Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Sorted ascending Action
2011-11-03-16- 06-0303 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011
  • Lizundia, Bret
  • Rutherford & Chekene
    Technical Report
    Unreinforced Masonry Buildings (URM)
    2012-01-30-11- 39-0930 January 2012Submission by Steel Construction New Zealand Inc, November 2011Submission by Steel Construction New Zealand Inc, November 2011
      Fussell, Alistair
      Submission
    • Engineering
    • New Building Technologies
      2011-12-05-15- 08-4805 December 2011Preliminary Observations from Christchurch Earthquakes: Report by Structural Engineering Society of New Zealand, September 2011Preliminary Observations from Christchurch Earthquakes: Report by Structural Engineering Society of New Zealand, September 2011
        Structural Engineering Society of New Zealand
          Engineering
          2011-11-10-09- 57-4710 November 2011Letter from Selwyn District Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Selwyn District Council about unreinforced masonry (URM) and earthquake-prone building policies
          • Christensen, John
          • Selwyn District Council
            RFI Response
          • Standards and Regulation
          • Unreinforced Masonry Buildings (URM)
            2011-10-21-14- 34-5821 October 2011Preliminary Observations from Christchurch Earthquakes: Technical Report by John Hare in conjunction with Structural Engineering Society of New Zealand, August 2011Preliminary Observations from Christchurch Earthquakes: Technical Report by John Hare in conjunction with Structural Engineering Society of New Zealand, August 2011
              Structural Engineering Society of New Zealand
              Technical Report
              Engineering
              2011-12-21-14- 12-0121 December 2011Practice Note - Design of Conventional Structural Systems Following Canterbury Earthquakes: Submission by Structural Engineering Society of New Zealand, December 2011Practice Note - Design of Conventional Structural Systems Following Canterbury Earthquakes: Submission by Structural Engineering Society of New Zealand, December 2011
                Structural Engineering Society of New Zealand
              • Submission
              • Technical Report
                Engineering
                2011-11-10-09- 29-1110 November 2011Letter from Tararua District Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Tararua District Council about unreinforced masonry (URM) and earthquake-prone building policies
                  King, Blair
                  RFI Response
                • RFI and EOI
                • Standards and Regulation
                  2011-11-10-09- 51-2810 November 2011Letter from Tasman District Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Tasman District Council about unreinforced masonry (URM) and earthquake-prone building policies
                    Humphries, Adrian
                    RFI Response
                  • RFI and EOI
                  • Standards and Regulation
                    2011-10-27-17- 26-5327 October 2011Submission by Adam William Thornton, October 2011Submission by Adam William Thornton, October 2011
                      Thornton, Adam William
                      Submission
                    • Engineering
                    • Unreinforced Masonry Buildings (URM)
                      2012-03-12-13- 11-2812 March 2012Comments on Seismicity and Building Zone Factors: Submission by Ross Thomson, September 2011Comments on Seismicity and Building Zone Factors: Submission by Ross Thomson, September 2011
                        Thomson, Ross
                        Submission
                      • Seismicity
                      • Unreinforced Masonry Buildings (URM)
                        2012-01-30-11- 38-0430 January 2012Christchurch Earthquake Series: The Case for Structural Steel Systems: Submission by G Charles Clifton, University of Auckland, December 2011Christchurch Earthquake Series: The Case for Structural Steel Systems: Submission by G Charles Clifton, University of Auckland, December 2011
                        • Clifton, Charles
                        • University of Auckland
                          Submission
                        • Engineering
                        • New Building Technologies
                          2011-11-04-16- 38-5004 November 2011Submission by Wellington City CouncilSubmission by Wellington City Council
                            Wellington City Council
                            Submission
                            Standards and Regulation
                            2011-11-14-17- 30-2514 November 2011Photos of Buildings in Wellington: Presentation by Wellington City Council, November 2011Photos of Buildings in Wellington: Presentation by Wellington City Council, November 2011
                              Wellington City Council
                              Exhibit
                            • Standards and Regulation
                            • Unreinforced Masonry Buildings (URM)
                              2011-11-10-09- 59-3610 November 2011Letter from Waimakariri District Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Waimakariri District Council about unreinforced masonry (URM) and earthquake-prone building policies
                              • Harrison, Nick
                              • Waimakariri District Council
                                RFI Response
                              • Standards and Regulation
                              • Unreinforced Masonry Buildings (URM)
                                2011-11-10-16- 58-2710 November 2011Earthquake-Prone Buildings Policy: Report from Wairoa District CouncilEarthquake-Prone Buildings Policy: Report from Wairoa District Council
                                  Wairoa District Council
                                  RFI Response
                                  Standards and Regulation
                                  2011-10-27-16- 54-3727 October 2011Submission by International Council on Monuments and Sites ( ICOMOS) New Zealand, October 2011Submission by International Council on Monuments and Sites ( ICOMOS) New Zealand, October 2011
                                    Jones, Kevin
                                    Submission
                                  • Culture and Heritage
                                  • Unreinforced Masonry Buildings (URM)
                                    2011-10-27-17- 24-1927 October 2011Submission by Local Government New Zealand, October 2011Submission by Local Government New Zealand, October 2011
                                      Local Government New Zealand
                                      Submission
                                    • Buildings - Other
                                    • Standards and Regulation
                                    • Unreinforced Masonry Buildings (URM)
                                      2011-10-27-17- 15-5527 October 2011Submission by New Zealand Historic Places Trust - Appendix 1: Maps, October 2011Submission by New Zealand Historic Places Trust - Appendix 1: Maps, October 2011
                                      • Jackson, Nicola
                                      • New Zealand Historic Places Trust
                                        Submission
                                      • Central Business District (CBD)
                                      • Culture and Heritage
                                        2011-10-27-17- 18-4027 October 2011Submission by the New Zealand Historic Places Trust - Appendix 2: Damage to Central Christchurch (as at 13 October 2011) Submission by the New Zealand Historic Places Trust - Appendix 2: Damage to Central Christchurch (as at 13 October 2011)
                                        • Jackson, Nicola
                                        • New Zealand Historic Places Trust
                                          Submission
                                        • Central Business District (CBD)
                                        • Culture and Heritage
                                          2011-10-27-17- 13-3927 October 2011Submission by New Zealand Historic Places Trust, October 2011Submission by New Zealand Historic Places Trust, October 2011
                                          • Jackson, Nicola
                                          • New Zealand Historic Places Trust
                                            Submission
                                          • Central Business District (CBD)
                                          • Culture and Heritage
                                          • Unreinforced Masonry Buildings (URM)

                                            Search results navigation

                                            Displaying 1183 - 1202 of 1517 items arrow left First arrow left Prev arrow right Next arrow right Last