Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published Sorted ascending Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2012-03-12-12- 23-2512 March 20122011-10-25 Soils and Ground Conditions hearing transcript2011-10-25 Soils and Ground Conditions hearing transcript
  • Bray, Jonathan D
  • Cubrinovski, Misko
  • McCahon, Ian
  • McManus, Kevin James
    Transcript
    Geotechnical
    2012-03-12-12- 26-1312 March 2012Manchester 200-204 hearing: Statement of Amy Sarah CooneyManchester 200-204 hearing: Statement of Amy Sarah Cooney
      Cooney, Amy
      Exhibit
      Buildings - Representative Sample
      Manchester 200
    2012-03-12-12- 34-3312 March 2012Worcester 391 hearing: Documents pertaining to Tim Gwatkin, TM Consultants, structural engineerWorcester 391 hearing: Documents pertaining to Tim Gwatkin, TM Consultants, structural engineer
      Gwatkin, Tim
      Exhibit
      Buildings - Representative Sample
    • Worcester 389
    • Worcester 391
    2012-03-12-12- 36-4412 March 2012Manchester 265-271 (Gloucester 173) hearing: Brief of Evidence of Graeme Roy HamiltonManchester 265-271 (Gloucester 173) hearing: Brief of Evidence of Graeme Roy Hamilton
      Hamilton, G R
      Exhibit
      Buildings - Representative Sample
      Manchester 265-271
    2012-03-12-12- 38-0412 March 2012Manchester 265-271 (Gloucester 173) hearing: Letter from Graeme Hamilton to Royal Commission regarding request for informationManchester 265-271 (Gloucester 173) hearing: Letter from Graeme Hamilton to Royal Commission regarding request for information
      Hamilton, G R
      Exhibit
      Buildings - Representative Sample
      Manchester 265-271
    2012-03-12-12- 39-1612 March 2012Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011
    • Holmes, William T
    • Rutherford & Chekene
    • Exhibit
    • Technical Report
    • Building Failure
    • Buildings - Representative Sample
    • Central Business District (CBD)
    • Cambridge 233
    • Cashel 161
    • Colombo 764
    2012-03-12-12- 39-5512 March 2012Review of Expert Panel Report Chapter 4 - Context: Presentation by William T. HolmesReview of Expert Panel Report Chapter 4 - Context: Presentation by William T. Holmes
      Holmes, William T
      Exhibit
    • Buildings - Representative Sample
    • Engineering
      Cambridge 233
    2012-03-12-12- 42-3112 March 2012William T Holmes, Rutherford & Chekene Senior ConsultantWilliam T Holmes, Rutherford & Chekene Senior Consultant
      Holmes, William T
      Speaker Profile
    • Buildings - Representative Sample
    • Profile
      Cambridge 233
    2012-03-12-12- 44-4412 March 20122011-12-06 PGC Building hearing transcript2011-12-06 PGC Building hearing transcript
    • Holmes, William T
    • Jury, Rob
    • Priestley, Nigel
    • Sharpe, Richard
      Transcript
      Buildings - Representative Sample
      Cambridge 233
    2012-03-12-12- 46-2512 March 2012Review of expert panel and Beca report on PGC building: Presentation by William T HolmesReview of expert panel and Beca report on PGC building: Presentation by William T Holmes
      Holmes, William T
      Exhibit
      Buildings - Representative Sample
      Cambridge 233
    2012-03-12-12- 49-3812 March 2012Hotel Grand Chancellor hearing: Dunning Thornton Consultants Ltd report on the structural performance of the Hotel Grand Chancellor - Peer review for the Commission by William T HolmesHotel Grand Chancellor hearing: Dunning Thornton Consultants Ltd report on the structural performance of the Hotel Grand Chancellor - Peer review for the Commission by William T Holmes
      Holmes, William T
      Exhibit
      Buildings - Representative Sample
      Cashel 161
    2012-03-12-12- 53-1512 March 2012Unreinforced masonry and other earthquake-prone buildings - requirements for seismic strengthening: submission by Department of Building and Housing, October 2011Unreinforced masonry and other earthquake-prone buildings - requirements for seismic strengthening: submission by Department of Building and Housing, October 2011
      Kelly, David
      Submission
    • Seismic Strengthening
    • Standards and Regulation
    • Unreinforced Masonry Buildings (URM)
      2012-03-12-12- 55-1612 March 2012Canterbury earthquakes sequence and implications for seismic design levels: submission by Department of Building and Housing, September 2011Canterbury earthquakes sequence and implications for seismic design levels: submission by Department of Building and Housing, September 2011
      • Department of Building and Housing
      • Kelly, David
        Submission
        Seismicity
        2012-03-12-12- 56-2612 March 20122011-11-15 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript2011-11-15 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript
          Various
          Transcript
          Unreinforced Masonry Buildings (URM)
          2012-03-12-12- 57-2512 March 2012New Building Technologies: Submission by the Department of Building and Housing, December 2011New Building Technologies: Submission by the Department of Building and Housing, December 2011
          • Department of Building and Housing
          • Kelly, David
            Submission
          • Engineering
          • New Building Technologies
            2012-03-12-12- 58-0912 March 2012Soils Submission from Kevin McManus - Foundation design reliability issuesSoils Submission from Kevin McManus - Foundation design reliability issues
              McManus, Kevin James
              Submission
              Geotechnical
              2012-03-12-12- 59-2412 March 20122011-10-18 Seismicity hearing transcript2011-10-18 Seismicity hearing transcript
              • Ford, Rachael
              • McVerry, Graeme
              • Pettinga, Jarg
              • Webb, T H (Terry)
                Transcript
              • Geotechnical
              • Seismicity
                2012-03-12-12- 59-5912 March 20122011-10-19 Seismicity hearing transcript2011-10-19 Seismicity hearing transcript
                • Abrahamson, Norman
                • Berryman, K
                • McVerry, Graeme
                  Transcript
                • Geotechnical
                • Seismicity
                  2012-03-12-13- 01-0112 March 2012GNS Science - Implications for structural design motions - February Spectra and NZS1170 design levels - four Geonet sites closest to CBD: Presentation to the Canterbury Earthquakes Royal Commission, October 2011GNS Science - Implications for structural design motions - February Spectra and NZS1170 design levels - four Geonet sites closest to CBD: Presentation to the Canterbury Earthquakes Royal Commission, October 2011
                  • GNS Science
                  • McVerry, Graeme
                    Exhibit
                    Seismicity
                    2012-03-12-13- 01-3912 March 2012Implications for structural design motions - Presentation to the Canterbury Earthquakes Royal Commission, October 2011Implications for structural design motions - Presentation to the Canterbury Earthquakes Royal Commission, October 2011
                    • GNS Science
                    • McVerry, Graeme
                      Exhibit
                      Seismicity

                      Search results navigation

                      Displaying 614 - 633 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last