Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Sorted descending Building(s) Not sorted Action
2012-02-16-15- 07-3516 February 2012Colombo 382 hearing: Response from Opus International Consultants Ltd to Canterbury Earthquakes Royal CommissionColombo 382 hearing: Response from Opus International Consultants Ltd to Canterbury Earthquakes Royal Commission
  • Hughes, Glen
  • Opus International Consultants Ltd
    Exhibit
    Buildings - Representative Sample
  • Colombo 380
  • Colombo 382
2012-11-23-12- 28-3323 November 2012CTV Building hearing: Collection of documents in relation to 1986 Seminar: Design of Concrete StructuresCTV Building hearing: Collection of documents in relation to 1986 Seminar: Design of Concrete Structures
    Various
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-31-15- 30-2031 July 2012CTV Building hearing: Photographs of column remnants CTV Building hearing: Photographs of column remnants
    Fenwick, Richard
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-10-25-14- 39-0825 October 2012Independent Assessment on Earthquake Performance of Westpac Tower - 166 Cashel Street: Report by Peter Smith and Vaughan England of Spencer Holmes Limited, February 2012 Independent Assessment on Earthquake Performance of Westpac Tower - 166 Cashel Street: Report by Peter Smith and Vaughan England of Spencer Holmes Limited, February 2012
  • England, Vaughan
  • Smith, Peter
  • Spencer Holmes Ltd
    Technical Report
    Buildings - Representative Sample
    Cashel 166
2011-12-01-16- 24-3501 December 20112011-11-29 PGC Building hearing transcript2011-11-29 PGC Building hearing transcript
    Various
    Transcript
    Buildings - Representative Sample
    Cambridge 233
2012-11-26-16- 27-5526 November 2012CTV Building hearing: CTV Building Drag Bar Capacity Assessment: Report prepared for the Royal Commission by Beca Infrastructure Ltd, June 2012CTV Building hearing: CTV Building Drag Bar Capacity Assessment: Report prepared for the Royal Commission by Beca Infrastructure Ltd, June 2012
    Beca Infrastructure Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2011-12-13-13- 16-3813 December 2011Coleridge 90 hearing: Summary for the hearingColeridge 90 hearing: Summary for the hearing
    Canterbury Earthquakes Royal Commission
    Opening Statement
    Buildings - Representative Sample
    Coleridge 90
2011-12-13-11- 44-3813 December 2011Colombo 593 hearing: Documents pertaining to Mark Ryburn, Opus ConsultantsColombo 593 hearing: Documents pertaining to Mark Ryburn, Opus Consultants
    Canterbury Earthquakes Royal Commission
    Exhibit
    Buildings - Representative Sample
    Colombo 593
2012-08-17-17- 52-5717 August 2012CTV Building hearing: New Zealand Fire Service Department of Operations and Training P3 Fire Investigation and Reporting process manualCTV Building hearing: New Zealand Fire Service Department of Operations and Training P3 Fire Investigation and Reporting process manual
    New Zealand Fire Service
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-02-15-15- 39-5615 February 2012High 246 hearing: Brief of Evidence of Jeffrey Gavin MatthewsHigh 246 hearing: Brief of Evidence of Jeffrey Gavin Matthews
    Matthews, Jeff
    Exhibit
    Buildings - Representative Sample
    High 246
2012-04-02-11- 04-0902 April 2012PGC Building hearing: Post-hearing submission from Holmes Consulting Group in relation to the PGC Building PGC Building hearing: Post-hearing submission from Holmes Consulting Group in relation to the PGC Building
  • Hannan, John
  • Holmes Consulting Group
  • Post hearing submission
  • Submission
    Buildings - Representative Sample
    Cambridge 233
2012-07-02-14- 57-5802 July 2012CTV Building hearing: Email response from John Drew to a request for information from the Royal Commission, March 2012 CTV Building hearing: Email response from John Drew to a request for information from the Royal Commission, March 2012
    Drew, John Maxwell
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-02-27-14- 57-4827 February 2012Lichfield 43 hearing: Statement of Evidence of Stephen James McCarthy, Christchurch City CouncilLichfield 43 hearing: Statement of Evidence of Stephen James McCarthy, Christchurch City Council
  • Christchurch City Council
  • McCarthy, Steve
    Exhibit
    Buildings - Representative Sample
    Lichfield 43
2012-08-14-14- 22-5214 August 2012CTV Building hearing: Calculations provided by Compusoft EngineeringCTV Building hearing: Calculations provided by Compusoft Engineering
    Compusoft Engineering
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-02-14- 55-4402 July 2012CTV Building hearing: Statement of Evidence of John Maxwell DrewCTV Building hearing: Statement of Evidence of John Maxwell Drew
    Drew, John Maxwell
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-11-23-08- 37-0323 November 2012CTV Building hearing - Second addendum to the report CTV Building Geotechnical Advice CTV Building hearing - Second addendum to the report CTV Building Geotechnical Advice
  • Sinclair, Tim
  • Tonkin & Taylor Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-08-21-10- 59-4721 August 20122012-08-17 CTV Building hearing transcript2012-08-17 CTV Building hearing transcript
    Speakers - Various
    Transcript
    Buildings - Representative Sample
    Madras 249
2012-09-10-11- 39-5110 September 2012Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011
  • Allington, Chris
  • Holmes Solutions
    Technical Report
    Buildings - Representative Sample
  • Cashel 166
  • Cashel 224
  • Gloucester 62
2012-08-16-17- 06-2816 August 2012CTV Building hearing: Brief of Evidence of Trevor RobertsonCTV Building hearing: Brief of Evidence of Trevor Robertson
    Robertson, Trevor
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-01-23-12- 27-1023 January 20122012-01-17 Hotel Grand Chancellor hearing transcript2012-01-17 Hotel Grand Chancellor hearing transcript
    Speakers - Various
    Transcript
    Buildings - Representative Sample
    Cashel 161

Search results navigation

Displaying 1321 - 1340 of 1689 items arrow left First arrow left Prev arrow right Next arrow right Last