Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted ascending Subject(s) Not sorted Building(s) Not sorted Action
2012-09-10-14- 14-2410 September 2012Training and education of engineers and organisation of the engineering profession hearing: Opening address from Counsel Assisting the Royal Commission, Mark ZarifehTraining and education of engineers and organisation of the engineering profession hearing: Opening address from Counsel Assisting the Royal Commission, Mark Zarifeh
  • Canterbury Earthquakes Royal Commission
  • Zarifeh, Mark
    Opening Statement
    Training and Education
    2012-01-25-09- 52-4825 January 2012Hereford 194 hearing: Chronology of documentsHereford 194 hearing: Chronology of documents
    • Canterbury Earthquakes Royal Commission
    • Zarifeh, Mark
      Opening Statement
      Buildings - Representative Sample
      Hereford 194
    2012-01-30-10- 02-3330 January 2012Cathedral Square 32 hearing: Chronology of DocumentsCathedral Square 32 hearing: Chronology of Documents
      Zarifeh, Mark
      Opening Statement
      Buildings - Representative Sample
      Cathedral 32
    2012-11-30-14- 20-5030 November 2012CTV Building hearing: CTV interactive simulation model created for the Royal Commission by Truescape Consulting & Visual Facilitation CTV Building hearing: CTV interactive simulation model created for the Royal Commission by Truescape Consulting & Visual Facilitation
      Truescape
      Physical copy only
      Buildings - Representative Sample
      Madras 249
    2012-09-13-10- 00-2113 September 2012IPENZ Code of Ethics IPENZ Code of Ethics
      Institution of Professional Engineers New Zealand (IPENZ)
      Post hearing submission
    • Engineering
    • Training and Education
      2012-09-13-10- 00-4913 September 2012IPENZ practice notes issued 2003 and 2007IPENZ practice notes issued 2003 and 2007
        Institution of Professional Engineers New Zealand (IPENZ)
        Post hearing submission
      • Engineering
      • Training and Education
        2012-09-13-10- 06-4013 September 2012IPENZ engineering ethics webinar slidesIPENZ engineering ethics webinar slides
          Institution of Professional Engineers New Zealand (IPENZ)
          Post hearing submission
        • Engineering
        • Training and Education
          2012-09-13-09- 59-2813 September 2012Table of actions initiated by IPENZ following the 2003 Structural TaskforceTable of actions initiated by IPENZ following the 2003 Structural Taskforce
            Institution of Professional Engineers New Zealand (IPENZ)
            Post hearing submission
          • Engineering
          • Training and Education
            2012-09-13-11- 21-1913 September 2012National Building Consent Authority Competency Assessment System: Department of Building and Housing guidance documentNational Building Consent Authority Competency Assessment System: Department of Building and Housing guidance document
              Department of Building and Housing
              Post hearing submission
              Roles and Responsibilities
              2012-09-13-11- 00-3413 September 2012 IPENZ collection of published articles IPENZ collection of published articles
                Institution of Professional Engineers New Zealand (IPENZ)
                Post hearing submission
              • Engineering
              • Training and Education
                2012-09-06-16- 40-1906 September 2012CTV Building hearing: Photographs of building interior taken on levels 2-5 by Leonard Pagan, Quantity Surveyor for Rawlinsons, as part of a building inspection on 29 September 2010CTV Building hearing: Photographs of building interior taken on levels 2-5 by Leonard Pagan, Quantity Surveyor for Rawlinsons, as part of a building inspection on 29 September 2010
                • Pagan, Leonard
                • Rawlinsons Ltd
                  Referenced Document
                  Buildings - Representative Sample
                  Madras 249
                2012-11-27-16- 50-1827 November 2012Letter from GNS Science to Christchurch City Council regarding a student report concerning effects of liquefactionLetter from GNS Science to Christchurch City Council regarding a student report concerning effects of liquefaction
                  GNS Science
                  Referenced Document
                  Geotechnical
                  2012-11-27-17- 03-1527 November 2012Estimated Damage and Casualties from Earthquakes Affecting Christchurch, report by GNS Estimated Damage and Casualties from Earthquakes Affecting Christchurch, report by GNS
                    GNS Science
                    Referenced Document
                    Seismicity
                    2012-11-27-15- 56-5527 November 2012CTV Building: Email from Willie Palmer of Buddle Findlay, counsel for Alan Reay, to Royal Commission, dated 15 June 2012CTV Building: Email from Willie Palmer of Buddle Findlay, counsel for Alan Reay, to Royal Commission, dated 15 June 2012
                    • Buddle Findlay
                    • Palmer, Willie
                      Referenced Document
                      Buildings - Representative Sample
                      Madras 249
                    2012-11-27-16- 00-3227 November 2012Notices of Motion, 21 October 1985, Christchurch City CouncilNotices of Motion, 21 October 1985, Christchurch City Council
                      Christchurch City Council
                      Referenced Document
                      Standards and Regulation
                      2012-11-27-15- 43-4027 November 2012Greater Christchurch Recovery Update, Issue 14Greater Christchurch Recovery Update, Issue 14
                        Canterbury Earthquake Recovery Authority (CERA)
                        Referenced Document
                        Christchurch Recovery
                        2012-11-27-16- 09-3227 November 2012New Zealand Society for Earthquake Engineering, Assessment and Improvement of the Structural Performance of Buildings in Earthquakes: Including Corregendum No.1New Zealand Society for Earthquake Engineering, Assessment and Improvement of the Structural Performance of Buildings in Earthquakes: Including Corregendum No.1
                          New Zealand Society for Earthquake Engineering
                          Referenced Document
                        • Engineering
                        • Standards and Regulation
                        • Structural Performance
                          2012-09-06-16- 17-4406 September 2012CTV Building hearing: Schedule – Summary of ARCE time records for Job 2503. CTV Building hearing: Schedule – Summary of ARCE time records for Job 2503.
                          • Buddle Findlay
                          • Reay, Alan
                            Referenced Document
                            Buildings - Representative Sample
                            Madras 249
                          2012-09-06-16- 25-4406 September 2012CTV Building hearing: Structural detail drawings by Michael BrooksCTV Building hearing: Structural detail drawings by Michael Brooks
                            Brooks, Michael
                            Referenced Document
                            Engineering
                            Madras 249
                          2012-11-27-16- 15-1427 November 2012Post-Earthquake Building Safety Evaluation Procedures - Preparedness Checklist and Response plan for Territorial Authorities, by New Zealand Society for Earthquake Engineering, January 1998Post-Earthquake Building Safety Evaluation Procedures - Preparedness Checklist and Response plan for Territorial Authorities, by New Zealand Society for Earthquake Engineering, January 1998
                            New Zealand Society for Earthquake Engineering
                            Referenced Document
                          • Building assessments after earthquakes
                          • Engineering
                          • Placarding (Stickering)
                          • Safety Evaluation
                          • Standards and Regulation

                            Search results navigation

                            Displaying 895 - 914 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last