Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Sorted ascending Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-10-18-17- 26-3918 October 2011GNS Science -The steps of Probabilistic Seismic Hazard: Presentation to the Canterbury Earthquakes Royal Commission, October 2011GNS Science -The steps of Probabilistic Seismic Hazard: Presentation to the Canterbury Earthquakes Royal Commission, October 2011
  • GNS Science
  • Pettinga, Jarg
    Exhibit
    Seismicity
    2012-11-27-15- 43-4027 November 2012Greater Christchurch Recovery Update, Issue 14Greater Christchurch Recovery Update, Issue 14
      Canterbury Earthquake Recovery Authority (CERA)
      Referenced Document
      Christchurch Recovery
      2012-02-10-15- 12-2410 February 2012Ground Motion and Seismicity Aspects of 4 September 2010 Darfield and 22 February 2011 Christchurch Earthquakes: Technical report by Brendon Bradley of Bradley Seismic Ltd, January 2012Ground Motion and Seismicity Aspects of 4 September 2010 Darfield and 22 February 2011 Christchurch Earthquakes: Technical report by Brendon Bradley of Bradley Seismic Ltd, January 2012
      • Bradley Seismic Ltd
      • Bradley, Brendon
        Technical Report
        Seismicity
        2012-11-27-16- 25-3427 November 2012Guidance for Engineers Assessing the Seismic Performance of Non-residential and Multi-unit Residential Buildings in Greater Christchurch, by the former Department of Building and HousingGuidance for Engineers Assessing the Seismic Performance of Non-residential and Multi-unit Residential Buildings in Greater Christchurch, by the former Department of Building and Housing
          Department of Building and Housing
          Referenced Document
        • Building assessments after earthquakes
        • Engineering
          2011-12-05-15- 04-2205 December 2011Guidance on detailed engineering evaluation of earthquake affected non-residential buildings in Canterbury - Part 2: Evaluation procedure (revision 5Guidance on detailed engineering evaluation of earthquake affected non-residential buildings in Canterbury - Part 2: Evaluation procedure (revision 5
            Engineering Advisory Group
            Exhibit
          • Engineering
          • Standards and Regulation
            2012-11-27-16- 04-2027 November 2012Guide to the National Civil Defence and Emergency Management PlanGuide to the National Civil Defence and Emergency Management Plan
              Ministry of Civil Defence & Emergency Management
              Referenced Document
              Emergency Powers and Procedures
              2012-03-06-14- 03-1906 March 2012Hearing Srecko (Alec) Cvetanov Submission: Submission of Counsel Assisting in opposition to application to extend jurisdictionHearing Srecko (Alec) Cvetanov Submission: Submission of Counsel Assisting in opposition to application to extend jurisdiction
              • Canterbury Earthquakes Royal Commission
              • Mills, Stephen
                  Cvetanov Hearing
                  Madras 249
                2011-11-09-16- 02-2809 November 2011Hearings on Earthquake-prone Buildings: Presentation (Submission) by David Hopkins, November 2011Hearings on Earthquake-prone Buildings: Presentation (Submission) by David Hopkins, November 2011
                  Hopkins, David
                  Exhibit
                  Unreinforced Masonry Buildings (URM)
                  2012-01-25-10- 16-2725 January 2012Hereford 194 hearing: Letter from Royal Commission to Peter Mitchell regarding request for informationHereford 194 hearing: Letter from Royal Commission to Peter Mitchell regarding request for information
                    Canterbury Earthquakes Royal Commission
                    Exhibit
                    Buildings - Representative Sample
                    Hereford 194
                  2012-01-25-09- 52-4825 January 2012Hereford 194 hearing: Chronology of documentsHereford 194 hearing: Chronology of documents
                  • Canterbury Earthquakes Royal Commission
                  • Zarifeh, Mark
                    Opening Statement
                    Buildings - Representative Sample
                    Hereford 194
                  2012-01-25-09- 53-5725 January 2012Hereford 194 hearing: Documents in ChronologyHereford 194 hearing: Documents in Chronology
                  • Canterbury Earthquakes Royal Commission
                  • Zarifeh, Mark
                    Opening Statement
                    Buildings - Representative Sample
                    Hereford 194
                  2012-01-25-15- 08-3525 January 2012Hereford 194 hearing: Independent Assessment on Earthquake Performance of 194 Hereford Street: Report by Peter Smith and Jonathan Devine of Spencer Holmes LtdHereford 194 hearing: Independent Assessment on Earthquake Performance of 194 Hereford Street: Report by Peter Smith and Jonathan Devine of Spencer Holmes Ltd
                  • Devine, Jonathan
                  • Smith, Peter
                  • Spencer Holmes Ltd
                    Exhibit
                    Buildings - Representative Sample
                    Hereford 194
                  2012-01-25-10- 16-0325 January 2012Hereford 194 hearing: Letter from Chris Gilbert to Royal Commission regarding request for additional Information about 194 Hereford StreetHereford 194 hearing: Letter from Chris Gilbert to Royal Commission regarding request for additional Information about 194 Hereford Street
                  • Christchurch City Council
                  • Gilbert, Chris
                    Exhibit
                    Buildings - Representative Sample
                    Hereford 194
                  2012-01-25-11- 24-2525 January 2012Hereford 194 hearing: Producer statement - PS1 designHereford 194 hearing: Producer statement - PS1 design
                    Christchurch City Council
                    Exhibit
                    Buildings - Representative Sample
                    Hereford 194
                  2012-01-25-09- 57-0625 January 2012Hereford 194 hearing: Statement from James WhelanHereford 194 hearing: Statement from James Whelan
                    Whelan, James
                    Exhibit
                    Buildings - Representative Sample
                    Hereford 194
                  2012-01-25-15- 18-4225 January 2012Hereford 194 hearing: Statement of Christine WatsonHereford 194 hearing: Statement of Christine Watson
                    Watson, Christine
                      Buildings - Representative Sample
                      Hereford 194
                    2012-01-25-14- 57-0525 January 2012Hereford 194 hearing: Statement of Evidence of Rhys Collin SmithHereford 194 hearing: Statement of Evidence of Rhys Collin Smith
                      Smith, Rhys
                      Exhibit
                      Buildings - Representative Sample
                      Hereford 194
                    2012-01-25-10- 15-5125 January 2012Hereford 194 hearing: Statement of Evidence of Stephen James McCarthyHereford 194 hearing: Statement of Evidence of Stephen James McCarthy
                    • Christchurch City Council
                    • McCarthy, Steve
                      Exhibit
                      Buildings - Representative Sample
                      Hereford 194
                    2012-03-12-13- 04-0112 March 2012Hereford 194 hearing: Statement of John Stuart O'Loughlin and supporting documentsHereford 194 hearing: Statement of John Stuart O'Loughlin and supporting documents
                    • O'Loughlin Taylor Spence Ltd
                    • O'Loughlin, John
                      Exhibit
                      Buildings - Representative Sample
                      Hereford 194
                    2012-01-25-12- 22-2725 January 2012Hereford 194 hearing: Statement of Phil WilbyHereford 194 hearing: Statement of Phil Wilby
                      Wilby, Phil
                      Exhibit
                      Buildings - Representative Sample
                      Hereford 194

                    Search results navigation

                    Displaying 918 - 937 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last