Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Sorted descending Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2012-07-10-15- 52-2110 July 2012CTV Building hearing: Expert Panel Report on the CTV Building Collapse - Presentation by panel member Rob Jury on behalf of the panelCTV Building hearing: Expert Panel Report on the CTV Building Collapse - Presentation by panel member Rob Jury on behalf of the panel
  • Department of Building and Housing
  • Jury, Rob
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-31-15- 21-3131 July 2012CTV Building hearing: ETABS output for Westpark TowerCTV Building hearing: ETABS output for Westpark Tower
    Harding, David
    Exhibit
    Buildings - Representative Sample
  • Cashel 56
  • Madras 249
2012-11-23-12- 11-5723 November 2012CTV Building hearing: Engineering Calculations by Alan Reay, Consulting Engineer, dated 26 June 1986CTV Building hearing: Engineering Calculations by Alan Reay, Consulting Engineer, dated 26 June 1986
    Reay, Alan
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-02-14- 57-5802 July 2012CTV Building hearing: Email response from John Drew to a request for information from the Royal Commission, March 2012 CTV Building hearing: Email response from John Drew to a request for information from the Royal Commission, March 2012
    Drew, John Maxwell
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-02-15- 00-0402 July 2012CTV Building hearing: Email reply from John Drew to the Royal Commission's request for information, June 2012CTV Building hearing: Email reply from John Drew to the Royal Commission's request for information, June 2012
    Drew, John Maxwell
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-02-14- 59-0402 July 2012CTV Building hearing: Email from the Royal Commission to John Drew with request to clarify information previously supplied, May 2012CTV Building hearing: Email from the Royal Commission to John Drew with request to clarify information previously supplied, May 2012
    Drew, John Maxwell
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-10-11- 48-3910 July 2012CTV Building hearing: Email from Rob Jury to Clark Hyland regarding CTV Analyses and Collapse ScenariosCTV Building hearing: Email from Rob Jury to Clark Hyland regarding CTV Analyses and Collapse Scenarios
    Jury, Rob
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-02-16- 51-0902 July 2012CTV Building hearing: Email from Peter Higgins to John Drew regarding attached budget estimates for CTV House epoxy injection repairsCTV Building hearing: Email from Peter Higgins to John Drew regarding attached budget estimates for CTV House epoxy injection repairs
  • Drew, John Maxwell
  • Higgins, Peter
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-06-28-12- 52-0728 June 2012CTV Building hearing: Email from Murray Wood to CTV staff, 7 September 2010CTV Building hearing: Email from Murray Wood to CTV staff, 7 September 2010
    Wood, Murray
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-02-15- 01-0702 July 2012CTV Building hearing: Email from John Drew to Ibbotson Cooney Limited regarding insurance claims for windows and green stickering of the building, September 2010CTV Building hearing: Email from John Drew to Ibbotson Cooney Limited regarding insurance claims for windows and green stickering of the building, September 2010
  • Drew, John Maxwell
  • Ibbotson Cooney Ltd
  • Wearing, Simon
  • White Fox & Jones Lawyers
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-10-15- 32-1610 July 2012CTV Building hearing: Email from David Hopkins to Clark Hyland, Ashley Smith, and Sherwyn Williams regarding Comments on ARCL ResponsesCTV Building hearing: Email from David Hopkins to Clark Hyland, Ashley Smith, and Sherwyn Williams regarding Comments on ARCL Responses
    Various
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-10-12- 13-4410 July 2012CTV Building hearing: Email from David Hopkins to Ashley Smith and Clark Hyland regarding Variation of Opinion List for CTV Report 120123 CTV Building hearing: Email from David Hopkins to Ashley Smith and Clark Hyland regarding Variation of Opinion List for CTV Report 120123
    Hopkins, David
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-10-11- 48-5110 July 2012CTV Building hearing: Email from Clark Hyland to Rob Jury and Nigel Priestley regarding CTV Analyses and Collapse ScenariosCTV Building hearing: Email from Clark Hyland to Rob Jury and Nigel Priestley regarding CTV Analyses and Collapse Scenarios
    Hyland, Clark
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-11-26-15- 40-5326 November 2012CTV Building hearing: Email exchange between the Royal Commission and Richard Raymond with a query regarding shear wallsCTV Building hearing: Email exchange between the Royal Commission and Richard Raymond with a query regarding shear walls
  • Raymond, Richard
  • Wilkie, A T
  • Zarifeh, Mark
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-02-14- 56-4302 July 2012CTV Building hearing: Email exchange between the Royal Commission and John Drew, tenant and building manager of the CTV building, regarding the CPG Earthquake Damage ReportCTV Building hearing: Email exchange between the Royal Commission and John Drew, tenant and building manager of the CTV building, regarding the CPG Earthquake Damage Report
  • Canterbury Earthquakes Royal Commission
  • Drew, John Maxwell
  • Zarifeh, Mark
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-10-12- 14-0910 July 2012CTV Building hearing: Email between David Hopkins, Mike Stannard, and Sherwyn Williams regarding Clark and Ashley's reportsCTV Building hearing: Email between David Hopkins, Mike Stannard, and Sherwyn Williams regarding Clark and Ashley's reports
    Various
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-10-15- 54-1810 July 2012CTV Building hearing: Email between Ashley Smith and Nigel Priestley regarding analysis of factors contributing to the collapseCTV Building hearing: Email between Ashley Smith and Nigel Priestley regarding analysis of factors contributing to the collapse
    Various
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-06-25-16- 53-4525 June 2012CTV Building hearing: Earthquake Damage Report prepared for Madras Equities Ltd by David Coatsworth of CPG New Zealand Ltd, October 2010CTV Building hearing: Earthquake Damage Report prepared for Madras Equities Ltd by David Coatsworth of CPG New Zealand Ltd, October 2010
  • Coatsworth, D
  • CPG New Zealand Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-08-17-17- 53-5717 August 2012CTV Building hearing: Dynamic Risk Assessment process flowchart from the New Zealand Fire Service Operations and Training DepartmentCTV Building hearing: Dynamic Risk Assessment process flowchart from the New Zealand Fire Service Operations and Training Department
    New Zealand Fire Service
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-10-12- 25-4110 July 2012CTV Building hearing: Drawings provided by Graham Frost of interior beam/column joint and PC Beam Stress concept CTV Building hearing: Drawings provided by Graham Frost of interior beam/column joint and PC Beam Stress concept
    Frost, Graham
    Exhibit
    Buildings - Representative Sample
    Madras 249

Search results navigation

Displaying 768 - 787 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last