Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted descending Subject(s) Not sorted Building(s) Not sorted Action
2012-07-10-12- 03-3410 July 2012CTV Building hearing: Tables from CTV Non-Linear Seismic Analysis Report, by Compusoft Engineering Limited, showing diaphragm connection forces - LytteltonCTV Building hearing: Tables from CTV Non-Linear Seismic Analysis Report, by Compusoft Engineering Limited, showing diaphragm connection forces - Lyttelton
  • Bradley, Derek
  • Compusoft Engineering
  • Stuart, Tony
    Exhibit
    Engineering
    2012-07-10-12- 14-0910 July 2012CTV Building hearing: Email between David Hopkins, Mike Stannard, and Sherwyn Williams regarding Clark and Ashley's reportsCTV Building hearing: Email between David Hopkins, Mike Stannard, and Sherwyn Williams regarding Clark and Ashley's reports
      Various
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-07-10-12- 06-4510 July 2012CTV Building hearing: Conclusion of draft report prepared by Dr Clark Hyland and Ashley Smith for DBHCTV Building hearing: Conclusion of draft report prepared by Dr Clark Hyland and Ashley Smith for DBH
    • Hyland Consultants Ltd
    • Hyland, Clark
    • Smith, Ashley
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-07-10-15- 37-4910 July 2012CTV Building hearing: DBH email from Rob Jury to Nigel Priestley and Clark Hyland in relation to CTV Analyses and Collapse ScenariosCTV Building hearing: DBH email from Rob Jury to Nigel Priestley and Clark Hyland in relation to CTV Analyses and Collapse Scenarios
    • Hyland, Clark
    • Jury, Rob
    • Priestley, Nigel
    • Various
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-07-13-09- 53-2713 July 2012CTV Building hearing: Combined statements of evidence of Dr Alan ReayCTV Building hearing: Combined statements of evidence of Dr Alan Reay
      Reay, Alan
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-07-24-16- 12-1824 July 2012CTV Building hearing: Section 2 of presentation by John Mander: Progressive Damage Accumulation in Earthquakes within the context of the CTV BuildingCTV Building hearing: Section 2 of presentation by John Mander: Progressive Damage Accumulation in Earthquakes within the context of the CTV Building
      Mander, John
      Exhibit
    • Buildings - Representative Sample
    • Engineering
      Madras 249
    2012-07-24-16- 10-4924 July 2012CTV Building hearing: An alternative collapse scenario for the CTV Building - presentation from Professor John Mander CTV Building hearing: An alternative collapse scenario for the CTV Building - presentation from Professor John Mander
      Mander, John
      Exhibit
    • Buildings - Representative Sample
    • Engineering
      Madras 249
    2012-08-01-16- 08-4301 August 2012CTV Building hearing: Comparison of CTV and Landsborough House buildingsCTV Building hearing: Comparison of CTV and Landsborough House buildings
    • Canterbury Earthquakes Royal Commission
    • Fenwick, Richard
      Exhibit
    • Buildings - Representative Sample
    • Engineering
    • Durham 287
    • Madras 249
    2012-07-24-16- 13-1524 July 2012CTV Building hearing: Section 3 of presentation by John Mander: An alternative gravity-dominated collapse scenario CTV Building hearing: Section 3 of presentation by John Mander: An alternative gravity-dominated collapse scenario
      Mander, John
      Exhibit
    • Buildings - Representative Sample
    • Engineering
      Madras 249
    2012-07-26-12- 04-4126 July 2012CTV Building hearing: CTV Building Non-Linear Time History Analysis (NTHLA) Report: first draft issue prepared by Compusoft Engineering LimitedCTV Building hearing: CTV Building Non-Linear Time History Analysis (NTHLA) Report: first draft issue prepared by Compusoft Engineering Limited
    • Bradley, Derek
    • Brooke, Nicholas
    • Compusoft Engineering
    • Stuart, Tony
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-07-26-14- 49-4826 July 2012CTV Building hearing: CTV Elastic Response Spectra Analyses (ERSA) Report by Athol CarrCTV Building hearing: CTV Elastic Response Spectra Analyses (ERSA) Report by Athol Carr
      Carr, Athol J
      Exhibit
    • Buildings - Representative Sample
    • Engineering
      Madras 249
    2012-07-26-11- 40-1426 July 2012CTV Building hearing: Order as to Directions in relation to Non-Linear Time History Analysis EvidenceCTV Building hearing: Order as to Directions in relation to Non-Linear Time History Analysis Evidence
    • Canterbury Earthquakes Royal Commission
    • Cooper, Justice
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-07-25-10- 58-5525 July 2012CTV Building hearing: Ground Motion Aspects of the 22 February 2011 Christchurch Earthquake Related to Canterbury Television (CTV) - Presentation to the Royal Commission by Dr Brendon BradleyCTV Building hearing: Ground Motion Aspects of the 22 February 2011 Christchurch Earthquake Related to Canterbury Television (CTV) - Presentation to the Royal Commission by Dr Brendon Bradley
      Bradley, Brendon
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-07-26-13- 07-5226 July 2012CTV Building hearing: Order as to Directions in relation to Elastic Response Spectra Analysis EvidenceCTV Building hearing: Order as to Directions in relation to Elastic Response Spectra Analysis Evidence
    • Canterbury Earthquakes Royal Commission
    • Cooper, Justice
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-08-13-14- 30-4913 August 2012CTV Building hearing: Statement of Evidence of Arthur Joseph O'Leary in relation to the CTV BuildingCTV Building hearing: Statement of Evidence of Arthur Joseph O'Leary in relation to the CTV Building
      O'Leary, Arthur
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-08-15-15- 29-1815 August 2012CTV Building hearing: Statement of Evidence of Alexander Shane FairmaidCTV Building hearing: Statement of Evidence of Alexander Shane Fairmaid
      Fairmaid, Alexander
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-08-17-14- 43-0717 August 2012CTV Building hearing: Sample calculations on the connection of the floor slab at level 6 to the wall on grid 5 by Arthur O'Leary, August 2012 CTV Building hearing: Sample calculations on the connection of the floor slab at level 6 to the wall on grid 5 by Arthur O'Leary, August 2012
      O'Leary, Arthur
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-08-07-16- 58-5907 August 2012CTV Building hearing: Composite statement of evidence of Alan Reay - Permit issues CTV Building hearing: Composite statement of evidence of Alan Reay - Permit issues
      Reay, Alan
      Exhibit
    • Buildings - Representative Sample
    • Engineering
      2012-07-31-15- 21-3131 July 2012CTV Building hearing: ETABS output for Westpark TowerCTV Building hearing: ETABS output for Westpark Tower
        Harding, David
        Exhibit
        Buildings - Representative Sample
      • Cashel 56
      • Madras 249
      2012-08-17-16- 28-4517 August 2012CTV Building hearing: Composite Statement of Evidence of Alan Reay - Holmes Report and Retrofit IssuesCTV Building hearing: Composite Statement of Evidence of Alan Reay - Holmes Report and Retrofit Issues
        Reay, Alan
        Exhibit
      • Buildings - Representative Sample
      • Engineering
        Madras 249

      Search results navigation

      Displaying 1149 - 1168 of 1356 items arrow left First arrow left Prev arrow right Next arrow right Last