Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Sorted descending Building(s) Not sorted Action
2011-12-05-15- 04-2205 December 2011Guidance on detailed engineering evaluation of earthquake affected non-residential buildings in Canterbury - Part 2: Evaluation procedure (revision 5Guidance on detailed engineering evaluation of earthquake affected non-residential buildings in Canterbury - Part 2: Evaluation procedure (revision 5
    Engineering Advisory Group
    Exhibit
    Standards and Regulation
    2012-08-15-11- 51-5015 August 2012Training and Education of Engineers and Organisation of the Engineering Profession: Joint submission from the Institution of Professional Engineers New Zealand (IPENZ) and the Association of Consulting Engineers New Zealand (ACENZ) on the Royal Commission Discussion Paper, July 2012Training and Education of Engineers and Organisation of the Engineering Profession: Joint submission from the Institution of Professional Engineers New Zealand (IPENZ) and the Association of Consulting Engineers New Zealand (ACENZ) on the Royal Commission Discussion Paper, July 2012
    • Association of Consulting Engineers New Zealand
    • Institution of Professional Engineers New Zealand (IPENZ)
      Submission
      Standards and Regulation
      2011-11-14-14- 32-3814 November 2011Draft Policy on Earthquake-Prone Buildings: Letter by Sir Miles Warren, ArchitectDraft Policy on Earthquake-Prone Buildings: Letter by Sir Miles Warren, Architect
        Warren, Miles
        Exhibit
        Standards and Regulation
        2011-11-10-09- 29-1110 November 2011Letter from Tararua District Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Tararua District Council about unreinforced masonry (URM) and earthquake-prone building policies
          King, Blair
          RFI Response
          Standards and Regulation
          2012-03-26-08- 54-2126 March 2012Comments on SESOC practice note "Design of Conventional Structural Systems Following the Canterbury Earthquakes": Submission by Dunning Thornton Consultants Ltd, March 2012Comments on SESOC practice note "Design of Conventional Structural Systems Following the Canterbury Earthquakes": Submission by Dunning Thornton Consultants Ltd, March 2012
            Dunning Thornton Consultants Ltd
            Submission
            Standards and Regulation
            2012-03-26-09- 17-0626 March 2012Submission from Hamilton City Council regarding SESOC practice note, February 2012Submission from Hamilton City Council regarding SESOC practice note, February 2012
            • Hamilton City Council
            • Saunders, Phil
              Submission
              Standards and Regulation
              2012-02-16-11- 29-3116 February 2012Education and Training in the Construction Industry: Submission by C. Lund & Son Ltd, February 2011Education and Training in the Construction Industry: Submission by C. Lund & Son Ltd, February 2011
              • C Lund & Son Ltd
              • Macgregor, Joanne
                Submission
                Standards and Regulation
                2011-11-14-17- 30-2514 November 2011Photos of Buildings in Wellington: Presentation by Wellington City Council, November 2011Photos of Buildings in Wellington: Presentation by Wellington City Council, November 2011
                  Wellington City Council
                  Exhibit
                  Standards and Regulation
                  2011-11-10-09- 31-4210 November 2011Letter from Horowhenua District Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Horowhenua District Council about unreinforced masonry (URM) and earthquake-prone building policies
                  • Horowhenua Disctrict Council
                  • Thomas, Tony
                    RFI Response
                    Standards and Regulation
                    2011-10-21-14- 30-3321 October 2011System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - Earthquake-Prone Building Provisions of the Building Act 2004: Policy Guidance for Territorial Authorities: Technical Report by Department of Building and Housing, June 2005System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - Earthquake-Prone Building Provisions of the Building Act 2004: Policy Guidance for Territorial Authorities: Technical Report by Department of Building and Housing, June 2005
                      Department of Building and Housing
                      Technical Report
                      Standards and Regulation
                      2012-03-26-09- 11-3026 March 2012Response to SESOC Practice Note on the Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Beca, March 2012Response to SESOC Practice Note on the Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Beca, March 2012
                        Beca Carter Hollings & Ferner Ltd (Beca)
                        Submission
                        Standards and Regulation
                        2011-11-10-09- 51-2810 November 2011Letter from Tasman District Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Tasman District Council about unreinforced masonry (URM) and earthquake-prone building policies
                          Humphries, Adrian
                          RFI Response
                          Standards and Regulation
                          2011-11-10-09- 42-5310 November 2011Letter from Masterton District Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Masterton District Council about unreinforced masonry (URM) and earthquake-prone building policies
                          • Masterton District Council
                          • ten Hove, Wes
                            RFI Response
                            Standards and Regulation
                            2011-11-10-09- 49-1810 November 2011Letter from Marlborough District Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Marlborough District Council about unreinforced masonry (URM) and earthquake-prone building policies
                              Besley, Andrew
                              RFI Response
                              Standards and Regulation
                              2012-03-13-10- 57-2513 March 2012Submission on the Paper "Design of Conventional Structural Systems Following the Canterbury Earthquakes" by Colin Ashby of Ashby Consulting Engineering Ltd, March 2012Submission on the Paper "Design of Conventional Structural Systems Following the Canterbury Earthquakes" by Colin Ashby of Ashby Consulting Engineering Ltd, March 2012
                              • Ashby Consulting Engineering Ltd
                              • Ashby, Colin
                              • Exhibit
                              • Submission
                                Standards and Regulation
                                2011-10-28-13- 47-5428 October 2011Submission by Christchurch City Council, October 2011Submission by Christchurch City Council, October 2011
                                • Christchurch City Council
                                • Mitchell, Peter
                                  Submission
                                  Standards and Regulation
                                  2011-11-10-09- 53-5610 November 2011Letter from Hurunui District Council about unreinforced masonry (URM) and earthquake-prone building policies, October 2011Letter from Hurunui District Council about unreinforced masonry (URM) and earthquake-prone building policies, October 2011
                                  • Batchelor, Judith
                                  • Hurunui District Council
                                    RFI Response
                                    Standards and Regulation
                                    2011-10-21-14- 11-0421 October 2011System of Building Controls - Appendix A, Section 5: rapid assessment of buildings during a state of emergency - Building safety evaluation during a state of emergency - Guidelines for Territorial Authorities: Technical Report by New Zealand Society for Earthquake Engineering, August 2009System of Building Controls - Appendix A, Section 5: rapid assessment of buildings during a state of emergency - Building safety evaluation during a state of emergency - Guidelines for Territorial Authorities: Technical Report by New Zealand Society for Earthquake Engineering, August 2009
                                    • Department of Building and Housing
                                    • New Zealand Society for Earthquake Engineering
                                      Technical Report
                                      Standards and Regulation
                                      2011-11-10-09- 44-3510 November 2011Letter from Porirua City Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Porirua City Council about unreinforced masonry (URM) and earthquake-prone building policies
                                      • Porirua City Council
                                      • Taane, Shane
                                        RFI Response
                                        Standards and Regulation
                                        2011-10-21-12- 50-0821 October 2011System of Building Controls: Letter by Department of Building and Housing to Royal Commission regarding requested documents relating to building failure caused by Canterbury earthquakes, May 2011System of Building Controls: Letter by Department of Building and Housing to Royal Commission regarding requested documents relating to building failure caused by Canterbury earthquakes, May 2011
                                        • Bach, Katrina
                                        • Department of Building and Housing
                                          Technical Report
                                          Standards and Regulation

                                          Search results navigation

                                          Displaying 114 - 133 of 1689 items arrow left First arrow left Prev arrow right Next arrow right Last