Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Sorted ascending Building(s) Not sorted Action
2012-11-27-16- 13-3927 November 2012Articel by T. Saito and S.K. Thakur on Post-earthquake Risk Inspection System for BuildingsArticel by T. Saito and S.K. Thakur on Post-earthquake Risk Inspection System for Buildings
  • Saito, Taiki
  • Thakur, Sunil Kumar
    Referenced Document
  • Building assessments after earthquakes
  • Engineering
  • Placarding (Stickering)
  • Safety Evaluation
    2012-11-27-16- 17-1827 November 2012Basic Techniques for Quick and Rapid Post-Earthquake Assessments of Building Safety, paper by F. Vidal, M. Feriche and A. OntiverosBasic Techniques for Quick and Rapid Post-Earthquake Assessments of Building Safety, paper by F. Vidal, M. Feriche and A. Ontiveros
    • Feriche, M
    • Ontiveros, A
    • Vidal, F
      Referenced Document
    • Building assessments after earthquakes
    • Engineering
    • Placarding (Stickering)
    • Standards and Regulation
      2012-11-27-16- 53-5427 November 2012ATC-20 Procedures for post-earthquake safety evaluation of buildings by the Applied Technology CouncilATC-20 Procedures for post-earthquake safety evaluation of buildings by the Applied Technology Council
        Applied Technology Council
        Referenced Document
      • Building assessments after earthquakes
      • Engineering
      • Safety Evaluation
        2012-11-27-16- 25-3427 November 2012Guidance for Engineers Assessing the Seismic Performance of Non-residential and Multi-unit Residential Buildings in Greater Christchurch, by the former Department of Building and HousingGuidance for Engineers Assessing the Seismic Performance of Non-residential and Multi-unit Residential Buildings in Greater Christchurch, by the former Department of Building and Housing
          Department of Building and Housing
          Referenced Document
        • Building assessments after earthquakes
        • Engineering
          2011-10-27-17- 12-0127 October 2011Submission by Auckland Council, October 2011Submission by Auckland Council, October 2011
          • Auckland Council
          • Reade, Patricia
            Submission
          • Building assessments after earthquakes
          • Placarding (Stickering)
          • Safety Evaluation
          • Seismic Strengthening
          • Standards and Regulation
          • Unreinforced Masonry Buildings (URM)
            2012-01-26-17- 44-4326 January 2012Manchester 200-204 hearing: Letter from Chris Gilbert, Christchurch City Council regarding the Council's request for an extension of time to file submissionsManchester 200-204 hearing: Letter from Chris Gilbert, Christchurch City Council regarding the Council's request for an extension of time to file submissions
              Gilbert, Chris
              Exhibit
            • Building assessments after earthquakes
            • Placarding (Stickering)
            • Safety Evaluation
            • Unreinforced Masonry Buildings (URM)
              2012-08-15-12- 36-1015 August 2012Building Management After Earthquakes: Submission by the New Zealand Society of Earthquake Engineering (NZSEE) on the Royal Commission Discussion Paper, July 2012Building Management After Earthquakes: Submission by the New Zealand Society of Earthquake Engineering (NZSEE) on the Royal Commission Discussion Paper, July 2012
                New Zealand Society for Earthquake Engineering
                Submission
              • Building assessments after earthquakes
              • Placarding (Stickering)
              • Safety Evaluation
                2012-08-15-13- 09-3315 August 2012Building Management after Earthquakes: Submission by the Structural Engineering Society of New Zealand (SESOC) on the Royal Commission Discussion Paper, July 2012Building Management after Earthquakes: Submission by the Structural Engineering Society of New Zealand (SESOC) on the Royal Commission Discussion Paper, July 2012
                  Structural Engineering Society of New Zealand
                  Submission
                • Building assessments after earthquakes
                • Placarding (Stickering)
                • Safety Evaluation
                  2012-08-15-13- 08-5715 August 2012Building Management after Earthquakes: Submission by the New Zealand Society for Risk Management on the Royal Commission Discussion Paper, July 2012Building Management after Earthquakes: Submission by the New Zealand Society for Risk Management on the Royal Commission Discussion Paper, July 2012
                    New Zealand Society for Risk Management
                    Submission
                  • Building assessments after earthquakes
                  • Placarding (Stickering)
                  • Safety Evaluation
                    2012-08-15-15- 20-0215 August 2012 Building Management after Earthquakes: Submission by Dunning Thornton Consultants Ltd on the Royal Commission Discussion Paper Building Management after Earthquakes: Submission by Dunning Thornton Consultants Ltd on the Royal Commission Discussion Paper
                      Dunning Thornton Consultants Ltd
                      Submission
                    • Building assessments after earthquakes
                    • Placarding (Stickering)
                    • Safety Evaluation
                      2012-08-15-15- 25-2315 August 2012Building Management After Earthquakes: Submission from Malcolm Flain on the Royal Commission Discussion Paper, December 2011Building Management After Earthquakes: Submission from Malcolm Flain on the Royal Commission Discussion Paper, December 2011
                        Flain, Malcolm
                        Submission
                      • Building assessments after earthquakes
                      • Placarding (Stickering)
                      • Safety Evaluation
                        2012-08-15-15- 38-1015 August 2012Building Management After Earthquakes: Submission from Nigel Harwood on the Royal Commission Discussion Paper, January 2012Building Management After Earthquakes: Submission from Nigel Harwood on the Royal Commission Discussion Paper, January 2012
                          Harwood, Nigel
                          Submission
                        • Building assessments after earthquakes
                        • Placarding (Stickering)
                        • Safety Evaluation
                          2012-08-15-15- 42-4015 August 2012Building Management after Earthquakes: Submission by the Ministry of Civil Defence & Emergency Management on the Royal Commission Discussion Paper, July 2012Building Management after Earthquakes: Submission by the Ministry of Civil Defence & Emergency Management on the Royal Commission Discussion Paper, July 2012
                            Ministry of Civil Defence & Emergency Management
                            Submission
                          • Building assessments after earthquakes
                          • Placarding (Stickering)
                          • Safety Evaluation
                            2012-09-04-16- 00-5304 September 2012Building Management after Earthquakes: Submission from Edward BlaikieBuilding Management after Earthquakes: Submission from Edward Blaikie
                              Blaikie, Edward L (Ted)
                              Submission
                            • Building assessments after earthquakes
                            • Placarding (Stickering)
                            • Safety Evaluation
                              2012-09-04-16- 00-2204 September 2012Building Management after Earthquakes: Submission from Edward BlaikieBuilding Management after Earthquakes: Submission from Edward Blaikie
                                Blaikie, Edward L (Ted)
                                Submission
                              • Building assessments after earthquakes
                              • Placarding (Stickering)
                              • Safety Evaluation
                                2012-08-15-15- 42-0115 August 2012Building Management After Earthquakes: Submission from Dr Marion Irwin on the Royal Commission Discussion Paper, February 2012Building Management After Earthquakes: Submission from Dr Marion Irwin on the Royal Commission Discussion Paper, February 2012
                                  Irwin, Marion
                                  Submission
                                • Building assessments after earthquakes
                                • Placarding (Stickering)
                                • Safety Evaluation
                                  2012-08-15-16- 22-1615 August 2012Building Management After Earthquakes: Submission from Christchurch City Council on the Royal Commission Discussion Paper, April 2012Building Management After Earthquakes: Submission from Christchurch City Council on the Royal Commission Discussion Paper, April 2012
                                    Christchurch City Council
                                    Submission
                                  • Building assessments after earthquakes
                                  • Placarding (Stickering)
                                  • Safety Evaluation
                                    2012-08-15-15- 52-5615 August 2012Building Management After Earthquakes: Submission from Auckland Council on the Royal Commission Discussion Paper, July 2012Building Management After Earthquakes: Submission from Auckland Council on the Royal Commission Discussion Paper, July 2012
                                    • Cummuskey, Patrick
                                    • Weight, Tim
                                      Submission
                                    • Building assessments after earthquakes
                                    • Placarding (Stickering)
                                    • Safety Evaluation
                                      2012-08-15-16- 22-5515 August 2012Building Management after Earthquakes: Submission from Christchurch City Council on the Royal Commission discussion paper, July 2012 Building Management after Earthquakes: Submission from Christchurch City Council on the Royal Commission discussion paper, July 2012
                                      • Christchurch City Council
                                      • Mitchell, Peter
                                        Submission
                                      • Building assessments after earthquakes
                                      • Placarding (Stickering)
                                      • Safety Evaluation
                                        2012-08-17-14- 11-0417 August 2012Building Management after Earthquakes: Submission by IPENZ on Royal Commission Discussion PaperBuilding Management after Earthquakes: Submission by IPENZ on Royal Commission Discussion Paper
                                          Institution of Professional Engineers New Zealand (IPENZ)
                                          Submission
                                        • Building assessments after earthquakes
                                        • Placarding (Stickering)
                                        • Safety Evaluation

                                          Search results navigation

                                          Displaying 1069 - 1088 of 1356 items arrow left First arrow left Prev arrow right Next arrow right Last