Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted ascending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-10-18-13- 40-1118 October 2011GNS Science - Likely Future Rates of Seismicity in Christchurch - Presentation to the Canterbury Earthquakes Royal CommissionGNS Science - Likely Future Rates of Seismicity in Christchurch - Presentation to the Canterbury Earthquakes Royal Commission
    Webb, T H (Terry)
    Exhibit
    Seismicity
    2011-10-20-11- 15-4420 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011- Report Extract - pages 34-36Canterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011- Report Extract - pages 34-36
      Webb, T H (Terry)
      Exhibit
      Seismicity
      2011-10-21-11- 33-0721 October 2011Z-factor Graph: Technical Report by GNS Science, October 2011Z-factor Graph: Technical Report by GNS Science, October 2011
        Webb, T H (Terry)
      • Exhibit
      • Technical Report
        Seismicity
        2011-10-20-13- 19-0620 October 2011GNS Science - The Canterbury Earthquake Sequence - Shaking measures by instruments versus distance, compared to NZ model - Presentation to the Canterbury Earthquakes Royal Commission by Dr Terry WebbGNS Science - The Canterbury Earthquake Sequence - Shaking measures by instruments versus distance, compared to NZ model - Presentation to the Canterbury Earthquakes Royal Commission by Dr Terry Webb
          Webb, T H (Terry)
          Exhibit
          Seismicity
          2012-11-28-12- 22-3228 November 2012Summary by Dr Terry Webb of recent seismic hazard modelling by GNS ScienceSummary by Dr Terry Webb of recent seismic hazard modelling by GNS Science
            Webb, T H (Terry)
            Referenced Document
            Seismicity
            2011-10-21-13- 17-3521 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011
              Webb, T H (Terry)
              Technical Report
              Seismicity
              2012-08-15-15- 52-5615 August 2012Building Management After Earthquakes: Submission from Auckland Council on the Royal Commission Discussion Paper, July 2012Building Management After Earthquakes: Submission from Auckland Council on the Royal Commission Discussion Paper, July 2012
                Weight, Tim
                Submission
              • Building assessments after earthquakes
              • Placarding (Stickering)
              • Safety Evaluation
                2011-11-14-17- 30-2514 November 2011Photos of Buildings in Wellington: Presentation by Wellington City Council, November 2011Photos of Buildings in Wellington: Presentation by Wellington City Council, November 2011
                  Wellington City Council
                  Exhibit
                • Standards and Regulation
                • Unreinforced Masonry Buildings (URM)
                  2011-11-04-16- 38-5004 November 2011Submission by Wellington City CouncilSubmission by Wellington City Council
                    Wellington City Council
                    Submission
                    Standards and Regulation
                    2012-08-22-12- 46-2222 August 2012Roles and Responsibilities: Submission from Wellington City Council on the Royal Commission Discussion Paper, August 2012Roles and Responsibilities: Submission from Wellington City Council on the Royal Commission Discussion Paper, August 2012
                      Wellington City Council
                      Submission
                    • Roles and Responsibilities
                    • Standards and Regulation
                      2011-11-07-13- 16-1707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
                        Westlake, Richard
                        Technical Report
                        Christchurch Recovery
                        2011-11-07-13- 16-1707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
                          Westlake, Richard
                          Technical Report
                        • Building assessments after earthquakes
                        • Christchurch Recovery
                        • Civil Defence
                        • Emergency Powers and Procedures
                        • Placarding (Stickering)
                        • Safety Evaluation
                          2012-11-28-12- 06-1728 November 2012CTV Building hearing: Closing submissions of counsel for David CoatsworthCTV Building hearing: Closing submissions of counsel for David Coatsworth
                            Weston, Tom
                            Closing Statement
                            Buildings - Representative Sample
                            Madras 249
                          2012-01-25-09- 57-0625 January 2012Hereford 194 hearing: Statement from James WhelanHereford 194 hearing: Statement from James Whelan
                            Whelan, James
                            Exhibit
                            Buildings - Representative Sample
                            Hereford 194
                          2012-07-02-15- 01-0702 July 2012CTV Building hearing: Email from John Drew to Ibbotson Cooney Limited regarding insurance claims for windows and green stickering of the building, September 2010CTV Building hearing: Email from John Drew to Ibbotson Cooney Limited regarding insurance claims for windows and green stickering of the building, September 2010
                            White Fox & Jones Lawyers
                            Exhibit
                            Buildings - Representative Sample
                            Madras 249
                          2012-09-04-16- 22-0404 September 2012Building Management after Eathquakes hearing: Collection of documents in relation to building demolition at 192 Madras StreetBuilding Management after Eathquakes hearing: Collection of documents in relation to building demolition at 192 Madras Street
                            White Fox & Jones Lawyers
                            Exhibit
                            Building assessments after earthquakes
                            Madras 192
                          2011-11-30-12- 29-0530 November 2011Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010
                            Whiteside, Mark
                            Exhibit
                            Buildings - Representative Sample
                            Cambridge 233
                          2011-12-15-14- 09-1115 December 2011 Worcester 391 hearing: Documents pertaining to David Whyte, Whyte Construction Ltd Worcester 391 hearing: Documents pertaining to David Whyte, Whyte Construction Ltd
                            Whyte, David
                            Exhibit
                            Buildings - Representative Sample
                          • Worcester 389
                          • Worcester 391
                          2012-01-25-12- 22-2725 January 2012Hereford 194 hearing: Statement of Phil WilbyHereford 194 hearing: Statement of Phil Wilby
                            Wilby, Phil
                            Exhibit
                            Buildings - Representative Sample
                            Hereford 194
                          2012-08-17-17- 52-2417 August 2012CTV Building hearing: Brief of Evidence of Peter John Wilding CTV Building hearing: Brief of Evidence of Peter John Wilding
                            Wilding, Peter
                            Exhibit
                            Buildings - Representative Sample
                            Madras 249

                          Search results navigation

                          Displaying 1823 - 1842 of 1948 items arrow left First arrow left Prev arrow right Next arrow right Last