Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Sorted descending Building(s) Not sorted Action
2012-07-10-12- 29-1110 July 2012CTV Building hearing: CTV Building Collapse Technical Investigation - presentation by Dr Clark Hyland and Ashley SmithCTV Building hearing: CTV Building Collapse Technical Investigation - presentation by Dr Clark Hyland and Ashley Smith
  • Hyland, Clark
  • Smith, Ashley
    Exhibit
    Engineering
    Madras 249
2012-02-23-12- 23-1123 February 2012Forsyth Barr hearing: Review by Holmes Consulting Group of technical investigation reports prepared for Department of Building and HousingForsyth Barr hearing: Review by Holmes Consulting Group of technical investigation reports prepared for Department of Building and Housing
  • Black, Bruce
  • Holmes Consulting Group
    Opening Statement
    Engineering
  • Cambridge 233
  • Cashel 161
  • Colombo 764
2012-03-12-13- 05-4612 March 2012Requirement for Future Buildings: Submission by Rod Fulford on behalf of Precast New Zealand Inc, December 2011Requirement for Future Buildings: Submission by Rod Fulford on behalf of Precast New Zealand Inc, December 2011
  • Fulford, Rod
  • Precast New Zealand Inc
  • Exhibit
  • Submission
    Engineering
    2012-03-12-12- 39-5512 March 2012Review of Expert Panel Report Chapter 4 - Context: Presentation by William T. HolmesReview of Expert Panel Report Chapter 4 - Context: Presentation by William T. Holmes
      Holmes, William T
      Exhibit
      Engineering
      Cambridge 233
    2012-09-13-10- 06-4013 September 2012IPENZ engineering ethics webinar slidesIPENZ engineering ethics webinar slides
      Institution of Professional Engineers New Zealand (IPENZ)
      Post hearing submission
      Engineering
      2012-09-13-09- 59-2813 September 2012Table of actions initiated by IPENZ following the 2003 Structural TaskforceTable of actions initiated by IPENZ following the 2003 Structural Taskforce
        Institution of Professional Engineers New Zealand (IPENZ)
        Post hearing submission
        Engineering
        2012-09-13-11- 00-3413 September 2012 IPENZ collection of published articles IPENZ collection of published articles
          Institution of Professional Engineers New Zealand (IPENZ)
          Post hearing submission
          Engineering
          2012-08-27-13- 59-5027 August 2012Training and Education of Engineers and Organisation of the Engineering Profession: Submission from Matt Furness on the Royal Commission Discussion Paper, August 2012Training and Education of Engineers and Organisation of the Engineering Profession: Submission from Matt Furness on the Royal Commission Discussion Paper, August 2012
            Furness, Matt
            Submission
            Engineering
            2012-08-14-14- 22-5214 August 2012CTV Building hearing: Calculations provided by Compusoft EngineeringCTV Building hearing: Calculations provided by Compusoft Engineering
              Compusoft Engineering
              Exhibit
              Engineering
              Madras 249
            2012-08-16-17- 02-4016 August 2012CTV Building hearing: Third Statement of Evidence of John Barrie ManderCTV Building hearing: Third Statement of Evidence of John Barrie Mander
              Mander, John
              Exhibit
              Engineering
              Madras 249
            2012-08-17-14- 40-3217 August 2012CTV Building hearing: Report by Charles Clifton on the Analysis of the CTV Floor Diaphragm Adequacy prepared for Hyland Consultant Ltd CTV Building hearing: Report by Charles Clifton on the Analysis of the CTV Floor Diaphragm Adequacy prepared for Hyland Consultant Ltd
            • Clifton, Charles
            • University of Auckland
              Exhibit
              Engineering
              Madras 249
            2012-08-15-11- 36-0715 August 2012CTV Building hearing: Reinforced Concrete Structures, by R Park and T Paulay, Section 6.4CTV Building hearing: Reinforced Concrete Structures, by R Park and T Paulay, Section 6.4
            • Park, R
            • Paulay, Park
              Exhibit
              Engineering
              2012-09-06-16- 25-4406 September 2012CTV Building hearing: Structural detail drawings by Michael BrooksCTV Building hearing: Structural detail drawings by Michael Brooks
                Brooks, Michael
                Referenced Document
                Engineering
                Madras 249
              2012-07-10-12- 00-1510 July 2012CTV Building hearing: Diagram for building, including walls, internal column support, and shear wall loadsCTV Building hearing: Diagram for building, including walls, internal column support, and shear wall loads
                Fenwick, Richard
                Exhibit
                Engineering
                Madras 249
              2012-07-10-12- 03-3410 July 2012CTV Building hearing: Tables from CTV Non-Linear Seismic Analysis Report, by Compusoft Engineering Limited, showing diaphragm connection forces - LytteltonCTV Building hearing: Tables from CTV Non-Linear Seismic Analysis Report, by Compusoft Engineering Limited, showing diaphragm connection forces - Lyttelton
              • Bradley, Derek
              • Compusoft Engineering
              • Stuart, Tony
                Exhibit
                Engineering
                2012-07-24-16- 12-1824 July 2012CTV Building hearing: Section 2 of presentation by John Mander: Progressive Damage Accumulation in Earthquakes within the context of the CTV BuildingCTV Building hearing: Section 2 of presentation by John Mander: Progressive Damage Accumulation in Earthquakes within the context of the CTV Building
                  Mander, John
                  Exhibit
                  Engineering
                  Madras 249
                2012-07-24-16- 10-4924 July 2012CTV Building hearing: An alternative collapse scenario for the CTV Building - presentation from Professor John Mander CTV Building hearing: An alternative collapse scenario for the CTV Building - presentation from Professor John Mander
                  Mander, John
                  Exhibit
                  Engineering
                  Madras 249
                2012-08-01-16- 08-4301 August 2012CTV Building hearing: Comparison of CTV and Landsborough House buildingsCTV Building hearing: Comparison of CTV and Landsborough House buildings
                • Canterbury Earthquakes Royal Commission
                • Fenwick, Richard
                  Exhibit
                  Engineering
                • Durham 287
                • Madras 249
                2012-07-24-16- 13-1524 July 2012CTV Building hearing: Section 3 of presentation by John Mander: An alternative gravity-dominated collapse scenario CTV Building hearing: Section 3 of presentation by John Mander: An alternative gravity-dominated collapse scenario
                  Mander, John
                  Exhibit
                  Engineering
                  Madras 249
                2012-07-26-14- 49-4826 July 2012CTV Building hearing: CTV Elastic Response Spectra Analyses (ERSA) Report by Athol CarrCTV Building hearing: CTV Elastic Response Spectra Analyses (ERSA) Report by Athol Carr
                  Carr, Athol J
                  Exhibit
                  Engineering
                  Madras 249

                Search results navigation

                Displaying 638 - 657 of 1689 items arrow left First arrow left Prev arrow right Next arrow right Last