Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Sorted ascending Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-11-02-12- 48-1102 November 2011Structural and Geotechnical Engineering Education: Submission by Faculty of Engineering, University of Auckland, August 2011Structural and Geotechnical Engineering Education: Submission by Faculty of Engineering, University of Auckland, August 2011
  • Davies, Michael C R
  • Pender, Michael
  • Quenneville, Pierre
  • Submission
  • Technical Report
    Training and Education
    2012-12-05-23- 21-5005 December 2012Structural Damage Report on the Novotel Hotel, 52 Cathedral Square dated 23 August 2011Structural Damage Report on the Novotel Hotel, 52 Cathedral Square dated 23 August 2011
      Lewis Bradford Consulting Engineers
        Buildings - Representative Sample
        2011-10-19-17- 06-5619 October 2011Structural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard SpectraStructural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard Spectra
          Standards New Zealand
          Exhibit
          Standards and Regulation
          2011-10-18-17- 30-4818 October 2011Structural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard SpectraStructural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard Spectra
            Standards New Zealand
            Exhibit
            Standards and Regulation
            2011-10-18-17- 34-4718 October 2011Structural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard SpectraStructural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard Spectra
              Standards New Zealand
              Exhibit
              Standards and Regulation
              2012-02-28-16- 23-5828 February 2012Structural Design for Earthquake Resistance - Past, Present and Future of Seismic Design: Technical Report by Associate Professor Rajesh P Dhakal, August 2011Structural Design for Earthquake Resistance - Past, Present and Future of Seismic Design: Technical Report by Associate Professor Rajesh P Dhakal, August 2011
                Dhakal, Rajesh P
                Technical Report
              • Engineering
              • New Building Technologies
                2011-10-27-17- 26-5327 October 2011Submission by Adam William Thornton, October 2011Submission by Adam William Thornton, October 2011
                  Thornton, Adam William
                  Submission
                • Engineering
                • Unreinforced Masonry Buildings (URM)
                  2011-10-27-17- 12-0127 October 2011Submission by Auckland Council, October 2011Submission by Auckland Council, October 2011
                  • Auckland Council
                  • Reade, Patricia
                    Submission
                  • Building assessments after earthquakes
                  • Placarding (Stickering)
                  • Safety Evaluation
                  • Seismic Strengthening
                  • Standards and Regulation
                  • Unreinforced Masonry Buildings (URM)
                    2012-02-16-16- 29-1716 February 2012Submission by Bruce Moon in relation to 382 Colombo StreetSubmission by Bruce Moon in relation to 382 Colombo Street
                      Moon, Bruce
                      Submission
                      Buildings - Representative Sample
                    • Colombo 380
                    • Colombo 382
                    2012-01-30-11- 37-4330 January 2012Submission by Cement & Concrete Association of New Zealand regarding new technologies, December 2011Submission by Cement & Concrete Association of New Zealand regarding new technologies, December 2011
                      Cement & Concrete Association of New Zealand (CCANZ)
                      Submission
                    • Engineering
                    • New Building Technologies
                      2012-02-13-11- 44-5913 February 2012Submission by Christchurch City Council regarding response to Enfocus reportSubmission by Christchurch City Council regarding response to Enfocus report
                        Christchurch City Council
                        Submission
                      • Building Failure
                      • Safety Evaluation
                        2011-10-28-13- 47-5428 October 2011Submission by Christchurch City Council, October 2011Submission by Christchurch City Council, October 2011
                        • Christchurch City Council
                        • Mitchell, Peter
                          Submission
                        • Standards and Regulation
                        • Unreinforced Masonry Buildings (URM)
                          2011-11-10-08- 44-1410 November 2011Submission by Civil Defence Emergency Management Group (CDEMG)/ Auckland Council, October 2011Submission by Civil Defence Emergency Management Group (CDEMG)/ Auckland Council, October 2011
                            Auckland Council
                            Submission
                            Seismicity
                            2012-02-16-11- 35-1816 February 2012Submission by Construction Industry Council, December 2011Submission by Construction Industry Council, December 2011
                              Construction Industry Council
                              Submission
                              Standards and Regulation
                              2012-02-16-15- 46-2616 February 2012Submission by Environment Canterbury Regional Council regarding response to Enfocus report, February 2012Submission by Environment Canterbury Regional Council regarding response to Enfocus report, February 2012
                                Environment Canterbury Regional Council
                                Submission
                              • Building Failure
                              • Safety Evaluation
                                2012-02-16-15- 01-4116 February 2012Submission by Institution of Professional Engineers New Zealand (IPENZ), 9 December 2011Submission by Institution of Professional Engineers New Zealand (IPENZ), 9 December 2011
                                  Institution of Professional Engineers New Zealand (IPENZ)
                                  Submission
                                • Standards and Regulation
                                • Training and Education
                                  2011-10-27-16- 54-3727 October 2011Submission by International Council on Monuments and Sites ( ICOMOS) New Zealand, October 2011Submission by International Council on Monuments and Sites ( ICOMOS) New Zealand, October 2011
                                    Jones, Kevin
                                    Submission
                                  • Culture and Heritage
                                  • Unreinforced Masonry Buildings (URM)
                                    2011-12-01-13- 25-0101 December 2011Submission by Kenneth Sibly, November 2011 Submission by Kenneth Sibly, November 2011
                                      Sibly, Ken
                                      Submission
                                      Buildings - Representative Sample
                                      Cambridge 233
                                    2011-10-27-17- 24-1927 October 2011Submission by Local Government New Zealand, October 2011Submission by Local Government New Zealand, October 2011
                                      Local Government New Zealand
                                      Submission
                                    • Buildings - Other
                                    • Standards and Regulation
                                    • Unreinforced Masonry Buildings (URM)
                                      2012-02-13-11- 42-3313 February 2012Submission by Malcolm Flain, October 2011Submission by Malcolm Flain, October 2011
                                        Flain, Malcolm
                                        Submission
                                      • Engineering
                                      • Geotechnical
                                      • Standards and Regulation

                                        Search results navigation

                                        Displaying 1232 - 1251 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last