Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted descending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2012-03-14-14- 51-4614 March 2012Presentation for the Royal Commission by the Shimizu Institute of Technology for the hearing on New Building TechnologiesPresentation for the Royal Commission by the Shimizu Institute of Technology for the hearing on New Building Technologies
    Fulton Hogan
    Exhibit
    New Building Technologies
    2012-03-12-13- 05-4612 March 2012Requirement for Future Buildings: Submission by Rod Fulford on behalf of Precast New Zealand Inc, December 2011Requirement for Future Buildings: Submission by Rod Fulford on behalf of Precast New Zealand Inc, December 2011
      Fulford, Rod
    • Exhibit
    • Submission
    • Engineering
    • New Building Technologies
      2012-03-12-13- 05-4612 March 2012Requirement for Future Buildings: Submission by Rod Fulford on behalf of Precast New Zealand Inc, December 2011Requirement for Future Buildings: Submission by Rod Fulford on behalf of Precast New Zealand Inc, December 2011
        Fulford, Rod
      • Exhibit
      • Submission
      • Engineering
      • New Building Technologies
        2012-06-27-12- 01-4727 June 2012CTV Building hearing: Brief of Evidence of Graham Edward FrostCTV Building hearing: Brief of Evidence of Graham Edward Frost
          Frost, Graham
          Exhibit
          Buildings - Representative Sample
          Madras 249
        2012-11-22-09- 44-4822 November 2012CTV Building hearing: Second Statement of Evidence of Graham Edward FrostCTV Building hearing: Second Statement of Evidence of Graham Edward Frost
          Frost, Graham
          Exhibit
          Buildings - Representative Sample
          Madras 249
        2012-07-10-12- 40-1510 July 2012CTV Building hearing: Graham Frost (USAR Support Engineer's) account to DBH about his observations and opinions in relation to the CTV collapseCTV Building hearing: Graham Frost (USAR Support Engineer's) account to DBH about his observations and opinions in relation to the CTV collapse
          Frost, Graham
          Exhibit
          Buildings - Representative Sample
          Madras 249
        2012-07-10-12- 25-4110 July 2012CTV Building hearing: Drawings provided by Graham Frost of interior beam/column joint and PC Beam Stress concept CTV Building hearing: Drawings provided by Graham Frost of interior beam/column joint and PC Beam Stress concept
          Frost, Graham
          Exhibit
          Buildings - Representative Sample
          Madras 249
        2012-03-01-11- 39-5101 March 2012Colombo 738 hearing: Brief of Evidence of Malcolm Thomas FreemanColombo 738 hearing: Brief of Evidence of Malcolm Thomas Freeman
          Freeman, Malcolm Thomas
          Exhibit
          Buildings - Representative Sample
          Colombo 738
        2012-08-22-11- 13-3422 August 2012Roles and Responsibilities: Submission from Ian Fraser on the Royal Commission Discussion Paper, August 2012Roles and Responsibilities: Submission from Ian Fraser on the Royal Commission Discussion Paper, August 2012
          Fraser, Ian
          Submission
        • Roles and Responsibilities
        • Standards and Regulation
          2012-06-26-12- 53-5326 June 2012CTV Building hearing: Statement of Evidence of Leonard FortuneCTV Building hearing: Statement of Evidence of Leonard Fortune
            Fortune, Leonard
            Exhibit
            Buildings - Representative Sample
            Madras 249
          2011-10-28-10- 47-3128 October 2011Submission by Rachael Ford and Ed Radley, September 2011Submission by Rachael Ford and Ed Radley, September 2011
            Ford, Rachael
            Submission
            Seismicity
            2012-03-12-12- 59-2412 March 20122011-10-18 Seismicity hearing transcript2011-10-18 Seismicity hearing transcript
              Ford, Rachael
              Transcript
            • Geotechnical
            • Seismicity
              2012-02-16-10- 29-5016 February 2012Colombo 382 hearing: Valuation of property - pre earthquake market indemnity valuation of building. Report prepared for IAG New Zealand LimitedColombo 382 hearing: Valuation of property - pre earthquake market indemnity valuation of building. Report prepared for IAG New Zealand Limited
                Fordbaker Valuation
                Exhibit
                Buildings - Representative Sample
              • Colombo 380
              • Colombo 382
              2012-06-28-16- 18-4828 June 2012CTV Building hearing: Statement of Evidence of David Lindsay FlewellenCTV Building hearing: Statement of Evidence of David Lindsay Flewellen
                Flewellen, David
                Exhibit
                Buildings - Representative Sample
                Madras 249
              2012-02-02-15- 02-3302 February 2012Colombo 603 and 605-613 hearing: Statement of Michael Fletcher regarding 605 Colombo StreetColombo 603 and 605-613 hearing: Statement of Michael Fletcher regarding 605 Colombo Street
                Fletcher, Mike
                Exhibit
                Buildings - Representative Sample
              • Colombo 603
              • Colombo 605
              • Colombo 615
              2012-02-02-15- 04-5702 February 2012Colombo 603 and 605-613 hearing: Letter from Royal Commission to M R Fletcher regarding request for information about 605 Colombo Street, response from M R Fletcher and supporting documentsColombo 603 and 605-613 hearing: Letter from Royal Commission to M R Fletcher regarding request for information about 605 Colombo Street, response from M R Fletcher and supporting documents
                Fletcher, Mike
                Exhibit
                Buildings - Representative Sample
                Colombo 605
              2012-08-15-15- 25-2315 August 2012Building Management After Earthquakes: Submission from Malcolm Flain on the Royal Commission Discussion Paper, December 2011Building Management After Earthquakes: Submission from Malcolm Flain on the Royal Commission Discussion Paper, December 2011
                Flain, Malcolm
                Submission
              • Building assessments after earthquakes
              • Placarding (Stickering)
              • Safety Evaluation
                2012-02-13-11- 42-3313 February 2012Submission by Malcolm Flain, October 2011Submission by Malcolm Flain, October 2011
                  Flain, Malcolm
                  Submission
                • Engineering
                • Geotechnical
                • Standards and Regulation
                  2012-11-27-16- 17-1827 November 2012Basic Techniques for Quick and Rapid Post-Earthquake Assessments of Building Safety, paper by F. Vidal, M. Feriche and A. OntiverosBasic Techniques for Quick and Rapid Post-Earthquake Assessments of Building Safety, paper by F. Vidal, M. Feriche and A. Ontiveros
                    Feriche, M
                    Referenced Document
                  • Building assessments after earthquakes
                  • Engineering
                  • Placarding (Stickering)
                  • Standards and Regulation
                    2012-01-17-16- 01-5417 January 2012Hotel Grand Chancellor hearing: Document prepared for the hearing by Commissioner Richard FenwickHotel Grand Chancellor hearing: Document prepared for the hearing by Commissioner Richard Fenwick
                      Fenwick, Richard
                      Exhibit
                      Buildings - Representative Sample
                      Cashel 161

                    Search results navigation

                    Displaying 1254 - 1273 of 1948 items arrow left First arrow left Prev arrow right Next arrow right Last