Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Sorted ascending Building(s) Not sorted Action
2012-03-0909 March 2012Architectural Implications of New Technologies (in seismic resistant design): Presentation by Associate Professor Andrew W Charleson, Victoria University, for the hearing on New Building TechnologiesArchitectural Implications of New Technologies (in seismic resistant design): Presentation by Associate Professor Andrew W Charleson, Victoria University, for the hearing on New Building Technologies
    Charleson, Andrew W
    Exhibit
    Architecture
    2012-02-1414 February 2012Colombo 601/601A hearing: Engineers inspection of damaged buildingsColombo 601/601A hearing: Engineers inspection of damaged buildings
      Campbell, Paul
      Exhibit
      Building assessments after earthquakes
    • Colombo 601
    • Colombo 601A
    2012-09-0303 September 2012Building Management after Earthquakes hearing: Presentation by Dave Brunsdon, FIPENZ on the Evaluation and Management of Buildings Following EarthquakesBuilding Management after Earthquakes hearing: Presentation by Dave Brunsdon, FIPENZ on the Evaluation and Management of Buildings Following Earthquakes
      Brunsdon, Dave
      Exhibit
      Building assessments after earthquakes
      2012-11-2323 November 2012CTV Building hearing: Post earthquake building performance assessment formCTV Building hearing: Post earthquake building performance assessment form
        Applied Technology Council
        Exhibit
        Building assessments after earthquakes
        2012-01-2626 January 2012Manchester 200-204 hearing: Letter from Chris Gilbert, Christchurch City Council regarding the Council's request for an extension of time to file submissionsManchester 200-204 hearing: Letter from Chris Gilbert, Christchurch City Council regarding the Council's request for an extension of time to file submissions
          Gilbert, Chris
          Exhibit
          Building assessments after earthquakes
          2012-09-0404 September 2012Building Management after Earthquakes hearing: Building Evaluation and Occupancy Assessment flowchartsBuilding Management after Earthquakes hearing: Building Evaluation and Occupancy Assessment flowcharts
            Department of Building and Housing
            Exhibit
            Building assessments after earthquakes
            2012-07-1010 July 2012CTV Building hearing: CTV Building Collapse Technical Investigation - presentation by Dr Clark Hyland and Ashley SmithCTV Building hearing: CTV Building Collapse Technical Investigation - presentation by Dr Clark Hyland and Ashley Smith
            • Hyland, Clark
            • Smith, Ashley
              Exhibit
              Building assessments after earthquakes
              Madras 249
            2012-09-0303 September 2012Building Management after Earthquakes hearing: Presentation by Ken Gledhill on Enhance Earthquake Information. Building Management after Earthquakes hearing: Presentation by Ken Gledhill on Enhance Earthquake Information.
              Gledhill, Ken
              Exhibit
              Building assessments after earthquakes
              2012-02-2828 February 2012Manchester 265-271 (Gloucester 173) hearing: Letter from Robert Spooner to Royal Commission regarding request for informationManchester 265-271 (Gloucester 173) hearing: Letter from Robert Spooner to Royal Commission regarding request for information
                Spooner, Robert
                Exhibit
                Building assessments after earthquakes
              • Gloucester 173
              • Manchester 265-271
              2012-09-0404 September 2012Building Management after Earthquakes hearing: Christchurch City Council Report into Building Safety Evaluation Processes in the Central Business District following the 22 February 2011 EarthquakeBuilding Management after Earthquakes hearing: Christchurch City Council Report into Building Safety Evaluation Processes in the Central Business District following the 22 February 2011 Earthquake
                Christchurch City Council
                Exhibit
                Building assessments after earthquakes
                2012-09-0404 September 2012Building Management after Earthquakes hearing: Memorandum of counsel for Christchurch City CouncilBuilding Management after Earthquakes hearing: Memorandum of counsel for Christchurch City Council
                  Christchurch City Council
                  Exhibit
                  Building assessments after earthquakes
                  2012-09-0303 September 2012Building Management after Earthquakes hearing: Presentation by Bret Lizundia on The Evaluation and Management of Buildings Following EarthquakesBuilding Management after Earthquakes hearing: Presentation by Bret Lizundia on The Evaluation and Management of Buildings Following Earthquakes
                    Lizundia, Bret
                    Exhibit
                    Building assessments after earthquakes
                    2012-09-0404 September 2012Building Management after Eathquakes hearing: Collection of documents in relation to building demolition at 192 Madras StreetBuilding Management after Eathquakes hearing: Collection of documents in relation to building demolition at 192 Madras Street
                    • Various
                    • White Fox & Jones Lawyers
                      Exhibit
                      Building assessments after earthquakes
                      Madras 192
                    2012-09-0404 September 2012Building Management after Earthquakes hearing: Presentation by Peter Woods, Ministry of Civil Defence and Emergency ManagementBuilding Management after Earthquakes hearing: Presentation by Peter Woods, Ministry of Civil Defence and Emergency Management
                    • Ministry of Civil Defence & Emergency Management
                    • Woods, Peter
                      Exhibit
                      Building assessments after earthquakes
                      2012-06-2525 June 2012CTV Building hearing: Certificate of Incorporation for Union Construction Limited, March 1987CTV Building hearing: Certificate of Incorporation for Union Construction Limited, March 1987
                        Companies Office
                        Exhibit
                        Building Failure
                        Madras 249
                      2012-02-1616 February 2012Colombo 382 hearing: Letter (extract) from Royal Commission to Glen Hughes, OpusColombo 382 hearing: Letter (extract) from Royal Commission to Glen Hughes, Opus
                      • Canterbury Earthquakes Royal Commission
                      • Zarifeh, Mark
                        Exhibit
                        Building Failure
                      • Colombo 380
                      • Colombo 382
                      2011-11-2828 November 2011Building Safety Evaluation Following the Canterbury Earthquakes: Technical report by the New Zealand Society for Earthquake Engineering, September 2011Building Safety Evaluation Following the Canterbury Earthquakes: Technical report by the New Zealand Society for Earthquake Engineering, September 2011
                      • Brunsdon, Dave
                      • New Zealand Society for Earthquake Engineering
                      • Exhibit
                      • Technical Report
                        Building Failure
                        2012-02-2424 February 2012Forsyth Barr hearing: Stairs & Ramps: Presentation by Des BullForsyth Barr hearing: Stairs & Ramps: Presentation by Des Bull
                          Bull, Des
                          Exhibit
                          Building Failure
                          Colombo 764
                        2012-11-2323 November 2012CTV Building hearing: Damage, Death and Downtime Risk Attenuation in the 2011Christchurch Earthquake; Paper written by John Mander and Y HuangCTV Building hearing: Damage, Death and Downtime Risk Attenuation in the 2011Christchurch Earthquake; Paper written by John Mander and Y Huang
                        • Huang, Y
                        • Mander, John
                          Exhibit
                          Building Failure
                          2012-03-1212 March 2012Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011
                          • Holmes, William T
                          • Rutherford & Chekene
                          • Exhibit
                          • Technical Report
                            Building Failure
                          • Cambridge 233
                          • Cashel 161
                          • Colombo 764

                          Search results navigation

                          Displaying 1 - 20 of 918 items arrow left disabled First arrow left disabled Prev arrow right Next arrow right Last