Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted ascending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-10-19-14- 52-3919 October 2011GNS Science - Likely Future Rates of Seismicity in Christchurch - Presentation to the Canterbury Earthquakes Royal Commission - Slide 7 - Where does Christchurch's Seismic Hazard Come from?GNS Science - Likely Future Rates of Seismicity in Christchurch - Presentation to the Canterbury Earthquakes Royal Commission - Slide 7 - Where does Christchurch's Seismic Hazard Come from?
    Webb, T H (Terry)
    Exhibit
    Seismicity
    2011-10-19-14- 45-3719 October 2011GNS Science - National Implications and Conclusions: Presentation to the Canterbury Earthquakes Royal Commission - Pages 1 - 6GNS Science - National Implications and Conclusions: Presentation to the Canterbury Earthquakes Royal Commission - Pages 1 - 6
      Webb, T H (Terry)
      Exhibit
      Seismicity
      2011-10-18-15- 24-1318 October 2011GNS Science -Active Tectonics and Earthquake Hazards Research Programme: Presentation to the Canterbury Earthquakes Royal CommissionGNS Science -Active Tectonics and Earthquake Hazards Research Programme: Presentation to the Canterbury Earthquakes Royal Commission
        Webb, T H (Terry)
        Exhibit
        Seismicity
        2011-10-18-13- 43-1918 October 2011GNS Science - The Canterbury Earthquake Sequence - Presentation to the Canterbury Earthquakes Royal CommissionGNS Science - The Canterbury Earthquake Sequence - Presentation to the Canterbury Earthquakes Royal Commission
          Webb, T H (Terry)
          Exhibit
          Seismicity
          2011-10-17-17- 30-3217 October 2011GNS Science - Webb Ancillary Slides: Presentation to the Canterbury Earthquakes Royal Commission - Slide 1 - Stress triggering in TurkeyGNS Science - Webb Ancillary Slides: Presentation to the Canterbury Earthquakes Royal Commission - Slide 1 - Stress triggering in Turkey
            Webb, T H (Terry)
            Exhibit
            Seismicity
            2011-10-21-13- 17-3521 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011
              Webb, T H (Terry)
              Technical Report
              Seismicity
              2011-12-06-10- 53-2106 December 20112011-10-17 Seismicity hearing transcript2011-10-17 Seismicity hearing transcript
                Webb, T H (Terry)
                Transcript
              • Geotechnical
              • Seismicity
                2012-03-12-12- 59-2412 March 20122011-10-18 Seismicity hearing transcript2011-10-18 Seismicity hearing transcript
                  Webb, T H (Terry)
                  Transcript
                • Geotechnical
                • Seismicity
                  2012-11-28-12- 10-0728 November 2012Update to GNS Science/University of Canterbury July 2011 Report entitled The Canterbury Earthquake Sequence and Implications for Seismic Design Levels, dated 2 April 2012Update to GNS Science/University of Canterbury July 2011 Report entitled The Canterbury Earthquake Sequence and Implications for Seismic Design Levels, dated 2 April 2012
                    Webb, T H (Terry)
                    Referenced Document
                    Seismicity
                    2012-11-28-12- 22-3228 November 2012Summary by Dr Terry Webb of recent seismic hazard modelling by GNS ScienceSummary by Dr Terry Webb of recent seismic hazard modelling by GNS Science
                      Webb, T H (Terry)
                      Referenced Document
                      Seismicity
                      2011-10-21-11- 33-0721 October 2011Z-factor Graph: Technical Report by GNS Science, October 2011Z-factor Graph: Technical Report by GNS Science, October 2011
                        Webb, T H (Terry)
                      • Exhibit
                      • Technical Report
                        Seismicity
                        2012-08-15-15- 52-5615 August 2012Building Management After Earthquakes: Submission from Auckland Council on the Royal Commission Discussion Paper, July 2012Building Management After Earthquakes: Submission from Auckland Council on the Royal Commission Discussion Paper, July 2012
                          Weight, Tim
                          Submission
                        • Building assessments after earthquakes
                        • Placarding (Stickering)
                        • Safety Evaluation
                          2011-11-04-16- 38-5004 November 2011Submission by Wellington City CouncilSubmission by Wellington City Council
                            Wellington City Council
                            Submission
                            Standards and Regulation
                            2011-11-14-17- 30-2514 November 2011Photos of Buildings in Wellington: Presentation by Wellington City Council, November 2011Photos of Buildings in Wellington: Presentation by Wellington City Council, November 2011
                              Wellington City Council
                              Exhibit
                            • Standards and Regulation
                            • Unreinforced Masonry Buildings (URM)
                              2012-08-22-12- 46-2222 August 2012Roles and Responsibilities: Submission from Wellington City Council on the Royal Commission Discussion Paper, August 2012Roles and Responsibilities: Submission from Wellington City Council on the Royal Commission Discussion Paper, August 2012
                                Wellington City Council
                                Submission
                              • Roles and Responsibilities
                              • Standards and Regulation
                                2011-11-07-13- 16-1707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
                                  Westlake, Richard
                                  Technical Report
                                  Christchurch Recovery
                                  2011-11-07-13- 16-1707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
                                    Westlake, Richard
                                    Technical Report
                                  • Building assessments after earthquakes
                                  • Christchurch Recovery
                                  • Civil Defence
                                  • Emergency Powers and Procedures
                                  • Placarding (Stickering)
                                  • Safety Evaluation
                                    2012-11-28-12- 06-1728 November 2012CTV Building hearing: Closing submissions of counsel for David CoatsworthCTV Building hearing: Closing submissions of counsel for David Coatsworth
                                      Weston, Tom
                                      Closing Statement
                                      Buildings - Representative Sample
                                      Madras 249
                                    2012-01-25-09- 57-0625 January 2012Hereford 194 hearing: Statement from James WhelanHereford 194 hearing: Statement from James Whelan
                                      Whelan, James
                                      Exhibit
                                      Buildings - Representative Sample
                                      Hereford 194
                                    2012-07-02-15- 01-0702 July 2012CTV Building hearing: Email from John Drew to Ibbotson Cooney Limited regarding insurance claims for windows and green stickering of the building, September 2010CTV Building hearing: Email from John Drew to Ibbotson Cooney Limited regarding insurance claims for windows and green stickering of the building, September 2010
                                      White Fox & Jones Lawyers
                                      Exhibit
                                      Buildings - Representative Sample
                                      Madras 249

                                    Search results navigation

                                    Displaying 1818 - 1837 of 1948 items arrow left First arrow left Prev arrow right Next arrow right Last