Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted ascending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-10-19-14- 45-3719 October 2011GNS Science - National Implications and Conclusions: Presentation to the Canterbury Earthquakes Royal Commission - Pages 1 - 6GNS Science - National Implications and Conclusions: Presentation to the Canterbury Earthquakes Royal Commission - Pages 1 - 6
    Webb, T H (Terry)
    Exhibit
    Seismicity
    2011-12-06-10- 53-2106 December 20112011-10-17 Seismicity hearing transcript2011-10-17 Seismicity hearing transcript
      Webb, T H (Terry)
      Transcript
    • Geotechnical
    • Seismicity
      2012-11-28-12- 10-0728 November 2012Update to GNS Science/University of Canterbury July 2011 Report entitled The Canterbury Earthquake Sequence and Implications for Seismic Design Levels, dated 2 April 2012Update to GNS Science/University of Canterbury July 2011 Report entitled The Canterbury Earthquake Sequence and Implications for Seismic Design Levels, dated 2 April 2012
        Webb, T H (Terry)
        Referenced Document
        Seismicity
        2012-03-12-12- 59-2412 March 20122011-10-18 Seismicity hearing transcript2011-10-18 Seismicity hearing transcript
          Webb, T H (Terry)
          Transcript
        • Geotechnical
        • Seismicity
          2011-10-18-13- 40-1118 October 2011GNS Science - Likely Future Rates of Seismicity in Christchurch - Presentation to the Canterbury Earthquakes Royal CommissionGNS Science - Likely Future Rates of Seismicity in Christchurch - Presentation to the Canterbury Earthquakes Royal Commission
            Webb, T H (Terry)
            Exhibit
            Seismicity
            2011-10-20-11- 15-4420 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011- Report Extract - pages 34-36Canterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011- Report Extract - pages 34-36
              Webb, T H (Terry)
              Exhibit
              Seismicity
              2011-10-21-11- 33-0721 October 2011Z-factor Graph: Technical Report by GNS Science, October 2011Z-factor Graph: Technical Report by GNS Science, October 2011
                Webb, T H (Terry)
              • Exhibit
              • Technical Report
                Seismicity
                2011-10-20-13- 19-0620 October 2011GNS Science - The Canterbury Earthquake Sequence - Shaking measures by instruments versus distance, compared to NZ model - Presentation to the Canterbury Earthquakes Royal Commission by Dr Terry WebbGNS Science - The Canterbury Earthquake Sequence - Shaking measures by instruments versus distance, compared to NZ model - Presentation to the Canterbury Earthquakes Royal Commission by Dr Terry Webb
                  Webb, T H (Terry)
                  Exhibit
                  Seismicity
                  2012-11-28-12- 22-3228 November 2012Summary by Dr Terry Webb of recent seismic hazard modelling by GNS ScienceSummary by Dr Terry Webb of recent seismic hazard modelling by GNS Science
                    Webb, T H (Terry)
                    Referenced Document
                    Seismicity
                    2011-10-21-13- 17-3521 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011
                      Webb, T H (Terry)
                      Technical Report
                      Seismicity
                      2012-08-15-15- 52-5615 August 2012Building Management After Earthquakes: Submission from Auckland Council on the Royal Commission Discussion Paper, July 2012Building Management After Earthquakes: Submission from Auckland Council on the Royal Commission Discussion Paper, July 2012
                        Weight, Tim
                        Submission
                      • Building assessments after earthquakes
                      • Placarding (Stickering)
                      • Safety Evaluation
                        2011-11-14-17- 30-2514 November 2011Photos of Buildings in Wellington: Presentation by Wellington City Council, November 2011Photos of Buildings in Wellington: Presentation by Wellington City Council, November 2011
                          Wellington City Council
                          Exhibit
                        • Standards and Regulation
                        • Unreinforced Masonry Buildings (URM)
                          2011-11-04-16- 38-5004 November 2011Submission by Wellington City CouncilSubmission by Wellington City Council
                            Wellington City Council
                            Submission
                            Standards and Regulation
                            2012-08-22-12- 46-2222 August 2012Roles and Responsibilities: Submission from Wellington City Council on the Royal Commission Discussion Paper, August 2012Roles and Responsibilities: Submission from Wellington City Council on the Royal Commission Discussion Paper, August 2012
                              Wellington City Council
                              Submission
                            • Roles and Responsibilities
                            • Standards and Regulation
                              2011-11-07-13- 16-1707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
                                Westlake, Richard
                                Technical Report
                                Christchurch Recovery
                                2011-11-07-13- 16-1707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
                                  Westlake, Richard
                                  Technical Report
                                • Building assessments after earthquakes
                                • Christchurch Recovery
                                • Civil Defence
                                • Emergency Powers and Procedures
                                • Placarding (Stickering)
                                • Safety Evaluation
                                  2012-11-28-12- 06-1728 November 2012CTV Building hearing: Closing submissions of counsel for David CoatsworthCTV Building hearing: Closing submissions of counsel for David Coatsworth
                                    Weston, Tom
                                    Closing Statement
                                    Buildings - Representative Sample
                                    Madras 249
                                  2012-01-25-09- 57-0625 January 2012Hereford 194 hearing: Statement from James WhelanHereford 194 hearing: Statement from James Whelan
                                    Whelan, James
                                    Exhibit
                                    Buildings - Representative Sample
                                    Hereford 194
                                  2012-07-02-15- 01-0702 July 2012CTV Building hearing: Email from John Drew to Ibbotson Cooney Limited regarding insurance claims for windows and green stickering of the building, September 2010CTV Building hearing: Email from John Drew to Ibbotson Cooney Limited regarding insurance claims for windows and green stickering of the building, September 2010
                                    White Fox & Jones Lawyers
                                    Exhibit
                                    Buildings - Representative Sample
                                    Madras 249
                                  2012-09-04-16- 22-0404 September 2012Building Management after Eathquakes hearing: Collection of documents in relation to building demolition at 192 Madras StreetBuilding Management after Eathquakes hearing: Collection of documents in relation to building demolition at 192 Madras Street
                                    White Fox & Jones Lawyers
                                    Exhibit
                                    Building assessments after earthquakes
                                    Madras 192

                                  Search results navigation

                                  Displaying 1819 - 1838 of 1948 items arrow left First arrow left Prev arrow right Next arrow right Last