Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted ascending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-10-1818 October 2011GNS Science - Likely Future Rates of Seismicity in Christchurch - Presentation to the Canterbury Earthquakes Royal CommissionGNS Science - Likely Future Rates of Seismicity in Christchurch - Presentation to the Canterbury Earthquakes Royal Commission
    Webb, T H (Terry)
    Exhibit
    Seismicity
    2011-10-2020 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011- Report Extract - pages 34-36Canterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011- Report Extract - pages 34-36
      Webb, T H (Terry)
      Exhibit
      Seismicity
      2011-10-2121 October 2011Z-factor Graph: Technical Report by GNS Science, October 2011Z-factor Graph: Technical Report by GNS Science, October 2011
        Webb, T H (Terry)
      • Exhibit
      • Technical Report
        Seismicity
        2011-10-2020 October 2011GNS Science - The Canterbury Earthquake Sequence - Shaking measures by instruments versus distance, compared to NZ model - Presentation to the Canterbury Earthquakes Royal Commission by Dr Terry WebbGNS Science - The Canterbury Earthquake Sequence - Shaking measures by instruments versus distance, compared to NZ model - Presentation to the Canterbury Earthquakes Royal Commission by Dr Terry Webb
          Webb, T H (Terry)
          Exhibit
          Seismicity
          2011-11-1414 November 2011Photos of Buildings in Wellington: Presentation by Wellington City Council, November 2011Photos of Buildings in Wellington: Presentation by Wellington City Council, November 2011
            Wellington City Council
            Exhibit
          • Standards and Regulation
          • Unreinforced Masonry Buildings (URM)
            2012-01-2525 January 2012Hereford 194 hearing: Statement from James WhelanHereford 194 hearing: Statement from James Whelan
              Whelan, James
              Exhibit
              Buildings - Representative Sample
              Hereford 194
            2012-07-0202 July 2012CTV Building hearing: Email from John Drew to Ibbotson Cooney Limited regarding insurance claims for windows and green stickering of the building, September 2010CTV Building hearing: Email from John Drew to Ibbotson Cooney Limited regarding insurance claims for windows and green stickering of the building, September 2010
              White Fox & Jones Lawyers
              Exhibit
              Buildings - Representative Sample
              Madras 249
            2012-09-0404 September 2012Building Management after Eathquakes hearing: Collection of documents in relation to building demolition at 192 Madras StreetBuilding Management after Eathquakes hearing: Collection of documents in relation to building demolition at 192 Madras Street
              White Fox & Jones Lawyers
              Exhibit
              Building assessments after earthquakes
              Madras 192
            2011-11-3030 November 2011Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010
              Whiteside, Mark
              Exhibit
              Buildings - Representative Sample
              Cambridge 233
            2011-12-1515 December 2011 Worcester 391 hearing: Documents pertaining to David Whyte, Whyte Construction Ltd Worcester 391 hearing: Documents pertaining to David Whyte, Whyte Construction Ltd
              Whyte, David
              Exhibit
              Buildings - Representative Sample
            • Worcester 389
            • Worcester 391
            2012-01-2525 January 2012Hereford 194 hearing: Statement of Phil WilbyHereford 194 hearing: Statement of Phil Wilby
              Wilby, Phil
              Exhibit
              Buildings - Representative Sample
              Hereford 194
            2012-08-1717 August 2012CTV Building hearing: Brief of Evidence of Peter John Wilding CTV Building hearing: Brief of Evidence of Peter John Wilding
              Wilding, Peter
              Exhibit
              Buildings - Representative Sample
              Madras 249
            2012-11-2626 November 2012CTV Building hearing: Email exchange between the Royal Commission and Richard Raymond with a query regarding shear wallsCTV Building hearing: Email exchange between the Royal Commission and Richard Raymond with a query regarding shear walls
              Wilkie, A T
              Exhibit
              Buildings - Representative Sample
              Madras 249
            2012-07-3030 July 2012CTV Building hearing: Brief of Evidence of Alun Trevor WilkieCTV Building hearing: Brief of Evidence of Alun Trevor Wilkie
              Wilkie, A T
              Exhibit
              Buildings - Representative Sample
              Madras 249
            2012-03-1212 March 2012Presentation by Grant Wilkinson, Ruamoko Solutions, for the hearing on New Building TechnologiesPresentation by Grant Wilkinson, Ruamoko Solutions, for the hearing on New Building Technologies
              Wilkinson, Grant
              Exhibit
              New Building Technologies
              2012-03-1212 March 2012Biography of Grant WilkinsonBiography of Grant Wilkinson
                Wilkinson, Grant
                Exhibit
              • New Building Technologies
              • Profile
                2011-11-2828 November 2011Cambridge 233 PGC Building: Conversion plans and costs for PGC Group from Holmes Consulting Group to Warren and Mahoney, 17 February 1997Cambridge 233 PGC Building: Conversion plans and costs for PGC Group from Holmes Consulting Group to Warren and Mahoney, 17 February 1997
                  Wilkinson, Grant
                  Exhibit
                  Buildings - Representative Sample
                  Cambridge 233
                2012-08-1616 August 2012CTV Building hearing: Statement of Evidence of Grant WilkinsonCTV Building hearing: Statement of Evidence of Grant Wilkinson
                  Wilkinson, Grant
                  Exhibit
                  Buildings - Representative Sample
                  Madras 249
                2012-03-1212 March 2012Cambridge 233 PGC Building: Standard producer statement - design is not appropriate for building consentCambridge 233 PGC Building: Standard producer statement - design is not appropriate for building consent
                  Wilkinson, Grant
                  Exhibit
                  Buildings - Representative Sample
                  Cambridge 233
                2012-07-3131 July 2012CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report on the Office Building at 249 Madras Street CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report on the Office Building at 249 Madras Street
                  Wilkinson, Grant
                  Exhibit
                  Buildings - Representative Sample
                  Madras 249

                Search results navigation

                Displaying 1110 - 1129 of 1169 items arrow left First arrow left Prev arrow right Next arrow right Last