CTV Building hearing: Sample calculations on the connection of the floor slab at level 6 to the wall on grid 5 by Arthur O'Leary, August 2012
Browse other document categories
Summary
CTV Building hearing: Sample calculations on the connection of the floor slab at level 6 to the wall on grid 5 by Arthur O'Leary, dated 11 August 2012.
Hearing date: 16 and 17 August 2012 (Geoff Banks)
Available formats
CTV Building hearing: Sample calculations on the connection of the floor slab at level 6 to the wall on grid 5 by Arthur O'Leary, August 2012 PDF, 3 pages, 1.04 mbDate added to this website: 17 August 2012
About this document
Record ID | Attachment | Author(s) | Subject(s) | Building(s) | Action |
---|
To view other documents by the same author, or documents relating to the same subject or building choose one of the links above.