Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted ascending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-12-05-15- 08-4805 December 2011Preliminary Observations from Christchurch Earthquakes: Report by Structural Engineering Society of New Zealand, September 2011Preliminary Observations from Christchurch Earthquakes: Report by Structural Engineering Society of New Zealand, September 2011
    Structural Engineering Society of New Zealand
      Engineering
      2012-08-15-11- 56-5715 August 2012Training and Education of Engineers and Organisation of the Engineering Profession: Submission from the Structural Engineering Society of New Zealand (SESOC) on the Royal Commission Discussion Paper, July 2012Training and Education of Engineers and Organisation of the Engineering Profession: Submission from the Structural Engineering Society of New Zealand (SESOC) on the Royal Commission Discussion Paper, July 2012
        Structural Engineering Society of New Zealand
        Submission
      • Standards and Regulation
      • Training and Education
        2012-08-15-13- 09-3315 August 2012Building Management after Earthquakes: Submission by the Structural Engineering Society of New Zealand (SESOC) on the Royal Commission Discussion Paper, July 2012Building Management after Earthquakes: Submission by the Structural Engineering Society of New Zealand (SESOC) on the Royal Commission Discussion Paper, July 2012
          Structural Engineering Society of New Zealand
          Submission
        • Building assessments after earthquakes
        • Placarding (Stickering)
        • Safety Evaluation
          2011-12-05-15- 08-4805 December 2011Preliminary Observations from Christchurch Earthquakes: Report by Structural Engineering Society of New Zealand, September 2011Preliminary Observations from Christchurch Earthquakes: Report by Structural Engineering Society of New Zealand, September 2011
            Structural Engineering Society of New Zealand
              Engineering
              2012-08-22-12- 34-5122 August 2012Roles and Responsibilities: Submission from the Structural Engineering Society of New Zealand (SESOC) on the Royal Commission Discussion Paper, August 2012Roles and Responsibilities: Submission from the Structural Engineering Society of New Zealand (SESOC) on the Royal Commission Discussion Paper, August 2012
                Structural Engineering Society of New Zealand
                Submission
              • Roles and Responsibilities
              • Standards and Regulation
                2012-02-14-08- 13-2414 February 2012CTV Building Collapse Investigation reports prepared for the Department of Building and Housing CTV Building Collapse Investigation reports prepared for the Department of Building and Housing
                  Structure Smith Consulting Engineers
                  Technical Report
                • Building Failure
                • Buildings - Representative Sample
                  Madras 249
                2012-06-25-15- 39-0425 June 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012
                  Structure Smith Consulting Engineers
                • Exhibit
                • Technical Report
                  Buildings - Representative Sample
                  Madras 249
                2012-07-10-11- 45-2210 July 2012CTV Building hearing: CTV Building Collapse Investigation for CEBPTI Panel - draft report by Dr Clark Hyland and Ashley SmithCTV Building hearing: CTV Building Collapse Investigation for CEBPTI Panel - draft report by Dr Clark Hyland and Ashley Smith
                  Structure Smith Consulting Engineers
                  Exhibit
                  Buildings - Representative Sample
                  Madras 249
                2012-11-22-14- 26-5222 November 2012CTV Building hearing - CTV Building Collapse Investigation for the Department of Building and Housing: Appendix L Structural DrawingsCTV Building hearing - CTV Building Collapse Investigation for the Department of Building and Housing: Appendix L Structural Drawings
                  Structure Smith Consulting Engineers
                  Exhibit
                  Buildings - Representative Sample
                  Madras 249
                2012-07-10-12- 13-0710 July 2012CTV Building hearing: Non Linear Time Analysis Model of CTV BuildingCTV Building hearing: Non Linear Time Analysis Model of CTV Building
                  Structure Smith Consulting Engineers
                • Exhibit
                • Physical copy only
                  Buildings - Representative Sample
                  Madras 249
                2012-03-26-09- 14-1426 March 2012Response to SESOC Practice Note: Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Compusoft Engineering, March 2012Response to SESOC Practice Note: Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Compusoft Engineering, March 2012
                  Stuart, Tony
                  Submission
                  Standards and Regulation
                  2012-07-10-12- 03-3410 July 2012CTV Building hearing: Tables from CTV Non-Linear Seismic Analysis Report, by Compusoft Engineering Limited, showing diaphragm connection forces - LytteltonCTV Building hearing: Tables from CTV Non-Linear Seismic Analysis Report, by Compusoft Engineering Limited, showing diaphragm connection forces - Lyttelton
                    Stuart, Tony
                    Exhibit
                    Engineering
                    2012-07-26-12- 52-0826 July 2012CTV Building hearing: Joint report in relation to interpretation of second Compusoft NTHACTV Building hearing: Joint report in relation to interpretation of second Compusoft NTHA
                      Stuart, Tony
                      Exhibit
                      Buildings - Representative Sample
                      Madras 249
                    2012-07-26-11- 49-4726 July 2012CTV Building hearing: CTV Building Non-Linear Time History Analysis (NLTHA) Report: second draft issue prepared by Compusoft Engineering LimitedCTV Building hearing: CTV Building Non-Linear Time History Analysis (NLTHA) Report: second draft issue prepared by Compusoft Engineering Limited
                      Stuart, Tony
                      Exhibit
                      Buildings - Representative Sample
                      Madras 249
                    2012-07-24-16- 21-4924 July 2012CTV Building hearing: Non-Linear Seismic Analysis Report: Report by Derek Bradley and Tony Stuart of Compusoft Engineering, February 2012CTV Building hearing: Non-Linear Seismic Analysis Report: Report by Derek Bradley and Tony Stuart of Compusoft Engineering, February 2012
                      Stuart, Tony
                      Exhibit
                      Buildings - Representative Sample
                      Madras 249
                    2012-07-26-12- 11-0826 July 2012CTV Building hearing: Presentation by Compusoft on NLTH analyses to aid in the investigation into the collapse of the CTV BuildingCTV Building hearing: Presentation by Compusoft on NLTH analyses to aid in the investigation into the collapse of the CTV Building
                      Stuart, Tony
                      Exhibit
                      Buildings - Representative Sample
                      Madras 249
                    2012-07-26-12- 04-4126 July 2012CTV Building hearing: CTV Building Non-Linear Time History Analysis (NTHLA) Report: first draft issue prepared by Compusoft Engineering LimitedCTV Building hearing: CTV Building Non-Linear Time History Analysis (NTHLA) Report: first draft issue prepared by Compusoft Engineering Limited
                      Stuart, Tony
                      Exhibit
                      Buildings - Representative Sample
                      Madras 249
                    2012-01-31-13- 15-2831 January 2012Durham 309 hearing: Letter from R D Sullivan to Royal Commission regarding engineering informationDurham 309 hearing: Letter from R D Sullivan to Royal Commission regarding engineering information
                      Sullivan, R D
                      Exhibit
                      Buildings - Representative Sample
                      Durham 309
                    2012-06-28-11- 10-1028 June 2012CTV Building hearing: Statement of Evidence of Richard Daniel Sullivan CTV Building hearing: Statement of Evidence of Richard Daniel Sullivan
                      Sullivan, R D
                      Exhibit
                      Buildings - Representative Sample
                      Madras 249
                    2012-11-07-16- 42-5007 November 2012CTV Building hearing - CCC rapid assessment form and photographs of the CTV Building taken 5 September 2010CTV Building hearing - CCC rapid assessment form and photographs of the CTV Building taken 5 September 2010
                      Sullivan, R D
                      Exhibit
                    • Buildings - Representative Sample
                    • Engineering
                      Madras 249

                    Search results navigation

                    Displaying 1657 - 1676 of 1948 items arrow left First arrow left Prev arrow right Next arrow right Last