Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted descending Subject(s) Not sorted Building(s) Not sorted Action
2012-04-0505 April 2012Heritage Buildings, Earthquake Strengthening and Damage: The Canterbury Earthquakes September 2010-January 2012: Technical report by Robert McClean and NZHPTHeritage Buildings, Earthquake Strengthening and Damage: The Canterbury Earthquakes September 2010-January 2012: Technical report by Robert McClean and NZHPT
    New Zealand Historic Places Trust
    Technical Report
    Unreinforced Masonry Buildings (URM)
    2011-10-2121 October 2011Inelastic Response Spectra for the Christchurch Earthquake Records: Technical Report by Professor Emeritus Athol J. Carr, September 2011Inelastic Response Spectra for the Christchurch Earthquake Records: Technical Report by Professor Emeritus Athol J. Carr, September 2011
      Carr, Athol J
      Technical Report
      Engineering
      2011-10-2121 October 2011Probabilities of aftershocks and larger events for the 2010 Darfield earthquake based on average behaviour of New Zealand earthquakes: Technical Report by GNS Science, 2011Probabilities of aftershocks and larger events for the 2010 Darfield earthquake based on average behaviour of New Zealand earthquakes: Technical Report by GNS Science, 2011
        GNS Science
        Technical Report
        Seismicity
        2011-10-2121 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011
        • GNS Science
        • Webb, T H (Terry)
          Technical Report
          Seismicity
          2011-11-0303 November 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011
          • Griffith, Michael C
          • Ingham, Jason M
          • University of Auckland
            Technical Report
            Unreinforced Masonry Buildings (URM)
            2012-06-2525 June 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012
            • Hyland Consultants Ltd
            • Hyland, Clark
            • Smith, Ashley
            • Structure Smith Consulting Engineers
              Technical Report
              Buildings - Representative Sample
              Madras 249
            2012-09-1010 September 2012Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011
            • Allington, Chris
            • Holmes Solutions
              Technical Report
              Buildings - Representative Sample
            • Cashel 166
            • Cashel 224
            • Gloucester 62
            2012-01-1717 January 2012Hotel Grand Chancellor hearing: Report on the Structural Performance of the Hotel Grand Chancellor in the Earthquake of 22 February 2011Hotel Grand Chancellor hearing: Report on the Structural Performance of the Hotel Grand Chancellor in the Earthquake of 22 February 2011
              Dunning Thornton Consultants Ltd
              Technical Report
            • Buildings - Representative Sample
            • Structural Performance
              Cashel 161
            2011-11-0303 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, September 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, September 2011
              Turner, Fred
              Technical Report
              Unreinforced Masonry Buildings (URM)
              2011-10-2121 October 2011System of Building Controls - Appendix A, Section 3: Development of structural design and standards - Overview timeline of standards relating to determination of loads and methods of determining loads: Technical report compiled by Standards New Zealand, August 2011System of Building Controls - Appendix A, Section 3: Development of structural design and standards - Overview timeline of standards relating to determination of loads and methods of determining loads: Technical report compiled by Standards New Zealand, August 2011
              • Department of Building and Housing
              • Standards New Zealand
                Technical Report
                Standards and Regulation
                2011-10-2121 October 2011System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - references and appendices for assessment and improvement of the structural performance of buildings in earthquakes: Technical report by New Zealand Cabinet, June 2006System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - references and appendices for assessment and improvement of the structural performance of buildings in earthquakes: Technical report by New Zealand Cabinet, June 2006
                • Department of Building and Housing
                • New Zealand Cabinet
                  Technical Report
                  Standards and Regulation
                  2012-03-1212 March 2012Historical Review of Masonry Standards in New Zealand: Technical report prepared by Peter C Smith and Jonathan W Devine of Spencer Holmes Ltd, August 2011 Historical Review of Masonry Standards in New Zealand: Technical report prepared by Peter C Smith and Jonathan W Devine of Spencer Holmes Ltd, August 2011
                  • Devine, Jonathan
                  • Smith, Peter
                  • Spencer Holmes Ltd
                    Technical Report
                  • Standards and Regulation
                  • Unreinforced Masonry Buildings (URM)
                    2011-11-0707 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 5 of 5, Page 171-196Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 5 of 5, Page 171-196
                      Christchurch City Council
                      Technical Report
                      Placarding (Stickering)
                      2011-11-0707 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 2 of 5, Page 81-117Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 2 of 5, Page 81-117
                        Christchurch City Council
                        Technical Report
                        Placarding (Stickering)
                        2011-11-0707 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 3 of 5, Page 118 -146Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 3 of 5, Page 118 -146
                          Christchurch City Council
                          Technical Report
                          Placarding (Stickering)
                          2011-11-0707 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 4 of 5, Page 147-170Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 4 of 5, Page 147-170
                            Christchurch City Council
                            Technical Report
                            Placarding (Stickering)
                            2011-11-1515 November 2011Letter from the Department of Building and Housing about the Forsyth Barr building report, November 2011Letter from the Department of Building and Housing about the Forsyth Barr building report, November 2011
                            • Department of Building and Housing
                            • Hopkins, David
                              Technical Report
                            • Buildings - Representative Sample
                            • RFI and EOI
                              Colombo 764
                            2012-10-2424 October 2012Independent Earthquake Performance Assessment of Christchurch Civic Building - 53 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, March 2012Independent Earthquake Performance Assessment of Christchurch Civic Building - 53 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, March 2012
                            • Brooke, Nicholas
                            • Compusoft Engineering
                              Technical Report
                              Buildings - Representative Sample
                              Hereford 53
                            2012-10-2525 October 2012Independent Assessment on Earthquake Performance of Craigs Investment Partners House - 90 Armagh Street: Report prepared by Peter Smith and Jonathan Devine of Spencer Holmes Limited, February 2012Independent Assessment on Earthquake Performance of Craigs Investment Partners House - 90 Armagh Street: Report prepared by Peter Smith and Jonathan Devine of Spencer Holmes Limited, February 2012
                            • Devine, Jonathan
                            • Smith, Peter
                            • Spencer Holmes Ltd
                              Technical Report
                              Buildings - Representative Sample
                              Armagh 90
                            2012-10-2424 October 2012Independent Earthquake Performance Assessment of Christchurch Central Police Station - 48 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, February 2012Independent Earthquake Performance Assessment of Christchurch Central Police Station - 48 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, February 2012
                              Compusoft Engineering
                              Technical Report
                              Buildings - Representative Sample
                              Hereford 48

                            Search results navigation

                            Displaying 37 - 56 of 90 items arrow left First arrow left Prev arrow right Next arrow right Last