Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Sorted ascending Action
2011-10-19-17- 06-5619 October 2011Structural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard SpectraStructural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard Spectra
    Standards New Zealand
    Exhibit
    Standards and Regulation
    2012-09-06-09- 14-1906 September 20122012-09-04 Building Management after Earthquakes hearing transcript2012-09-04 Building Management after Earthquakes hearing transcript
      Speakers - Various
      Transcript
      Building assessments after earthquakes
      2012-03-12-13- 07-3512 March 2012Presentation by Dr Rajesh Prasad Dhakal, University of Canterbury, for the hearing on New Building Technologies Presentation by Dr Rajesh Prasad Dhakal, University of Canterbury, for the hearing on New Building Technologies
        Dhakal, Rajesh P
        Exhibit
        New Building Technologies
        2012-09-13-11- 21-1913 September 2012National Building Consent Authority Competency Assessment System: Department of Building and Housing guidance documentNational Building Consent Authority Competency Assessment System: Department of Building and Housing guidance document
          Department of Building and Housing
          Post hearing submission
          Roles and Responsibilities
          2012-09-13-11- 00-3413 September 2012 IPENZ collection of published articles IPENZ collection of published articles
            Institution of Professional Engineers New Zealand (IPENZ)
            Post hearing submission
          • Engineering
          • Training and Education
            2012-03-14-16- 43-3514 March 2012Biography of Dr Nicola Crauford, Genesis Power LtdBiography of Dr Nicola Crauford, Genesis Power Ltd
              Crauford, Nicola Lane (Nicki)
              Exhibit
            • New Building Technologies
            • Roles and Responsibilities
              2012-09-04-16- 11-4504 September 2012Building Management after Earthquakes hearing: Christchurch City Council Report into Building Safety Evaluation Processes in the Central Business District following the 22 February 2011 EarthquakeBuilding Management after Earthquakes hearing: Christchurch City Council Report into Building Safety Evaluation Processes in the Central Business District following the 22 February 2011 Earthquake
                Christchurch City Council
                Exhibit
                Building assessments after earthquakes
                2012-09-14-14- 09-5414 September 20122012-09-12 Roles and Responsibilities hearing transcript2012-09-12 Roles and Responsibilities hearing transcript
                  Speakers - Various
                  Transcript
                  Roles and Responsibilities
                  2012-09-12-15- 30-3312 September 2012Roles and responsibilities hearing: Presentation from Geoff Hallam of International Accreditation New Zealand (IANZ) Roles and responsibilities hearing: Presentation from Geoff Hallam of International Accreditation New Zealand (IANZ)
                  • Hallam, Geoff
                  • International Accreditation New Zealand (IANZ)
                    Exhibit
                    Roles and Responsibilities
                    2012-08-09-15- 39-3509 August 2012CTV Building hearing: NZS 3101 Part 2: 1982 Commentary on The Design Of Concrete StructuresCTV Building hearing: NZS 3101 Part 2: 1982 Commentary on The Design Of Concrete Structures
                      Standards New Zealand
                      Exhibit
                      Standards and Regulation
                      2012-03-09-08- 38-5809 March 2012Christchurch - Swamp to City - A Short History of the Christchurch Drainage Board 1875-1989, by John Wilson 1989: Submission by Ken Sibly, September 2011Christchurch - Swamp to City - A Short History of the Christchurch Drainage Board 1875-1989, by John Wilson 1989: Submission by Ken Sibly, September 2011
                        Wilson, John
                        Submission
                        Geotechnical
                        2012-11-27-16- 01-0927 November 2012The Analysis and Design of and the Evaluation of Design Actions for Reinforced Concrete Ductile Shear Wall Structures, article by T. Paulay and R.L. WilliamsThe Analysis and Design of and the Evaluation of Design Actions for Reinforced Concrete Ductile Shear Wall Structures, article by T. Paulay and R.L. Williams
                        • Paulay, Thomas
                        • Williams, Roger L
                          Referenced Document
                          Engineering
                          2012-03-12-16- 23-3212 March 2012Summary of presentation for the hearing on New Building Technologies by Meagan Leigh DevineSummary of presentation for the hearing on New Building Technologies by Meagan Leigh Devine
                            Devine, Megan Leigh
                            Exhibit
                            New Building Technologies
                            2012-08-15-16- 24-3615 August 2012Building Management after Earthquakes: Submission by the Department of Building and Housing on the Royal Commission Discussion Paper, July 2012Building Management after Earthquakes: Submission by the Department of Building and Housing on the Royal Commission Discussion Paper, July 2012
                            • Department of Building and Housing
                            • Kelly, David
                              Submission
                            • Building assessments after earthquakes
                            • Engineering
                            • Placarding (Stickering)
                            • Safety Evaluation
                              2012-11-28-12- 22-3228 November 2012Summary by Dr Terry Webb of recent seismic hazard modelling by GNS ScienceSummary by Dr Terry Webb of recent seismic hazard modelling by GNS Science
                              • GNS Science
                              • Webb, T H (Terry)
                                Referenced Document
                                Seismicity
                                2012-11-27-16- 22-0827 November 2012Paper on An Efficient System for Acquiring Earthquake Damage Information in Damage Area, by A. Shibayama and Y. HisadaPaper on An Efficient System for Acquiring Earthquake Damage Information in Damage Area, by A. Shibayama and Y. Hisada
                                • Hisada, Yoshiaki
                                • Shibayama, Akihiro
                                  Referenced Document
                                • Building assessments after earthquakes
                                • Placarding (Stickering)
                                • Safety Evaluation
                                  2011-11-07-14- 28-4607 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 4 of 5, Page 147-170Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 4 of 5, Page 147-170
                                    Christchurch City Council
                                    Technical Report
                                    Placarding (Stickering)
                                    2012-08-22-12- 22-3322 August 2012Roles and Responsibilities: Submission from Environment Canterbury Regional Council on the Royal Commission Discussion Paper, August 2012Roles and Responsibilities: Submission from Environment Canterbury Regional Council on the Royal Commission Discussion Paper, August 2012
                                      Environment Canterbury Regional Council
                                      Submission
                                    • Roles and Responsibilities
                                    • Standards and Regulation
                                      2012-08-17-14- 11-0417 August 2012Building Management after Earthquakes: Submission by IPENZ on Royal Commission Discussion PaperBuilding Management after Earthquakes: Submission by IPENZ on Royal Commission Discussion Paper
                                        Institution of Professional Engineers New Zealand (IPENZ)
                                        Submission
                                      • Building assessments after earthquakes
                                      • Placarding (Stickering)
                                      • Safety Evaluation
                                        2012-08-15-11- 36-0715 August 2012CTV Building hearing: Reinforced Concrete Structures, by R Park and T Paulay, Section 6.4CTV Building hearing: Reinforced Concrete Structures, by R Park and T Paulay, Section 6.4
                                        • Park, R
                                        • Paulay, Park
                                          Exhibit
                                          Engineering

                                          Search results navigation

                                          Displaying 1436 - 1455 of 1517 items arrow left First arrow left Prev arrow right Next arrow right Last