Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Sorted ascending Action
2011-10-1919 October 2011Aftershock information for Geonet website - Aftershock DefinitionAftershock information for Geonet website - Aftershock Definition
  • Gerstenberger, Matthew
  • GNS Science
    Exhibit
    Seismicity
    2011-10-1919 October 2011Aftershock info for Geonet website: Expected number of aftershocks per day of magnitude 4.0-4.9 and expected number of aftershocks per day of magnitude 5 and largerAftershock info for Geonet website: Expected number of aftershocks per day of magnitude 4.0-4.9 and expected number of aftershocks per day of magnitude 5 and larger
    • Gerstenberger, Matthew
    • GNS Science
      Exhibit
      Seismicity
      2012-03-1212 March 2012Implications for structural design motions - Presentation to the Canterbury Earthquakes Royal Commission, October 2011Implications for structural design motions - Presentation to the Canterbury Earthquakes Royal Commission, October 2011
      • GNS Science
      • McVerry, Graeme
        Exhibit
        Seismicity
        2011-10-1919 October 20116.3 Magnitude Earthquake Part of Aftershock Sequence - includes graphic showing location of main shock, aftershocks above magnitude 3, and fault ruptures in Canterbury - Media Release by GNS Science, 25 February 20116.3 Magnitude Earthquake Part of Aftershock Sequence - includes graphic showing location of main shock, aftershocks above magnitude 3, and fault ruptures in Canterbury - Media Release by GNS Science, 25 February 2011
          GNS Science
          Exhibit
          Seismicity
          2011-10-1818 October 2011GNS Science - The Canterbury Earthquake Sequence - Presentation to the Canterbury Earthquakes Royal CommissionGNS Science - The Canterbury Earthquake Sequence - Presentation to the Canterbury Earthquakes Royal Commission
          • GNS Science
          • Webb, T H (Terry)
            Exhibit
            Seismicity
            2011-10-1919 October 2011Canterbury quake the most damaging since 1931 - includes map of large New Zealand earthquakes - Media Release from GNS Science, 4 September 2010Canterbury quake the most damaging since 1931 - includes map of large New Zealand earthquakes - Media Release from GNS Science, 4 September 2010
              GNS Science
              Exhibit
              Seismicity
              2011-10-2121 October 2011Probabilities of aftershocks and larger events for the 2010 Darfield earthquake based on average behaviour of New Zealand earthquakes: Technical Report by GNS Science, 2011Probabilities of aftershocks and larger events for the 2010 Darfield earthquake based on average behaviour of New Zealand earthquakes: Technical Report by GNS Science, 2011
                GNS Science
              • Exhibit
              • Technical Report
                Seismicity
                2011-10-1717 October 2011GNS Science - Webb Ancillary Slides: Presentation to the Canterbury Earthquakes Royal Commission - Slide 1 - Stress triggering in TurkeyGNS Science - Webb Ancillary Slides: Presentation to the Canterbury Earthquakes Royal Commission - Slide 1 - Stress triggering in Turkey
                • GNS Science
                • Webb, T H (Terry)
                  Exhibit
                  Seismicity
                  2011-10-1919 October 2011Textbook Aftershock Sequence, Seismologist Says - includes graph: number of aftershocks per day greater than magnitude 5 - Media Release by GNS Science, 10 September 2010Textbook Aftershock Sequence, Seismologist Says - includes graph: number of aftershocks per day greater than magnitude 5 - Media Release by GNS Science, 10 September 2010
                    GNS Science
                    Exhibit
                    Seismicity
                    2011-11-1414 November 2011Draft Policy on Earthquake-Prone Buildings: Letter by Sir Miles Warren, ArchitectDraft Policy on Earthquake-Prone Buildings: Letter by Sir Miles Warren, Architect
                      Warren, Miles
                      Exhibit
                    • Standards and Regulation
                    • Unreinforced Masonry Buildings (URM)
                      2011-10-1919 October 2011Structural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard SpectraStructural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard Spectra
                        Standards New Zealand
                        Exhibit
                        Standards and Regulation
                        2011-10-1818 October 2011Structural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard SpectraStructural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard Spectra
                          Standards New Zealand
                          Exhibit
                          Standards and Regulation
                          2012-09-0404 September 2012Building Management after Earthquakes hearing: Memorandum of counsel for Christchurch City CouncilBuilding Management after Earthquakes hearing: Memorandum of counsel for Christchurch City Council
                            Christchurch City Council
                            Exhibit
                            Building assessments after earthquakes
                            2012-09-0404 September 2012Building Management after Earthquakes hearing: Building Evaluation and Occupancy Assessment flowchartsBuilding Management after Earthquakes hearing: Building Evaluation and Occupancy Assessment flowcharts
                              Department of Building and Housing
                              Exhibit
                              Building assessments after earthquakes
                              2011-11-0707 November 2011Building Act 1991 No 150Building Act 1991 No 150
                                New Zealand Parliament
                                Exhibit
                              • Standards and Regulation
                              • Unreinforced Masonry Buildings (URM)
                                2012-07-3131 July 2012CTV Building hearing: NZS 3101 Part 1: 1982 Code of practice for the Design of Concrete StructuresCTV Building hearing: NZS 3101 Part 1: 1982 Code of practice for the Design of Concrete Structures
                                  Standards New Zealand
                                  Exhibit
                                  Standards and Regulation
                                  2012-09-1010 September 2012Training and education of engineers and organisation of the engineering profession hearing: Briefing notes of Dr Andrew Cleland Training and education of engineers and organisation of the engineering profession hearing: Briefing notes of Dr Andrew Cleland
                                    Cleland, Andrew
                                    Exhibit
                                    Training and Education
                                    2012-09-1111 September 2012Roles and responsibilities hearing: Presentation by Dr David Kelly and Dr Peter Mumford of the Ministry of Business, Innovation and Employment (formerly DBH)Roles and responsibilities hearing: Presentation by Dr David Kelly and Dr Peter Mumford of the Ministry of Business, Innovation and Employment (formerly DBH)
                                    • Department of Building and Housing
                                    • Kelly, David
                                    • Mumford, Peter John
                                      Exhibit
                                      Roles and Responsibilities
                                      2012-09-1111 September 2012Roles and responsibilities hearing: Presentation from Dr Nicki Crauford, IPENZ Deputy Chief ExecutiveRoles and responsibilities hearing: Presentation from Dr Nicki Crauford, IPENZ Deputy Chief Executive
                                      • Crauford, Nicola Lane (Nicki)
                                      • Institution of Professional Engineers New Zealand (IPENZ)
                                        Exhibit
                                      • Roles and Responsibilities
                                      • Standards and Regulation
                                        2012-09-1212 September 2012Roles and responsibilities hearing: Presentation by Dr David Kelly of the Ministry of Business, Innovation and Employment (formerly DBH) Roles and responsibilities hearing: Presentation by Dr David Kelly of the Ministry of Business, Innovation and Employment (formerly DBH)
                                        • Department of Building and Housing
                                        • Kelly, David
                                          Exhibit
                                          Roles and Responsibilities

                                          Search results navigation

                                          Displaying 859 - 878 of 931 items arrow left First arrow left Prev arrow right Next arrow right Last