Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Sorted descending Action
2012-03-14-16- 43-3514 March 2012Biography of Dr Nicola Crauford, Genesis Power LtdBiography of Dr Nicola Crauford, Genesis Power Ltd
    Crauford, Nicola Lane (Nicki)
    Exhibit
  • New Building Technologies
  • Roles and Responsibilities
    2012-09-04-16- 11-4504 September 2012Building Management after Earthquakes hearing: Christchurch City Council Report into Building Safety Evaluation Processes in the Central Business District following the 22 February 2011 EarthquakeBuilding Management after Earthquakes hearing: Christchurch City Council Report into Building Safety Evaluation Processes in the Central Business District following the 22 February 2011 Earthquake
      Christchurch City Council
      Exhibit
      Building assessments after earthquakes
      2012-09-14-14- 09-5414 September 20122012-09-12 Roles and Responsibilities hearing transcript2012-09-12 Roles and Responsibilities hearing transcript
        Speakers - Various
        Transcript
        Roles and Responsibilities
        2012-09-12-15- 30-3312 September 2012Roles and responsibilities hearing: Presentation from Geoff Hallam of International Accreditation New Zealand (IANZ) Roles and responsibilities hearing: Presentation from Geoff Hallam of International Accreditation New Zealand (IANZ)
        • Hallam, Geoff
        • International Accreditation New Zealand (IANZ)
          Exhibit
          Roles and Responsibilities
          2012-08-09-15- 39-3509 August 2012CTV Building hearing: NZS 3101 Part 2: 1982 Commentary on The Design Of Concrete StructuresCTV Building hearing: NZS 3101 Part 2: 1982 Commentary on The Design Of Concrete Structures
            Standards New Zealand
            Exhibit
            Standards and Regulation
            2012-03-09-08- 38-5809 March 2012Christchurch - Swamp to City - A Short History of the Christchurch Drainage Board 1875-1989, by John Wilson 1989: Submission by Ken Sibly, September 2011Christchurch - Swamp to City - A Short History of the Christchurch Drainage Board 1875-1989, by John Wilson 1989: Submission by Ken Sibly, September 2011
              Wilson, John
              Submission
              Geotechnical
              2012-11-27-16- 01-0927 November 2012The Analysis and Design of and the Evaluation of Design Actions for Reinforced Concrete Ductile Shear Wall Structures, article by T. Paulay and R.L. WilliamsThe Analysis and Design of and the Evaluation of Design Actions for Reinforced Concrete Ductile Shear Wall Structures, article by T. Paulay and R.L. Williams
              • Paulay, Thomas
              • Williams, Roger L
                Referenced Document
                Engineering
                2012-03-12-16- 23-3212 March 2012Summary of presentation for the hearing on New Building Technologies by Meagan Leigh DevineSummary of presentation for the hearing on New Building Technologies by Meagan Leigh Devine
                  Devine, Megan Leigh
                  Exhibit
                  New Building Technologies
                  2012-08-15-16- 24-3615 August 2012Building Management after Earthquakes: Submission by the Department of Building and Housing on the Royal Commission Discussion Paper, July 2012Building Management after Earthquakes: Submission by the Department of Building and Housing on the Royal Commission Discussion Paper, July 2012
                  • Department of Building and Housing
                  • Kelly, David
                    Submission
                  • Building assessments after earthquakes
                  • Engineering
                  • Placarding (Stickering)
                  • Safety Evaluation
                    2012-11-28-12- 22-3228 November 2012Summary by Dr Terry Webb of recent seismic hazard modelling by GNS ScienceSummary by Dr Terry Webb of recent seismic hazard modelling by GNS Science
                    • GNS Science
                    • Webb, T H (Terry)
                      Referenced Document
                      Seismicity
                      2012-11-27-16- 22-0827 November 2012Paper on An Efficient System for Acquiring Earthquake Damage Information in Damage Area, by A. Shibayama and Y. HisadaPaper on An Efficient System for Acquiring Earthquake Damage Information in Damage Area, by A. Shibayama and Y. Hisada
                      • Hisada, Yoshiaki
                      • Shibayama, Akihiro
                        Referenced Document
                      • Building assessments after earthquakes
                      • Placarding (Stickering)
                      • Safety Evaluation
                        2011-11-07-14- 28-4607 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 4 of 5, Page 147-170Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 4 of 5, Page 147-170
                          Christchurch City Council
                          Technical Report
                          Placarding (Stickering)
                          2012-08-22-12- 22-3322 August 2012Roles and Responsibilities: Submission from Environment Canterbury Regional Council on the Royal Commission Discussion Paper, August 2012Roles and Responsibilities: Submission from Environment Canterbury Regional Council on the Royal Commission Discussion Paper, August 2012
                            Environment Canterbury Regional Council
                            Submission
                          • Roles and Responsibilities
                          • Standards and Regulation
                            2012-08-17-14- 11-0417 August 2012Building Management after Earthquakes: Submission by IPENZ on Royal Commission Discussion PaperBuilding Management after Earthquakes: Submission by IPENZ on Royal Commission Discussion Paper
                              Institution of Professional Engineers New Zealand (IPENZ)
                              Submission
                            • Building assessments after earthquakes
                            • Placarding (Stickering)
                            • Safety Evaluation
                              2012-08-15-11- 36-0715 August 2012CTV Building hearing: Reinforced Concrete Structures, by R Park and T Paulay, Section 6.4CTV Building hearing: Reinforced Concrete Structures, by R Park and T Paulay, Section 6.4
                              • Park, R
                              • Paulay, Park
                                Exhibit
                                Engineering
                                2012-02-13-11- 44-5913 February 2012Submission by Christchurch City Council regarding response to Enfocus reportSubmission by Christchurch City Council regarding response to Enfocus report
                                  Christchurch City Council
                                  Submission
                                • Building Failure
                                • Safety Evaluation
                                  2012-11-27-15- 54-4827 November 2012Assessment of hollow-core floors for seismic performance - research reportAssessment of hollow-core floors for seismic performance - research report
                                  • Bull, Des
                                  • Fenwick, Richard
                                  • Gardiner, Debra
                                  • University of Canterbury
                                    Referenced Document
                                    Engineering
                                    2012-11-27-16- 04-2027 November 2012Guide to the National Civil Defence and Emergency Management PlanGuide to the National Civil Defence and Emergency Management Plan
                                      Ministry of Civil Defence & Emergency Management
                                      Referenced Document
                                      Emergency Powers and Procedures
                                      2011-11-15-09- 07-5115 November 20112011-11-09 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript2011-11-09 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript
                                        Speakers - Various
                                        Transcript
                                        Unreinforced Masonry Buildings (URM)
                                        2011-11-15-16- 11-5015 November 2011Objectives, status, and future of the 2006 NZSEE Guidelines on 'Assessment and Improvement of the Structural Performance of Buildings in Earthquakes': Presentation by Rob Jury, 15 November 2011Objectives, status, and future of the 2006 NZSEE Guidelines on 'Assessment and Improvement of the Structural Performance of Buildings in Earthquakes': Presentation by Rob Jury, 15 November 2011
                                          Jury, Rob
                                          Exhibit
                                        • Standards and Regulation
                                        • Unreinforced Masonry Buildings (URM)

                                          Search results navigation

                                          Displaying 369 - 388 of 1517 items arrow left First arrow left Prev arrow right Next arrow right Last