Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Sorted ascending Action
2012-09-06-09- 14-1906 September 20122012-09-04 Building Management after Earthquakes hearing transcript2012-09-04 Building Management after Earthquakes hearing transcript
    Speakers - Various
    Transcript
    Building assessments after earthquakes
    2012-03-12-13- 07-3512 March 2012Presentation by Dr Rajesh Prasad Dhakal, University of Canterbury, for the hearing on New Building Technologies Presentation by Dr Rajesh Prasad Dhakal, University of Canterbury, for the hearing on New Building Technologies
      Dhakal, Rajesh P
      Exhibit
      New Building Technologies
      2012-09-13-11- 21-1913 September 2012National Building Consent Authority Competency Assessment System: Department of Building and Housing guidance documentNational Building Consent Authority Competency Assessment System: Department of Building and Housing guidance document
        Department of Building and Housing
        Post hearing submission
        Roles and Responsibilities
        2012-09-13-11- 00-3413 September 2012 IPENZ collection of published articles IPENZ collection of published articles
          Institution of Professional Engineers New Zealand (IPENZ)
          Post hearing submission
        • Engineering
        • Training and Education
          2012-03-14-16- 43-3514 March 2012Biography of Dr Nicola Crauford, Genesis Power LtdBiography of Dr Nicola Crauford, Genesis Power Ltd
            Crauford, Nicola Lane (Nicki)
            Exhibit
          • New Building Technologies
          • Roles and Responsibilities
            2012-09-04-16- 11-4504 September 2012Building Management after Earthquakes hearing: Christchurch City Council Report into Building Safety Evaluation Processes in the Central Business District following the 22 February 2011 EarthquakeBuilding Management after Earthquakes hearing: Christchurch City Council Report into Building Safety Evaluation Processes in the Central Business District following the 22 February 2011 Earthquake
              Christchurch City Council
              Exhibit
              Building assessments after earthquakes
              2012-09-14-14- 09-5414 September 20122012-09-12 Roles and Responsibilities hearing transcript2012-09-12 Roles and Responsibilities hearing transcript
                Speakers - Various
                Transcript
                Roles and Responsibilities
                2012-09-12-15- 30-3312 September 2012Roles and responsibilities hearing: Presentation from Geoff Hallam of International Accreditation New Zealand (IANZ) Roles and responsibilities hearing: Presentation from Geoff Hallam of International Accreditation New Zealand (IANZ)
                • Hallam, Geoff
                • International Accreditation New Zealand (IANZ)
                  Exhibit
                  Roles and Responsibilities
                  2012-08-09-15- 39-3509 August 2012CTV Building hearing: NZS 3101 Part 2: 1982 Commentary on The Design Of Concrete StructuresCTV Building hearing: NZS 3101 Part 2: 1982 Commentary on The Design Of Concrete Structures
                    Standards New Zealand
                    Exhibit
                    Standards and Regulation
                    2012-03-09-08- 38-5809 March 2012Christchurch - Swamp to City - A Short History of the Christchurch Drainage Board 1875-1989, by John Wilson 1989: Submission by Ken Sibly, September 2011Christchurch - Swamp to City - A Short History of the Christchurch Drainage Board 1875-1989, by John Wilson 1989: Submission by Ken Sibly, September 2011
                      Wilson, John
                      Submission
                      Geotechnical
                      2012-11-27-16- 01-0927 November 2012The Analysis and Design of and the Evaluation of Design Actions for Reinforced Concrete Ductile Shear Wall Structures, article by T. Paulay and R.L. WilliamsThe Analysis and Design of and the Evaluation of Design Actions for Reinforced Concrete Ductile Shear Wall Structures, article by T. Paulay and R.L. Williams
                      • Paulay, Thomas
                      • Williams, Roger L
                        Referenced Document
                        Engineering
                        2012-03-12-16- 23-3212 March 2012Summary of presentation for the hearing on New Building Technologies by Meagan Leigh DevineSummary of presentation for the hearing on New Building Technologies by Meagan Leigh Devine
                          Devine, Megan Leigh
                          Exhibit
                          New Building Technologies
                          2012-08-15-16- 24-3615 August 2012Building Management after Earthquakes: Submission by the Department of Building and Housing on the Royal Commission Discussion Paper, July 2012Building Management after Earthquakes: Submission by the Department of Building and Housing on the Royal Commission Discussion Paper, July 2012
                          • Department of Building and Housing
                          • Kelly, David
                            Submission
                          • Building assessments after earthquakes
                          • Engineering
                          • Placarding (Stickering)
                          • Safety Evaluation
                            2012-11-28-12- 22-3228 November 2012Summary by Dr Terry Webb of recent seismic hazard modelling by GNS ScienceSummary by Dr Terry Webb of recent seismic hazard modelling by GNS Science
                            • GNS Science
                            • Webb, T H (Terry)
                              Referenced Document
                              Seismicity
                              2012-11-27-16- 22-0827 November 2012Paper on An Efficient System for Acquiring Earthquake Damage Information in Damage Area, by A. Shibayama and Y. HisadaPaper on An Efficient System for Acquiring Earthquake Damage Information in Damage Area, by A. Shibayama and Y. Hisada
                              • Hisada, Yoshiaki
                              • Shibayama, Akihiro
                                Referenced Document
                              • Building assessments after earthquakes
                              • Placarding (Stickering)
                              • Safety Evaluation
                                2011-11-07-14- 28-4607 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 4 of 5, Page 147-170Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 4 of 5, Page 147-170
                                  Christchurch City Council
                                  Technical Report
                                  Placarding (Stickering)
                                  2012-08-22-12- 22-3322 August 2012Roles and Responsibilities: Submission from Environment Canterbury Regional Council on the Royal Commission Discussion Paper, August 2012Roles and Responsibilities: Submission from Environment Canterbury Regional Council on the Royal Commission Discussion Paper, August 2012
                                    Environment Canterbury Regional Council
                                    Submission
                                  • Roles and Responsibilities
                                  • Standards and Regulation
                                    2012-08-17-14- 11-0417 August 2012Building Management after Earthquakes: Submission by IPENZ on Royal Commission Discussion PaperBuilding Management after Earthquakes: Submission by IPENZ on Royal Commission Discussion Paper
                                      Institution of Professional Engineers New Zealand (IPENZ)
                                      Submission
                                    • Building assessments after earthquakes
                                    • Placarding (Stickering)
                                    • Safety Evaluation
                                      2012-08-15-11- 36-0715 August 2012CTV Building hearing: Reinforced Concrete Structures, by R Park and T Paulay, Section 6.4CTV Building hearing: Reinforced Concrete Structures, by R Park and T Paulay, Section 6.4
                                      • Park, R
                                      • Paulay, Park
                                        Exhibit
                                        Engineering
                                        2012-02-13-11- 44-5913 February 2012Submission by Christchurch City Council regarding response to Enfocus reportSubmission by Christchurch City Council regarding response to Enfocus report
                                          Christchurch City Council
                                          Submission
                                        • Building Failure
                                        • Safety Evaluation

                                          Search results navigation

                                          Displaying 1437 - 1456 of 1517 items arrow left First arrow left Prev arrow right Next arrow right Last