Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted ascending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2012-06-2525 June 2012CTV Building hearing: Architectural and structural drawings of the office building at 249 Madras StreetCTV Building hearing: Architectural and structural drawings of the office building at 249 Madras Street
    Alan Reay Consultants Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-3131 July 2012CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report on the Office Building at 249 Madras Street CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report on the Office Building at 249 Madras Street
    Alan Reay Consultants Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-08-0101 August 2012CTV Building hearing:Collection of building permit documents for the Westpark Tower at 56 Cashel Street CTV Building hearing:Collection of building permit documents for the Westpark Tower at 56 Cashel Street
    Alan Reay Consultants Ltd
    Exhibit
  • Buildings - Other
  • Buildings - Representative Sample
  • Cashel 56
  • Madras 249
2012-08-1414 August 2012CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural ReportCTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report
    Alan Reay Consultants Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-08-0707 August 2012CTV Building hearing: Letter from Alan Reay Consultants to DBH regarding the CTV investigation draft reportCTV Building hearing: Letter from Alan Reay Consultants to DBH regarding the CTV investigation draft report
    Alan Reay Consultants Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-2424 July 2012 CTV Building hearing: Spreadsheet setting out responses by Alan Reay Consultants Ltd to aspects of DBH draft report CTV Building hearing: Spreadsheet setting out responses by Alan Reay Consultants Ltd to aspects of DBH draft report
    Alan Reay Consultants Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-08-0909 August 2012CTV Building hearing: Seismic load analysis (calculations) by Alan Reay Consultants Ltd for Williams Development, 1986CTV Building hearing: Seismic load analysis (calculations) by Alan Reay Consultants Ltd for Williams Development, 1986
    Alan Reay Consultants Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-08-0909 August 2012CTV Building hearing: Gravity elements calculations by Alan Reay Consultants Ltd for Williams Development, 1986 CTV Building hearing: Gravity elements calculations by Alan Reay Consultants Ltd for Williams Development, 1986
    Alan Reay Consultants Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-08-0606 August 2012CTV Building hearing: Structural drawings in relation to Landsborough House, dated February 1985CTV Building hearing: Structural drawings in relation to Landsborough House, dated February 1985
    Alan Reay Consultants Ltd
    Exhibit
  • Buildings - Other
  • Buildings - Representative Sample
  • Durham 287
  • Madras 249
2012-11-2222 November 2012 CTV Building hearing - Madras 249 CTV Building - Letter dated 3 May 2011 from Alan Reay of Alan Reay Consultants Ltd to Clark Hyland of Hyland Fatigue and Earthquake Engineering CTV Building hearing - Madras 249 CTV Building - Letter dated 3 May 2011 from Alan Reay of Alan Reay Consultants Ltd to Clark Hyland of Hyland Fatigue and Earthquake Engineering
    Alan Reay Consultants Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-11-2222 November 2012CTV Building hearing - Letter from Alan Reay to Clark Hyland dated 21 April 2011confirming information request.CTV Building hearing - Letter from Alan Reay to Clark Hyland dated 21 April 2011confirming information request.
    Alan Reay Consultants Ltd
    Exhibit
  • Buildings - Representative Sample
  • Geotechnical
  • Structural Performance
    Madras 249
2012-06-2525 June 2012CTV Building hearing: Architectural and structural drawings of the office building at 249 Madras StreetCTV Building hearing: Architectural and structural drawings of the office building at 249 Madras Street
    Alun Wilkie Architects Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2011-12-1515 December 2011Riccarton 7 hearing: Statement of Lynette AndrellRiccarton 7 hearing: Statement of Lynette Andrell
    Andrell, Lynette
    Exhibit
    Buildings - Representative Sample
    Riccarton 7
2012-11-2323 November 2012CTV Building hearing: Post earthquake building performance assessment formCTV Building hearing: Post earthquake building performance assessment form
    Applied Technology Council
    Exhibit
    Building assessments after earthquakes
    2011-10-2121 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph Archuleta, October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph Archuleta, October 2011
      Archuleta, Ralph J
    • Exhibit
    • Technical Report
      Seismicity
      2012-02-1616 February 2012Colombo 382 hearing: Statement of Cheryl ArmourColombo 382 hearing: Statement of Cheryl Armour
        Armour, Cheryl
        Exhibit
        Buildings - Representative Sample
      • Colombo 380
      • Colombo 382
      2011-11-0909 November 2011Photos of the Mt Eden Road Shopping Centre, Auckland supplied by Joe Arts - full sized slidesPhotos of the Mt Eden Road Shopping Centre, Auckland supplied by Joe Arts - full sized slides
        Arts, Joe
        Exhibit
        Unreinforced Masonry Buildings (URM)
        2011-10-2727 October 2011Unreinforced masonry and other earthquake prone buildings - Requirements for seismic strengthening: Submission by Joe Arts, October 2011Unreinforced masonry and other earthquake prone buildings - Requirements for seismic strengthening: Submission by Joe Arts, October 2011
          Arts, Joe
        • Exhibit
        • Submission
          Unreinforced Masonry Buildings (URM)
          High 137-139
        2012-03-1313 March 2012Submission on the Paper "Design of Conventional Structural Systems Following the Canterbury Earthquakes" by Colin Ashby of Ashby Consulting Engineering Ltd, March 2012Submission on the Paper "Design of Conventional Structural Systems Following the Canterbury Earthquakes" by Colin Ashby of Ashby Consulting Engineering Ltd, March 2012
          Ashby Consulting Engineering Ltd
        • Exhibit
        • Submission
        • New Building Technologies
        • Standards and Regulation
          2012-03-1313 March 2012Submission on the Paper "Design of Conventional Structural Systems Following the Canterbury Earthquakes" by Colin Ashby of Ashby Consulting Engineering Ltd, March 2012Submission on the Paper "Design of Conventional Structural Systems Following the Canterbury Earthquakes" by Colin Ashby of Ashby Consulting Engineering Ltd, March 2012
            Ashby, Colin
          • Exhibit
          • Submission
          • New Building Technologies
          • Standards and Regulation

            Search results navigation

            Displaying 3 - 22 of 1169 items arrow left First arrow left Prev arrow right Next arrow right Last