Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted descending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2012-07-26-11- 40-1426 July 2012CTV Building hearing: Order as to Directions in relation to Non-Linear Time History Analysis EvidenceCTV Building hearing: Order as to Directions in relation to Non-Linear Time History Analysis Evidence
    Cooper, Justice
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-26-13- 07-5226 July 2012CTV Building hearing: Order as to Directions in relation to Elastic Response Spectra Analysis EvidenceCTV Building hearing: Order as to Directions in relation to Elastic Response Spectra Analysis Evidence
    Cooper, Justice
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-03-12-12- 26-1312 March 2012Manchester 200-204 hearing: Statement of Amy Sarah CooneyManchester 200-204 hearing: Statement of Amy Sarah Cooney
    Cooney, Amy
    Exhibit
    Buildings - Representative Sample
    Manchester 200
2012-03-26-09- 08-4026 March 2012SESOC practice note "Design of Conventional Structural Systems following the Canterbury Earthquake": Submission by Dene Cook, March 2012SESOC practice note "Design of Conventional Structural Systems following the Canterbury Earthquake": Submission by Dene Cook, March 2012
    Cook, Dene
    Submission
    Standards and Regulation
    2012-03-26-09- 13-3326 March 2012Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Contech Specialist Contracting, March 2012Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Contech Specialist Contracting, March 2012
      Contech Specialist Contracting
      Submission
      Standards and Regulation
      2012-02-16-11- 35-1816 February 2012Submission by Construction Industry Council, December 2011Submission by Construction Industry Council, December 2011
        Construction Industry Council
        Submission
        Standards and Regulation
        2012-08-22-12- 32-0422 August 2012Roles and Responsibilities: Submission from the Construction Industry Council on the Royal Commission Discussion Paper, August 2012Roles and Responsibilities: Submission from the Construction Industry Council on the Royal Commission Discussion Paper, August 2012
          Construction Industry Council
          Submission
        • Roles and Responsibilities
        • Standards and Regulation
          2012-09-12-15- 38-2112 September 2012Roles and responsibilities hearing: Presentation from Pieter Burghout of the Construction Industry Council on Obtaining regulatory approval – capability & QARoles and responsibilities hearing: Presentation from Pieter Burghout of the Construction Industry Council on Obtaining regulatory approval – capability & QA
            Construction Industry Council
            Exhibit
          • Roles and Responsibilities
          • Standards and Regulation
            2012-09-11-16- 49-3611 September 2012Roles and responsibilities hearing: Presentation from Pieter Burghout of the Construction Industry Council on Building Regulatory Framework – Efficiency and ImprovementsRoles and responsibilities hearing: Presentation from Pieter Burghout of the Construction Industry Council on Building Regulatory Framework – Efficiency and Improvements
              Construction Industry Council
              Exhibit
            • Roles and Responsibilities
            • Standards and Regulation
              2012-03-26-09- 14-1426 March 2012Response to SESOC Practice Note: Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Compusoft Engineering, March 2012Response to SESOC Practice Note: Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Compusoft Engineering, March 2012
                Compusoft Engineering
                Submission
                Standards and Regulation
                2012-07-10-12- 03-3410 July 2012CTV Building hearing: Tables from CTV Non-Linear Seismic Analysis Report, by Compusoft Engineering Limited, showing diaphragm connection forces - LytteltonCTV Building hearing: Tables from CTV Non-Linear Seismic Analysis Report, by Compusoft Engineering Limited, showing diaphragm connection forces - Lyttelton
                  Compusoft Engineering
                  Exhibit
                  Engineering
                  2012-07-26-11- 49-4726 July 2012CTV Building hearing: CTV Building Non-Linear Time History Analysis (NLTHA) Report: second draft issue prepared by Compusoft Engineering LimitedCTV Building hearing: CTV Building Non-Linear Time History Analysis (NLTHA) Report: second draft issue prepared by Compusoft Engineering Limited
                    Compusoft Engineering
                    Exhibit
                    Buildings - Representative Sample
                    Madras 249
                  2012-07-24-16- 21-4924 July 2012CTV Building hearing: Non-Linear Seismic Analysis Report: Report by Derek Bradley and Tony Stuart of Compusoft Engineering, February 2012CTV Building hearing: Non-Linear Seismic Analysis Report: Report by Derek Bradley and Tony Stuart of Compusoft Engineering, February 2012
                    Compusoft Engineering
                    Exhibit
                    Buildings - Representative Sample
                    Madras 249
                  2012-07-26-12- 11-0826 July 2012CTV Building hearing: Presentation by Compusoft on NLTH analyses to aid in the investigation into the collapse of the CTV BuildingCTV Building hearing: Presentation by Compusoft on NLTH analyses to aid in the investigation into the collapse of the CTV Building
                    Compusoft Engineering
                    Exhibit
                    Buildings - Representative Sample
                    Madras 249
                  2012-08-14-14- 22-5214 August 2012CTV Building hearing: Calculations provided by Compusoft EngineeringCTV Building hearing: Calculations provided by Compusoft Engineering
                    Compusoft Engineering
                    Exhibit
                  • Buildings - Representative Sample
                  • Engineering
                    Madras 249
                  2012-07-26-12- 04-4126 July 2012CTV Building hearing: CTV Building Non-Linear Time History Analysis (NTHLA) Report: first draft issue prepared by Compusoft Engineering LimitedCTV Building hearing: CTV Building Non-Linear Time History Analysis (NTHLA) Report: first draft issue prepared by Compusoft Engineering Limited
                    Compusoft Engineering
                    Exhibit
                    Buildings - Representative Sample
                    Madras 249
                  2012-11-27-15- 52-3327 November 2012CTV Building: 1986 Code Compliance ETABS Analysis Report by Compusoft Engineering, August 2012CTV Building: 1986 Code Compliance ETABS Analysis Report by Compusoft Engineering, August 2012
                    Compusoft Engineering
                    Referenced Document
                  • Buildings - Representative Sample
                  • Engineering
                    Madras 249
                  2012-10-26-12- 20-4126 October 2012 Independent Earthquake Performance Assessment of Victoria Square Apartments - 100 Armagh Street: Prepared by Dr Nicholas Brooke of Compusoft Engineering, January 2012 Independent Earthquake Performance Assessment of Victoria Square Apartments - 100 Armagh Street: Prepared by Dr Nicholas Brooke of Compusoft Engineering, January 2012
                    Compusoft Engineering
                    Technical Report
                    Buildings - Representative Sample
                    Armagh 100
                  2012-10-24-12- 59-2024 October 2012Independent Earthquake Performance Assessment of Christchurch Central Police Station - 48 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, February 2012Independent Earthquake Performance Assessment of Christchurch Central Police Station - 48 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, February 2012
                    Compusoft Engineering
                    Technical Report
                    Buildings - Representative Sample
                    Hereford 48
                  2012-10-24-13- 29-0524 October 2012Independent Earthquake Performance Assessment of Christchurch Civic Building - 53 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, March 2012Independent Earthquake Performance Assessment of Christchurch Civic Building - 53 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, March 2012
                    Compusoft Engineering
                    Technical Report
                    Buildings - Representative Sample
                    Hereford 53

                  Search results navigation

                  Displaying 1450 - 1469 of 1948 items arrow left First arrow left Prev arrow right Next arrow right Last