Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Sorted descending Action
2011-10-1919 October 2011Aftershock info for Geonet website: Expected number of aftershocks per day of magnitude 4.0-4.9 and expected number of aftershocks per day of magnitude 5 and largerAftershock info for Geonet website: Expected number of aftershocks per day of magnitude 4.0-4.9 and expected number of aftershocks per day of magnitude 5 and larger
  • Gerstenberger, Matthew
  • GNS Science
    Exhibit
    Seismicity
    2012-03-1212 March 2012Implications for structural design motions - Presentation to the Canterbury Earthquakes Royal Commission, October 2011Implications for structural design motions - Presentation to the Canterbury Earthquakes Royal Commission, October 2011
    • GNS Science
    • McVerry, Graeme
      Exhibit
      Seismicity
      2011-10-1919 October 20116.3 Magnitude Earthquake Part of Aftershock Sequence - includes graphic showing location of main shock, aftershocks above magnitude 3, and fault ruptures in Canterbury - Media Release by GNS Science, 25 February 20116.3 Magnitude Earthquake Part of Aftershock Sequence - includes graphic showing location of main shock, aftershocks above magnitude 3, and fault ruptures in Canterbury - Media Release by GNS Science, 25 February 2011
        GNS Science
        Exhibit
        Seismicity
        2011-10-1818 October 2011GNS Science - The Canterbury Earthquake Sequence - Presentation to the Canterbury Earthquakes Royal CommissionGNS Science - The Canterbury Earthquake Sequence - Presentation to the Canterbury Earthquakes Royal Commission
        • GNS Science
        • Webb, T H (Terry)
          Exhibit
          Seismicity
          2011-10-1919 October 2011Canterbury quake the most damaging since 1931 - includes map of large New Zealand earthquakes - Media Release from GNS Science, 4 September 2010Canterbury quake the most damaging since 1931 - includes map of large New Zealand earthquakes - Media Release from GNS Science, 4 September 2010
            GNS Science
            Exhibit
            Seismicity
            2011-10-2121 October 2011Probabilities of aftershocks and larger events for the 2010 Darfield earthquake based on average behaviour of New Zealand earthquakes: Technical Report by GNS Science, 2011Probabilities of aftershocks and larger events for the 2010 Darfield earthquake based on average behaviour of New Zealand earthquakes: Technical Report by GNS Science, 2011
              GNS Science
            • Exhibit
            • Technical Report
              Seismicity
              2011-10-1717 October 2011GNS Science - Webb Ancillary Slides: Presentation to the Canterbury Earthquakes Royal Commission - Slide 1 - Stress triggering in TurkeyGNS Science - Webb Ancillary Slides: Presentation to the Canterbury Earthquakes Royal Commission - Slide 1 - Stress triggering in Turkey
              • GNS Science
              • Webb, T H (Terry)
                Exhibit
                Seismicity
                2011-10-1919 October 2011Textbook Aftershock Sequence, Seismologist Says - includes graph: number of aftershocks per day greater than magnitude 5 - Media Release by GNS Science, 10 September 2010Textbook Aftershock Sequence, Seismologist Says - includes graph: number of aftershocks per day greater than magnitude 5 - Media Release by GNS Science, 10 September 2010
                  GNS Science
                  Exhibit
                  Seismicity
                  2011-11-1414 November 2011Draft Policy on Earthquake-Prone Buildings: Letter by Sir Miles Warren, ArchitectDraft Policy on Earthquake-Prone Buildings: Letter by Sir Miles Warren, Architect
                    Warren, Miles
                    Exhibit
                  • Standards and Regulation
                  • Unreinforced Masonry Buildings (URM)
                    2011-10-1919 October 2011Structural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard SpectraStructural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard Spectra
                      Standards New Zealand
                      Exhibit
                      Standards and Regulation
                      2011-10-1818 October 2011Structural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard SpectraStructural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard Spectra
                        Standards New Zealand
                        Exhibit
                        Standards and Regulation
                        2012-09-0404 September 2012Building Management after Earthquakes hearing: Memorandum of counsel for Christchurch City CouncilBuilding Management after Earthquakes hearing: Memorandum of counsel for Christchurch City Council
                          Christchurch City Council
                          Exhibit
                          Building assessments after earthquakes
                          2012-09-0404 September 2012Building Management after Earthquakes hearing: Building Evaluation and Occupancy Assessment flowchartsBuilding Management after Earthquakes hearing: Building Evaluation and Occupancy Assessment flowcharts
                            Department of Building and Housing
                            Exhibit
                            Building assessments after earthquakes
                            2011-11-0707 November 2011Building Act 1991 No 150Building Act 1991 No 150
                              New Zealand Parliament
                              Exhibit
                            • Standards and Regulation
                            • Unreinforced Masonry Buildings (URM)
                              2012-07-3131 July 2012CTV Building hearing: NZS 3101 Part 1: 1982 Code of practice for the Design of Concrete StructuresCTV Building hearing: NZS 3101 Part 1: 1982 Code of practice for the Design of Concrete Structures
                                Standards New Zealand
                                Exhibit
                                Standards and Regulation
                                2012-09-1010 September 2012Training and education of engineers and organisation of the engineering profession hearing: Briefing notes of Dr Andrew Cleland Training and education of engineers and organisation of the engineering profession hearing: Briefing notes of Dr Andrew Cleland
                                  Cleland, Andrew
                                  Exhibit
                                  Training and Education
                                  2012-09-1111 September 2012Roles and responsibilities hearing: Presentation by Dr David Kelly and Dr Peter Mumford of the Ministry of Business, Innovation and Employment (formerly DBH)Roles and responsibilities hearing: Presentation by Dr David Kelly and Dr Peter Mumford of the Ministry of Business, Innovation and Employment (formerly DBH)
                                  • Department of Building and Housing
                                  • Kelly, David
                                  • Mumford, Peter John
                                    Exhibit
                                    Roles and Responsibilities
                                    2012-09-1111 September 2012Roles and responsibilities hearing: Presentation from Dr Nicki Crauford, IPENZ Deputy Chief ExecutiveRoles and responsibilities hearing: Presentation from Dr Nicki Crauford, IPENZ Deputy Chief Executive
                                    • Crauford, Nicola Lane (Nicki)
                                    • Institution of Professional Engineers New Zealand (IPENZ)
                                      Exhibit
                                    • Roles and Responsibilities
                                    • Standards and Regulation
                                      2012-09-1212 September 2012Roles and responsibilities hearing: Presentation by Dr David Kelly of the Ministry of Business, Innovation and Employment (formerly DBH) Roles and responsibilities hearing: Presentation by Dr David Kelly of the Ministry of Business, Innovation and Employment (formerly DBH)
                                      • Department of Building and Housing
                                      • Kelly, David
                                        Exhibit
                                        Roles and Responsibilities
                                        2011-11-0909 November 2011Earthquake-prone building provisions of the Building Act 2004: Policy guidance for Territorial AuthoritiesEarthquake-prone building provisions of the Building Act 2004: Policy guidance for Territorial Authorities
                                          Department of Building and Housing
                                          Exhibit
                                        • Standards and Regulation
                                        • Unreinforced Masonry Buildings (URM)

                                          Search results navigation

                                          Displaying 87 - 106 of 931 items arrow left First arrow left Prev arrow right Next arrow right Last