Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted ascending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2012-03-0909 March 2012Colombo 382 hearing: Email from Neville Higgs regarding the inspection of 382 ColomboColombo 382 hearing: Email from Neville Higgs regarding the inspection of 382 Colombo
    Higgs, Neville
    Exhibit
    Buildings - Representative Sample
  • Colombo 380
  • Colombo 382
2012-01-2626 January 2012Manchester 200-204 hearing: Statement of Neville HiggsManchester 200-204 hearing: Statement of Neville Higgs
    Higgs, Neville
    Exhibit
    Buildings - Representative Sample
  • Manchester 200
  • Manchester 204
2012-01-2626 January 2012Manchester 200-204 hearing: Email from Neville Higgs to Royal Commission regarding note on engineer's re-inspection formManchester 200-204 hearing: Email from Neville Higgs to Royal Commission regarding note on engineer's re-inspection form
    Higgs, Neville
    Exhibit
    Buildings - Representative Sample
    Manchester 200
2012-09-1212 September 2012Roles and responsibilities hearing: Presentation by Nicholas Hill of the Building Officials Institute of New ZealandRoles and responsibilities hearing: Presentation by Nicholas Hill of the Building Officials Institute of New Zealand
    Hill, Nicholas W
    Exhibit
    Roles and Responsibilities
    2012-09-1212 September 2012Roles and responsibilities hearing: Graphic regarding BCO Training Pathway provided by Nicholas Hill of the Building Officials Institute of New ZealandRoles and responsibilities hearing: Graphic regarding BCO Training Pathway provided by Nicholas Hill of the Building Officials Institute of New Zealand
      Hill, Nicholas W
      Exhibit
      Roles and Responsibilities
      2011-12-1313 December 2011Coleridge 90 hearing: Statement of Marc HobsonColeridge 90 hearing: Statement of Marc Hobson
        Hobson, Marc
        Exhibit
        Buildings - Representative Sample
        Coleridge 90
      2012-03-1414 March 2012Presentation for the Royal Commission by the Shimizu Institute of Technology for the hearing on New Building TechnologiesPresentation for the Royal Commission by the Shimizu Institute of Technology for the hearing on New Building Technologies
        Holland, John
        Exhibit
        New Building Technologies
        2012-07-0202 July 2012CTV Building hearing: Statement of Evidence of Marie Therese Holland CTV Building hearing: Statement of Evidence of Marie Therese Holland
          Holland, Marie
          Exhibit
          Buildings - Representative Sample
          Madras 249
        2011-11-2929 November 2011Cambridge 233 PGC Building: Memorandum from John Hare, Holmes Consulting Group, to Ian Bisman, Warren & Mahoney Ltd regarding study findingsCambridge 233 PGC Building: Memorandum from John Hare, Holmes Consulting Group, to Ian Bisman, Warren & Mahoney Ltd regarding study findings
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Cambridge 233
        2012-06-2525 June 2012CTV Building hearing: Holmes Consulting Group Structural Report, January 1990CTV Building hearing: Holmes Consulting Group Structural Report, January 1990
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Madras 249
        2012-07-3131 July 2012CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report on the Office Building at 249 Madras Street CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report on the Office Building at 249 Madras Street
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Madras 249
        2012-08-1414 August 2012CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural ReportCTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Madras 249
        2011-11-2828 November 2011Cambridge 233 PGC Building: Conversion plans and costs for PGC Group from Holmes Consulting Group to Warren and Mahoney, 17 February 1997Cambridge 233 PGC Building: Conversion plans and costs for PGC Group from Holmes Consulting Group to Warren and Mahoney, 17 February 1997
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Cambridge 233
        2011-11-3030 November 2011Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Cambridge 233
        2011-11-2828 November 2011Cambridge 233 PGC Building: Letter and documents from Holmes Consulting Group regarding information on the PGC BuildingCambridge 233 PGC Building: Letter and documents from Holmes Consulting Group regarding information on the PGC Building
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Cambridge 233
        2012-03-1212 March 2012Cambridge 233 PGC Building: Standard producer statement - design is not appropriate for building consentCambridge 233 PGC Building: Standard producer statement - design is not appropriate for building consent
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Cambridge 233
        2012-02-2424 February 2012Forsyth Barr hearing: Supplementary Brief of Evidence of Henry John HareForsyth Barr hearing: Supplementary Brief of Evidence of Henry John Hare
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Colombo 764
        2012-02-2424 February 2012Forsyth Barr hearing: Letter from DLA Phillips Fox regarding further documentation on the construction of the Forsyth Barr buildingForsyth Barr hearing: Letter from DLA Phillips Fox regarding further documentation on the construction of the Forsyth Barr building
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Colombo 764
        2012-03-1313 March 2012Presentation by John Hare, Holmes Consulting Group, for the hearing on New Building TechnologiesPresentation by John Hare, Holmes Consulting Group, for the hearing on New Building Technologies
          Holmes Consulting Group
          Exhibit
          New Building Technologies
          2012-02-1515 February 2012High 246 hearing: Architectural plans from Warren & Mahoney Architects Ltd including floor plans, elevation, technical details, and structural designs, part 3 of 5High 246 hearing: Architectural plans from Warren & Mahoney Architects Ltd including floor plans, elevation, technical details, and structural designs, part 3 of 5
            Holmes Wood Poole & Johnstone Ltd
            Exhibit
            Buildings - Representative Sample
            Hereford 152

          Search results navigation

          Displaying 550 - 569 of 1169 items arrow left First arrow left Prev arrow right Next arrow right Last