Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Sorted descending Building(s) Not sorted Action
2012-11-27-16- 17-1827 November 2012Basic Techniques for Quick and Rapid Post-Earthquake Assessments of Building Safety, paper by F. Vidal, M. Feriche and A. OntiverosBasic Techniques for Quick and Rapid Post-Earthquake Assessments of Building Safety, paper by F. Vidal, M. Feriche and A. Ontiveros
  • Feriche, M
  • Ontiveros, A
  • Vidal, F
    Referenced Document
    Standards and Regulation
    2012-11-27-16- 26-1027 November 2012An Examination of Improvements Required to Legislative Provisions for Post Disaster Reconstruction in New Zealand, doctoral thesis by Dr James RotimiAn Examination of Improvements Required to Legislative Provisions for Post Disaster Reconstruction in New Zealand, doctoral thesis by Dr James Rotimi
      Rotimi, James Olabode Bamidele
      Referenced Document
      Standards and Regulation
      2012-11-27-16- 30-3527 November 2012New Zealand Building Code Handbook Third Edition by the Department of Building and HousingNew Zealand Building Code Handbook Third Edition by the Department of Building and Housing
        Department of Building and Housing
      • Referenced Document
      • Technical Report
        Standards and Regulation
        2011-12-02-15- 26-4302 December 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011
          Institution of Professional Engineers New Zealand (IPENZ)
        • Referenced Document
        • Submission
        • Technical Report
          Standards and Regulation
          2012-11-27-16- 48-5627 November 2012Planning for Development of Land on or Close to Active Faults, report by GNS SciencePlanning for Development of Land on or Close to Active Faults, report by GNS Science
          • Brunsdon, Dave
          • GNS Science
          • Kerr, Janine
          • King, A B
          • Nathan, Simon
          • Van Dissen, Russ
          • Webb, Peter
            Referenced Document
            Standards and Regulation
            2011-11-02-12- 47-3602 November 2011Canterbury Earthquakes Royal Commission summary of the IPENZ report 'Standards and Regulation for Building Construction in New Zealand'Canterbury Earthquakes Royal Commission summary of the IPENZ report 'Standards and Regulation for Building Construction in New Zealand'
              Canterbury Earthquakes Royal Commission
              Technical Report
              Standards and Regulation
              2012-02-16-15- 01-4116 February 2012Submission by Institution of Professional Engineers New Zealand (IPENZ), 9 December 2011Submission by Institution of Professional Engineers New Zealand (IPENZ), 9 December 2011
                Institution of Professional Engineers New Zealand (IPENZ)
                Submission
                Standards and Regulation
                2012-11-27-16- 27-1527 November 2012Email correspondence between Jason Dowse, CERA and Royal Commission regarding Section 52 CERA ActEmail correspondence between Jason Dowse, CERA and Royal Commission regarding Section 52 CERA Act
                • Canterbury Earthquake Recovery Authority (CERA)
                • Canterbury Earthquakes Royal Commission
                • Dowse, Jason
                  Referenced Document
                  Standards and Regulation
                  2011-10-21-13- 54-5921 October 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011
                  • Bull, Des
                  • Holmes Consulting Group
                    Technical Report
                    Stairs and Floors
                    2012-02-23-11- 40-2023 February 2012Forsyth Barr hearing: Investigation into the collapse of the Forsyth Barr building stairs on 22nd February 2011Forsyth Barr hearing: Investigation into the collapse of the Forsyth Barr building stairs on 22nd February 2011
                      Beca Carter Hollings & Ferner Ltd (Beca)
                      Opening Statement
                      Stairs and Floors
                      Colombo 764
                    2012-02-24-12- 38-4624 February 2012Forsyth Barr hearing: Hyland building stairs site examination and materials testForsyth Barr hearing: Hyland building stairs site examination and materials test
                    • Hyland Consultants Ltd
                    • Hyland, Clark
                      Opening Statement
                      Stairs and Floors
                      Colombo 764
                    2012-02-24-12- 45-0524 February 2012Forsyth Barr hearing: Practice advisory issued by DBH on the topic of egress stairsForsyth Barr hearing: Practice advisory issued by DBH on the topic of egress stairs
                      Department of Building and Housing
                      Opening Statement
                      Stairs and Floors
                      2012-02-10-15- 12-2410 February 2012Ground Motion and Seismicity Aspects of 4 September 2010 Darfield and 22 February 2011 Christchurch Earthquakes: Technical report by Brendon Bradley of Bradley Seismic Ltd, January 2012Ground Motion and Seismicity Aspects of 4 September 2010 Darfield and 22 February 2011 Christchurch Earthquakes: Technical report by Brendon Bradley of Bradley Seismic Ltd, January 2012
                      • Bradley Seismic Ltd
                      • Bradley, Brendon
                        Technical Report
                        Seismicity
                        2012-03-12-13- 11-2812 March 2012Comments on Seismicity and Building Zone Factors: Submission by Ross Thomson, September 2011Comments on Seismicity and Building Zone Factors: Submission by Ross Thomson, September 2011
                          Thomson, Ross
                          Submission
                          Seismicity
                          2011-10-21-13- 21-3721 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Norman Abrahamson, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Norman Abrahamson, July 2011
                            Abrahamson, Norman
                            Technical Report
                            Seismicity
                            2011-10-21-13- 19-5221 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph J Archuleta, September 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph J Archuleta, September 2011
                              Archuleta, Ralph J
                              Technical Report
                              Seismicity
                              2011-10-21-13- 05-1421 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph Archuleta, October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph Archuleta, October 2011
                                Archuleta, Ralph J
                              • Exhibit
                              • Technical Report
                                Seismicity
                                2011-11-10-08- 44-1410 November 2011Submission by Civil Defence Emergency Management Group (CDEMG)/ Auckland Council, October 2011Submission by Civil Defence Emergency Management Group (CDEMG)/ Auckland Council, October 2011
                                  Auckland Council
                                  Submission
                                  Seismicity
                                  2012-03-12-12- 55-1612 March 2012Canterbury earthquakes sequence and implications for seismic design levels: submission by Department of Building and Housing, September 2011Canterbury earthquakes sequence and implications for seismic design levels: submission by Department of Building and Housing, September 2011
                                  • Department of Building and Housing
                                  • Kelly, David
                                    Submission
                                    Seismicity
                                    2011-10-28-10- 47-3128 October 2011Submission by Rachael Ford and Ed Radley, September 2011Submission by Rachael Ford and Ed Radley, September 2011
                                    • Ford, Rachael
                                    • Radley, Ed
                                      Submission
                                      Seismicity

                                      Search results navigation

                                      Displaying 253 - 272 of 1689 items arrow left First arrow left Prev arrow right Next arrow right Last