Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Sorted descending Action
2012-08-17-14- 11-0417 August 2012Building Management after Earthquakes: Submission by IPENZ on Royal Commission Discussion PaperBuilding Management after Earthquakes: Submission by IPENZ on Royal Commission Discussion Paper
    Institution of Professional Engineers New Zealand (IPENZ)
    Submission
  • Building assessments after earthquakes
  • Placarding (Stickering)
  • Safety Evaluation
    2012-08-15-11- 36-0715 August 2012CTV Building hearing: Reinforced Concrete Structures, by R Park and T Paulay, Section 6.4CTV Building hearing: Reinforced Concrete Structures, by R Park and T Paulay, Section 6.4
    • Park, R
    • Paulay, Park
      Exhibit
      Engineering
      2012-02-13-11- 44-5913 February 2012Submission by Christchurch City Council regarding response to Enfocus reportSubmission by Christchurch City Council regarding response to Enfocus report
        Christchurch City Council
        Submission
      • Building Failure
      • Safety Evaluation
        2012-11-27-15- 54-4827 November 2012Assessment of hollow-core floors for seismic performance - research reportAssessment of hollow-core floors for seismic performance - research report
        • Bull, Des
        • Fenwick, Richard
        • Gardiner, Debra
        • University of Canterbury
          Referenced Document
          Engineering
          2012-11-27-16- 04-2027 November 2012Guide to the National Civil Defence and Emergency Management PlanGuide to the National Civil Defence and Emergency Management Plan
            Ministry of Civil Defence & Emergency Management
            Referenced Document
            Emergency Powers and Procedures
            2011-11-15-09- 07-5115 November 20112011-11-09 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript2011-11-09 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript
              Speakers - Various
              Transcript
              Unreinforced Masonry Buildings (URM)
              2011-11-15-16- 11-5015 November 2011Objectives, status, and future of the 2006 NZSEE Guidelines on 'Assessment and Improvement of the Structural Performance of Buildings in Earthquakes': Presentation by Rob Jury, 15 November 2011Objectives, status, and future of the 2006 NZSEE Guidelines on 'Assessment and Improvement of the Structural Performance of Buildings in Earthquakes': Presentation by Rob Jury, 15 November 2011
                Jury, Rob
                Exhibit
              • Standards and Regulation
              • Unreinforced Masonry Buildings (URM)
                2012-03-12-13- 11-2812 March 2012Comments on Seismicity and Building Zone Factors: Submission by Ross Thomson, September 2011Comments on Seismicity and Building Zone Factors: Submission by Ross Thomson, September 2011
                  Thomson, Ross
                  Submission
                • Seismicity
                • Unreinforced Masonry Buildings (URM)
                  2012-11-27-16- 15-5327 November 2012Safety Assessment Program Coordinator Student Manual by the California Emergency Management Agency, version 5, January 2012Safety Assessment Program Coordinator Student Manual by the California Emergency Management Agency, version 5, January 2012
                    California Emergency Management Agency
                    Referenced Document
                  • Building assessments after earthquakes
                  • Placarding (Stickering)
                  • Safety Evaluation
                    2011-10-21-13- 17-3521 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011
                    • GNS Science
                    • Webb, T H (Terry)
                      Technical Report
                      Seismicity
                      2012-11-27-16- 18-3327 November 2012Science Advice for Critical Decision Making, book chapter by E.E. Doyle and D.M JohnstonScience Advice for Critical Decision Making, book chapter by E.E. Doyle and D.M Johnston
                      • Doyle, Emma E H
                      • Johnston, David M
                        Referenced Document
                      • Civil Defence
                      • Emergency Powers and Procedures
                      • Seismicity
                        2012-08-22-10- 11-2422 August 2012 Roles and Responsibilities: Submission from the New Zealand Concrete Society on the Royal Commission Discussion Paper, August 2012 Roles and Responsibilities: Submission from the New Zealand Concrete Society on the Royal Commission Discussion Paper, August 2012
                          New Zealand Concrete Society
                          Submission
                        • Roles and Responsibilities
                        • Standards and Regulation
                          2011-10-28-10- 45-1128 October 2011Foundations on Deep Alluvial Soils: Submission by Ross Thompson, September 2011Foundations on Deep Alluvial Soils: Submission by Ross Thompson, September 2011
                            Thomson, Ross
                            Submission
                            Geotechnical
                            2011-11-07-13- 16-1707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
                            • Middleton, David
                            • Westlake, Richard
                              Technical Report
                            • Building assessments after earthquakes
                            • Christchurch Recovery
                            • Civil Defence
                            • Emergency Powers and Procedures
                            • Placarding (Stickering)
                            • Safety Evaluation
                              2011-11-03-16- 05-5003 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, September 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, September 2011
                                Turner, Fred
                                Technical Report
                                Unreinforced Masonry Buildings (URM)
                                2012-03-09-17- 39-0909 March 2012 Overview over the New Zealand Building Control System Overview over the New Zealand Building Control System
                                  Department of Building and Housing
                                  Exhibit
                                • New Building Technologies
                                • Standards and Regulation
                                  2012-09-11-11- 47-3711 September 2012Roles and responsibilities hearing: Supplementary graphics and diagrams referenced by John Scarry Roles and responsibilities hearing: Supplementary graphics and diagrams referenced by John Scarry
                                    Scarry, John
                                    Exhibit
                                    Roles and Responsibilities
                                    2012-03-12-13- 01-0112 March 2012GNS Science - Implications for structural design motions - February Spectra and NZS1170 design levels - four Geonet sites closest to CBD: Presentation to the Canterbury Earthquakes Royal Commission, October 2011GNS Science - Implications for structural design motions - February Spectra and NZS1170 design levels - four Geonet sites closest to CBD: Presentation to the Canterbury Earthquakes Royal Commission, October 2011
                                    • GNS Science
                                    • McVerry, Graeme
                                      Exhibit
                                      Seismicity
                                      2011-11-28-17- 49-3828 November 2011Gisborne District Council - Earthquake Prone Building Policy Revision 3Gisborne District Council - Earthquake Prone Building Policy Revision 3
                                        Gisborne District Council
                                        Exhibit
                                      • Standards and Regulation
                                      • Unreinforced Masonry Buildings (URM)
                                        2012-08-27-13- 59-5027 August 2012Training and Education of Engineers and Organisation of the Engineering Profession: Submission from Matt Furness on the Royal Commission Discussion Paper, August 2012Training and Education of Engineers and Organisation of the Engineering Profession: Submission from Matt Furness on the Royal Commission Discussion Paper, August 2012
                                          Furness, Matt
                                          Submission
                                        • Engineering
                                        • Training and Education

                                          Search results navigation

                                          Displaying 382 - 401 of 1517 items arrow left First arrow left Prev arrow right Next arrow right Last