Dene Cook, March 2012SESOC practice note "Design of Conventional Structural Systems following the Canterbury Earthquake": Submission by Dene Cook, March 2012
            Cook, Dene
            Submission
            Standards and Regulation
            2012-03-2626 March 2012Response to SESOC Practice Note on the Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Beca, March 2012Response to SESOC Practice Note on the Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Beca, March 2012
              Beca Carter Hollings & Ferner Ltd (Beca)
              Submission
              Standards and Regulation
              2012-03-2626 March 2012Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Contech Specialist Contracting, March 2012Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Contech Specialist Contracting, March 2012
              • Contech Specialist Contracting
              • Wymer, Paul
                Submission
                Standards and Regulation
                2012-03-2626 March 2012Response to SESOC Practice Note: Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Compusoft Engineering, March 2012Response to SESOC Practice Note: Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Compusoft Engineering, March 2012
                • Bradley, Derek
                • Brooke, Nicholas
                • Compusoft Engineering
                • Davidson, Barry
                • McBride, Anthony
                • Stuart, Tony
                  Submission
                  Standards and Regulation
                  2012-03-3030 March 2012Colombo 593 hearing: Post hearing submission from Holmes Consulting Group to the Royal CommissionColombo 593 hearing: Post hearing submission from Holmes Consulting Group to the Royal Commission
                    Holmes Consulting Group
                    Submission
                    Buildings - Representative Sample
                    Colombo 593
                  2012-03-3030 March 2012Colombo 593 hearing: Post hearing submission from NAI Harcourts to the Royal CommissionColombo 593 hearing: Post hearing submission from NAI Harcourts to the Royal Commission
                    NAI Harcourts Real Estate
                    Submission
                    Buildings - Representative Sample
                    Colombo 593
                  2012-03-3030 March 2012Colombo 593 hearing: Post hearing submission of Simon Wall to the Royal CommissionColombo 593 hearing: Post hearing submission of Simon Wall to the Royal Commission
                    Wall, Simon
                    Submission
                    Buildings - Representative Sample
                    Colombo 593
                  2012-04-0202 April 2012PGC Building hearing: Post-hearing submission in relation to the PGC Building from Christchurch City CouncilPGC Building hearing: Post-hearing submission in relation to the PGC Building from Christchurch City Council
                  • Christchurch City Council
                  • Daines, Nadine
                  • Laing, Duncan
                    Submission
                    Buildings - Representative Sample
                    Cambridge 233
                  2012-04-0202 April 2012PGC Building hearing: Post-hearing submission of Holmes Consulting Group in relation to the PGC BuildingPGC Building hearing: Post-hearing submission of Holmes Consulting Group in relation to the PGC Building
                    Holmes Consulting Group
                    Submission
                    Buildings - Representative Sample
                    Cambridge 233
                  2012-02-1616 February 2012Submission by Bruce Moon in relation to 382 Colombo StreetSubmission by Bruce Moon in relation to 382 Colombo Street
                    Moon, Bruce
                    Submission
                    Buildings - Representative Sample
                  • Colombo 380
                  • Colombo 382
                  2012-03-2626 March 2012Submission from Hamilton City Council regarding SESOC practice note, February 2012Submission from Hamilton City Council regarding SESOC practice note, February 2012
                  • Hamilton City Council
                  • Saunders, Phil
                    Submission
                    Standards and Regulation
                    2011-10-2727 October 2011Submission by Auckland Council, October 2011Submission by Auckland Council, October 2011
                    • Auckland Council
                    • Reade, Patricia
                      Submission
                    • Building assessments after earthquakes
                    • Placarding (Stickering)
                    • Safety Evaluation
                    • Seismic Strengthening
                    • Standards and Regulation
                    • Unreinforced Masonry Buildings (URM)
                      2012-02-1313 February 2012Management of Earthquake Risk: Submission by Department of Building and Housing, January 2012Management of Earthquake Risk: Submission by Department of Building and Housing, January 2012
                        Department of Building and Housing
                        Submission
                      • Standards and Regulation
                      • Unreinforced Masonry Buildings (URM)
                        2012-03-2626 March 2012Comments on SESOC practice note "Design of Conventional Structural Systems Following the Canterbury Earthquakes": Submission by Dunning Thornton Consultants Ltd, March 2012Comments on SESOC practice note "Design of Conventional Structural Systems Following the Canterbury Earthquakes": Submission by Dunning Thornton Consultants Ltd, March 2012
                          Dunning Thornton Consultants Ltd
                          Submission
                        • Engineering
                        • Standards and Regulation
                          2012-03-1212 March 2012Unreinforced masonry and other earthquake-prone buildings - requirements for seismic strengthening: submission by Department of Building and Housing, October 2011Unreinforced masonry and other earthquake-prone buildings - requirements for seismic strengthening: submission by Department of Building and Housing, October 2011
                            Kelly, David
                            Submission
                          • Seismic Strengthening
                          • Standards and Regulation
                          • Unreinforced Masonry Buildings (URM)
                            2012-08-1515 August 2012Training and Education of Engineers and Organisation of the Engineering Profession: Joint submission from the Institution of Professional Engineers New Zealand (IPENZ) and the Association of Consulting Engineers New Zealand (ACENZ) on the Royal Commission Discussion Paper, July 2012Training and Education of Engineers and Organisation of the Engineering Profession: Joint submission from the Institution of Professional Engineers New Zealand (IPENZ) and the Association of Consulting Engineers New Zealand (ACENZ) on the Royal Commission Discussion Paper, July 2012
                            • Association of Consulting Engineers New Zealand
                            • Institution of Professional Engineers New Zealand (IPENZ)
                              Submission
                            • Standards and Regulation
                            • Training and Education

                              Search results navigation

                              Displaying 53 - 72 of 171 items arrow left First arrow left Prev arrow right Next arrow right Last