Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted ascending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-10-17-17- 30-3217 October 2011GNS Science - Webb Ancillary Slides: Presentation to the Canterbury Earthquakes Royal Commission - Slide 1 - Stress triggering in TurkeyGNS Science - Webb Ancillary Slides: Presentation to the Canterbury Earthquakes Royal Commission - Slide 1 - Stress triggering in Turkey
    Webb, T H (Terry)
    Exhibit
    Seismicity
    2011-10-21-13- 17-3521 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011
      Webb, T H (Terry)
      Technical Report
      Seismicity
      2011-12-06-10- 53-2106 December 20112011-10-17 Seismicity hearing transcript2011-10-17 Seismicity hearing transcript
        Webb, T H (Terry)
        Transcript
      • Geotechnical
      • Seismicity
        2012-03-12-12- 59-2412 March 20122011-10-18 Seismicity hearing transcript2011-10-18 Seismicity hearing transcript
          Webb, T H (Terry)
          Transcript
        • Geotechnical
        • Seismicity
          2012-11-28-12- 10-0728 November 2012Update to GNS Science/University of Canterbury July 2011 Report entitled The Canterbury Earthquake Sequence and Implications for Seismic Design Levels, dated 2 April 2012Update to GNS Science/University of Canterbury July 2011 Report entitled The Canterbury Earthquake Sequence and Implications for Seismic Design Levels, dated 2 April 2012
            Webb, T H (Terry)
            Referenced Document
            Seismicity
            2012-11-28-12- 22-3228 November 2012Summary by Dr Terry Webb of recent seismic hazard modelling by GNS ScienceSummary by Dr Terry Webb of recent seismic hazard modelling by GNS Science
              Webb, T H (Terry)
              Referenced Document
              Seismicity
              2011-10-21-11- 33-0721 October 2011Z-factor Graph: Technical Report by GNS Science, October 2011Z-factor Graph: Technical Report by GNS Science, October 2011
                Webb, T H (Terry)
              • Exhibit
              • Technical Report
                Seismicity
                2012-08-15-15- 52-5615 August 2012Building Management After Earthquakes: Submission from Auckland Council on the Royal Commission Discussion Paper, July 2012Building Management After Earthquakes: Submission from Auckland Council on the Royal Commission Discussion Paper, July 2012
                  Weight, Tim
                  Submission
                • Building assessments after earthquakes
                • Placarding (Stickering)
                • Safety Evaluation
                  2011-11-04-16- 38-5004 November 2011Submission by Wellington City CouncilSubmission by Wellington City Council
                    Wellington City Council
                    Submission
                    Standards and Regulation
                    2011-11-14-17- 30-2514 November 2011Photos of Buildings in Wellington: Presentation by Wellington City Council, November 2011Photos of Buildings in Wellington: Presentation by Wellington City Council, November 2011
                      Wellington City Council
                      Exhibit
                    • Standards and Regulation
                    • Unreinforced Masonry Buildings (URM)
                      2012-08-22-12- 46-2222 August 2012Roles and Responsibilities: Submission from Wellington City Council on the Royal Commission Discussion Paper, August 2012Roles and Responsibilities: Submission from Wellington City Council on the Royal Commission Discussion Paper, August 2012
                        Wellington City Council
                        Submission
                      • Roles and Responsibilities
                      • Standards and Regulation
                        2011-11-07-13- 16-1707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
                          Westlake, Richard
                          Technical Report
                          Christchurch Recovery
                          2011-11-07-13- 16-1707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
                            Westlake, Richard
                            Technical Report
                          • Building assessments after earthquakes
                          • Christchurch Recovery
                          • Civil Defence
                          • Emergency Powers and Procedures
                          • Placarding (Stickering)
                          • Safety Evaluation
                            2012-11-28-12- 06-1728 November 2012CTV Building hearing: Closing submissions of counsel for David CoatsworthCTV Building hearing: Closing submissions of counsel for David Coatsworth
                              Weston, Tom
                              Closing Statement
                              Buildings - Representative Sample
                              Madras 249
                            2012-01-25-09- 57-0625 January 2012Hereford 194 hearing: Statement from James WhelanHereford 194 hearing: Statement from James Whelan
                              Whelan, James
                              Exhibit
                              Buildings - Representative Sample
                              Hereford 194
                            2012-07-02-15- 01-0702 July 2012CTV Building hearing: Email from John Drew to Ibbotson Cooney Limited regarding insurance claims for windows and green stickering of the building, September 2010CTV Building hearing: Email from John Drew to Ibbotson Cooney Limited regarding insurance claims for windows and green stickering of the building, September 2010
                              White Fox & Jones Lawyers
                              Exhibit
                              Buildings - Representative Sample
                              Madras 249
                            2012-09-04-16- 22-0404 September 2012Building Management after Eathquakes hearing: Collection of documents in relation to building demolition at 192 Madras StreetBuilding Management after Eathquakes hearing: Collection of documents in relation to building demolition at 192 Madras Street
                              White Fox & Jones Lawyers
                              Exhibit
                              Building assessments after earthquakes
                              Madras 192
                            2011-11-30-12- 29-0530 November 2011Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010
                              Whiteside, Mark
                              Exhibit
                              Buildings - Representative Sample
                              Cambridge 233
                            2011-12-15-14- 09-1115 December 2011 Worcester 391 hearing: Documents pertaining to David Whyte, Whyte Construction Ltd Worcester 391 hearing: Documents pertaining to David Whyte, Whyte Construction Ltd
                              Whyte, David
                              Exhibit
                              Buildings - Representative Sample
                            • Worcester 389
                            • Worcester 391
                            2012-01-25-12- 22-2725 January 2012Hereford 194 hearing: Statement of Phil WilbyHereford 194 hearing: Statement of Phil Wilby
                              Wilby, Phil
                              Exhibit
                              Buildings - Representative Sample
                              Hereford 194

                            Search results navigation

                            Displaying 1822 - 1841 of 1948 items arrow left First arrow left Prev arrow right Next arrow right Last