Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted descending Subject(s) Not sorted Building(s) Not sorted Action
2012-11-23-12- 11-5723 November 2012CTV Building hearing: Engineering Calculations by Alan Reay, Consulting Engineer, dated 26 June 1986CTV Building hearing: Engineering Calculations by Alan Reay, Consulting Engineer, dated 26 June 1986
    Reay, Alan
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-01-23-15- 46-1423 January 2012Lichfield 116 hearing: Response from Christchurch City Council to Royal Commission In Relation to Ruben BladesLichfield 116 hearing: Response from Christchurch City Council to Royal Commission In Relation to Ruben Blades
  • Gilbert, Chris
  • Christchurch City Council
    Exhibit
    Buildings - Representative Sample
    Lichfield 116
2012-01-23-17- 45-4723 January 2012Lichfield 116 hearing: Statement of Evidence of Stephen James McCarthy, Christchurch City CouncilLichfield 116 hearing: Statement of Evidence of Stephen James McCarthy, Christchurch City Council
  • Christchurch City Council
  • McCarthy, Steve
    Exhibit
    Buildings - Representative Sample
    Lichfield 116
2012-07-26-12- 04-4126 July 2012CTV Building hearing: CTV Building Non-Linear Time History Analysis (NTHLA) Report: first draft issue prepared by Compusoft Engineering LimitedCTV Building hearing: CTV Building Non-Linear Time History Analysis (NTHLA) Report: first draft issue prepared by Compusoft Engineering Limited
  • Bradley, Derek
  • Brooke, Nicholas
  • Compusoft Engineering
  • Stuart, Tony
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-02-16-14- 22-1916 February 2012Colombo 382 hearing: Letter sent from Canterbury Earthquakes Royal Commission to Ling's Design ConsultantsColombo 382 hearing: Letter sent from Canterbury Earthquakes Royal Commission to Ling's Design Consultants
  • Canterbury Earthquakes Royal Commission
  • Zarifeh, Mark
    Exhibit
    Buildings - Representative Sample
  • Colombo 380
  • Colombo 382
2012-02-23-15- 08-3223 February 2012Forsyth Barr hearing: Investigation into collapse of stairs in the Forsyth Barr building: Presentation by Rob Jury and Richard Sharpe of BecaForsyth Barr hearing: Investigation into collapse of stairs in the Forsyth Barr building: Presentation by Rob Jury and Richard Sharpe of Beca
  • Beca Carter Hollings & Ferner Ltd (Beca)
  • Jury, Rob
  • Sharpe, Richard
    Exhibit
    Buildings - Representative Sample
    Colombo 764
2012-06-28-11- 31-3928 June 2012CTV Building hearing: Statement of Evidence of Peter George Van der ZeeCTV Building hearing: Statement of Evidence of Peter George Van der Zee
    Van der Zee, Peter George
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-12-15- 18-2412 July 2012CTV Building hearing: Programme for the seminar on Design of Concrete Structures held in July 1986 at the University of Canterbury CTV Building hearing: Programme for the seminar on Design of Concrete Structures held in July 1986 at the University of Canterbury
    University of Canterbury
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-03-12-13- 18-5112 March 2012Colombo 593 hearing: Email correspondence provided by Chris Chapman of Harcourts (1 of 3)Colombo 593 hearing: Email correspondence provided by Chris Chapman of Harcourts (1 of 3)
    Various
    Exhibit
    Buildings - Representative Sample
    Colombo 593
2012-08-08-16- 05-5108 August 2012CTV Building hearing: Further Supplementary Brief of Evidence of Anthony Joseph ScottCTV Building hearing: Further Supplementary Brief of Evidence of Anthony Joseph Scott
    Scott, Anthony Joseph
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-05-11- 13-5305 July 2012CTV Building hearing: Statement of Evidence of William David Coatsworth, Attachments part ICTV Building hearing: Statement of Evidence of William David Coatsworth, Attachments part I
    Coatsworth, D
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-25-16- 12-3625 July 2012CTV Building hearing: Statement of Evidence of David FalloonCTV Building hearing: Statement of Evidence of David Falloon
    Falloon, David
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-26-12- 31-3226 July 2012CTV Building hearing: Comments on interpretation of Nonlinear Time History Analysis (NLTHA) report by Brendon A BradleyCTV Building hearing: Comments on interpretation of Nonlinear Time History Analysis (NLTHA) report by Brendon A Bradley
    Bradley, Brendon
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-11-23-09- 57-4823 November 2012CTV Building hearing - Joint report of Non-Linear Time History Analysis Panel, dated 16 July 2012CTV Building hearing - Joint report of Non-Linear Time History Analysis Panel, dated 16 July 2012
  • Bradley, Brendon
  • Bradley, Derek
  • Carr, Athol J
  • Mander, John
  • McVerry, Graeme
  • Shepherd, Robin
  • Smith, Ashley
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-02-01-10- 54-4201 February 2012Colombo 603 and 605-613 hearing: Collection of documents pertaining to Yee Brothers SyndicateColombo 603 and 605-613 hearing: Collection of documents pertaining to Yee Brothers Syndicate
  • Canterbury Earthquakes Royal Commission
  • Christchurch City Council
    Exhibit
    Buildings - Representative Sample
    Colombo 603
2012-06-27-17- 31-5427 June 2012CTV Building hearing: Brief of Evidence of John Fletcher TrowsdaleCTV Building hearing: Brief of Evidence of John Fletcher Trowsdale
    Trowsdale, John
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-11-23-11- 55-1123 November 2012CTV Building hearing: First Statement of Evidence of Athol James Carr in relation to the Elastic Response Spectra Analysis of the CTV BuildingCTV Building hearing: First Statement of Evidence of Athol James Carr in relation to the Elastic Response Spectra Analysis of the CTV Building
    Carr, Athol J
    Exhibit
    Engineering
    Madras 249
2012-07-10-12- 25-4110 July 2012CTV Building hearing: Drawings provided by Graham Frost of interior beam/column joint and PC Beam Stress concept CTV Building hearing: Drawings provided by Graham Frost of interior beam/column joint and PC Beam Stress concept
    Frost, Graham
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-02-15-16- 29-2315 February 2012High 246 hearing: Brief of Evidence of Alistair Geoffrey BoysHigh 246 hearing: Brief of Evidence of Alistair Geoffrey Boys
    Boys, Alistair
    Exhibit
    Buildings - Representative Sample
    High 246
2012-02-23-11- 59-2823 February 2012Forsyth Barr hearing: Statement of Grant Ashley CameronForsyth Barr hearing: Statement of Grant Ashley Cameron
    Cameron, Grant
    Exhibit
    Buildings - Representative Sample
    Colombo 764

Search results navigation

Displaying 1168 - 1187 of 1356 items arrow left First arrow left Prev arrow right Next arrow right Last