Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Sorted descending Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-12-05-15- 11-0205 December 2011Architectural drawings of PGC Building by Richard Fenwick, includes graphsArchitectural drawings of PGC Building by Richard Fenwick, includes graphs
    Fenwick, Richard
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2011-10-28-11- 52-5128 October 2011Appendices to submission by the Standards CouncilAppendices to submission by the Standards Council
    Standards Council
    Submission
    Standards and Regulation
    2012-11-27-16- 26-1027 November 2012An Examination of Improvements Required to Legislative Provisions for Post Disaster Reconstruction in New Zealand, doctoral thesis by Dr James RotimiAn Examination of Improvements Required to Legislative Provisions for Post Disaster Reconstruction in New Zealand, doctoral thesis by Dr James Rotimi
      Rotimi, James Olabode Bamidele
      Referenced Document
    • Building assessments after earthquakes
    • Civil Defence
    • Emergency Powers and Procedures
    • Placarding (Stickering)
    • Safety Evaluation
    • Standards and Regulation
      2011-10-19-17- 45-2419 October 2011Aftershock information for Geonet website - Aftershock DefinitionAftershock information for Geonet website - Aftershock Definition
      • Gerstenberger, Matthew
      • GNS Science
        Exhibit
        Seismicity
        2011-10-19-17- 53-2919 October 2011Aftershock info for Geonet website: Number of aftershocks per day vs modelled daily number of aftershocks greater than magnitude 5Aftershock info for Geonet website: Number of aftershocks per day vs modelled daily number of aftershocks greater than magnitude 5
        • Gerstenberger, Matthew
        • GNS Science
          Exhibit
          Seismicity
          2011-10-19-17- 50-1019 October 2011Aftershock info for Geonet website: Expected number of aftershocks per day of magnitude 4.0-4.9 and expected number of aftershocks per day of magnitude 5 and largerAftershock info for Geonet website: Expected number of aftershocks per day of magnitude 4.0-4.9 and expected number of aftershocks per day of magnitude 5 and larger
          • Gerstenberger, Matthew
          • GNS Science
            Exhibit
            Seismicity
            2012-02-27-13- 51-3227 February 2012Additional Christchurch City Council submissions on legal requirements for earthquake-prone buildings and related matters (issues 3(b) to 3(d) Additional Christchurch City Council submissions on legal requirements for earthquake-prone buildings and related matters (issues 3(b) to 3(d)
              Christchurch City Council
              Submission
              Unreinforced Masonry Buildings (URM)
              2012-03-06-15- 04-1806 March 2012A Numerical Study of Seismic Behaviour of Timber Shear Walls with Slip-friction ConnectorsA Numerical Study of Seismic Behaviour of Timber Shear Walls with Slip-friction Connectors
              • Chouw, Nawawi
              • Loo, Wei Yuen
              • Quenneville, Pierre
              • University of Auckland
                Exhibit
                New Building Technologies
                2012-11-27-14- 35-2327 November 2012A collection of documents compiled by the Royal Commission to assess the earthquake performance of Pacific Tower, 166 Gloucester Street. (Part 2)A collection of documents compiled by the Royal Commission to assess the earthquake performance of Pacific Tower, 166 Gloucester Street. (Part 2)
                  Various
                    Buildings - Representative Sample
                    2012-11-27-14- 35-5127 November 2012A collection of documents compiled by the Royal Commission to assess the earthquake performance of Pacific Tower, 166 Gloucester Street. (Part 1)A collection of documents compiled by the Royal Commission to assess the earthquake performance of Pacific Tower, 166 Gloucester Street. (Part 1)
                      Various
                      • Buildings - Representative Sample
                      • Engineering
                        Gloucester 166
                      2012-11-27-16- 28-1827 November 2012A Cluster Approach for Civil Defence and Emergency ManagementA Cluster Approach for Civil Defence and Emergency Management
                        Ministry of Civil Defence & Emergency Management
                        Referenced Document
                        Emergency Powers and Procedures
                        2011-10-19-17- 40-5219 October 20116.3 Magnitude Earthquake Part of Aftershock Sequence - includes graphic showing location of main shock, aftershocks above magnitude 3, and fault ruptures in Canterbury - Media Release by GNS Science, 25 February 20116.3 Magnitude Earthquake Part of Aftershock Sequence - includes graphic showing location of main shock, aftershocks above magnitude 3, and fault ruptures in Canterbury - Media Release by GNS Science, 25 February 2011
                          GNS Science
                          Exhibit
                          Seismicity
                          2012-09-14-14- 09-5414 September 20122012-09-12 Roles and Responsibilities hearing transcript2012-09-12 Roles and Responsibilities hearing transcript
                            Speakers - Various
                            Transcript
                            Roles and Responsibilities
                            2012-09-14-13- 43-2714 September 20122012-09-11 Roles and Responsibilities hearing transcript2012-09-11 Roles and Responsibilities hearing transcript
                              Speakers - Various
                              Transcript
                              Roles and Responsibilities
                              2012-09-12-17- 17-0912 September 20122012-09-10 Training and Education of Engineers hearing transcript2012-09-10 Training and Education of Engineers hearing transcript
                                Speakers - Various
                                Transcript
                                Training and Education
                                2012-09-11-16- 35-1011 September 20122012-09-07 CTV Building hearing transcript2012-09-07 CTV Building hearing transcript
                                  Speakers - Various
                                  Transcript
                                  Buildings - Representative Sample
                                  Madras 249
                                2012-09-11-12- 20-4911 September 20122012-09-06 CTV Building hearing transcript2012-09-06 CTV Building hearing transcript
                                  Speakers - Various
                                  Transcript
                                  Buildings - Representative Sample
                                  Madras 249
                                2012-09-07-08- 59-0407 September 20122012-09-05 CTV Building hearing transcript2012-09-05 CTV Building hearing transcript
                                • Canterbury Earthquakes Royal Commission
                                • Mills, Stephen
                                  Transcript
                                  Buildings - Representative Sample
                                  Madras 249
                                2012-09-06-09- 14-1906 September 20122012-09-04 Building Management after Earthquakes hearing transcript2012-09-04 Building Management after Earthquakes hearing transcript
                                  Speakers - Various
                                  Transcript
                                  Building assessments after earthquakes
                                  2012-09-05-09- 07-1505 September 20122012-09-03 Building Management after Earthquakes hearing transcript2012-09-03 Building Management after Earthquakes hearing transcript
                                    Speakers - Various
                                    Transcript
                                    Building assessments after earthquakes

                                    Search results navigation

                                    Displaying 1202 - 1221 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last