Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Sorted descending Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2012-11-27-15- 54-4827 November 2012Assessment of hollow-core floors for seismic performance - research reportAssessment of hollow-core floors for seismic performance - research report
  • Bull, Des
  • Fenwick, Richard
  • Gardiner, Debra
  • University of Canterbury
    Referenced Document
    Engineering
    2012-11-27-16- 13-3927 November 2012Articel by T. Saito and S.K. Thakur on Post-earthquake Risk Inspection System for BuildingsArticel by T. Saito and S.K. Thakur on Post-earthquake Risk Inspection System for Buildings
    • Saito, Taiki
    • Thakur, Sunil Kumar
      Referenced Document
    • Building assessments after earthquakes
    • Engineering
    • Placarding (Stickering)
    • Safety Evaluation
      2012-03-09-17- 37-0809 March 2012Architectural Implications of New Technologies (in seismic resistant design): Presentation by Associate Professor Andrew W Charleson, Victoria University, for the hearing on New Building TechnologiesArchitectural Implications of New Technologies (in seismic resistant design): Presentation by Associate Professor Andrew W Charleson, Victoria University, for the hearing on New Building Technologies
        Charleson, Andrew W
        Exhibit
      • Architecture
      • New Building Technologies
        2011-12-05-15- 11-0205 December 2011Architectural drawings of PGC Building by Richard Fenwick, includes graphsArchitectural drawings of PGC Building by Richard Fenwick, includes graphs
          Fenwick, Richard
          Exhibit
          Buildings - Representative Sample
          Cambridge 233
        2011-10-28-11- 52-5128 October 2011Appendices to submission by the Standards CouncilAppendices to submission by the Standards Council
          Standards Council
          Submission
          Standards and Regulation
          2012-11-27-16- 26-1027 November 2012An Examination of Improvements Required to Legislative Provisions for Post Disaster Reconstruction in New Zealand, doctoral thesis by Dr James RotimiAn Examination of Improvements Required to Legislative Provisions for Post Disaster Reconstruction in New Zealand, doctoral thesis by Dr James Rotimi
            Rotimi, James Olabode Bamidele
            Referenced Document
          • Building assessments after earthquakes
          • Civil Defence
          • Emergency Powers and Procedures
          • Placarding (Stickering)
          • Safety Evaluation
          • Standards and Regulation
            2011-10-19-17- 45-2419 October 2011Aftershock information for Geonet website - Aftershock DefinitionAftershock information for Geonet website - Aftershock Definition
            • Gerstenberger, Matthew
            • GNS Science
              Exhibit
              Seismicity
              2011-10-19-17- 53-2919 October 2011Aftershock info for Geonet website: Number of aftershocks per day vs modelled daily number of aftershocks greater than magnitude 5Aftershock info for Geonet website: Number of aftershocks per day vs modelled daily number of aftershocks greater than magnitude 5
              • Gerstenberger, Matthew
              • GNS Science
                Exhibit
                Seismicity
                2011-10-19-17- 50-1019 October 2011Aftershock info for Geonet website: Expected number of aftershocks per day of magnitude 4.0-4.9 and expected number of aftershocks per day of magnitude 5 and largerAftershock info for Geonet website: Expected number of aftershocks per day of magnitude 4.0-4.9 and expected number of aftershocks per day of magnitude 5 and larger
                • Gerstenberger, Matthew
                • GNS Science
                  Exhibit
                  Seismicity
                  2012-02-27-13- 51-3227 February 2012Additional Christchurch City Council submissions on legal requirements for earthquake-prone buildings and related matters (issues 3(b) to 3(d) Additional Christchurch City Council submissions on legal requirements for earthquake-prone buildings and related matters (issues 3(b) to 3(d)
                    Christchurch City Council
                    Submission
                    Unreinforced Masonry Buildings (URM)
                    2012-03-06-15- 04-1806 March 2012A Numerical Study of Seismic Behaviour of Timber Shear Walls with Slip-friction ConnectorsA Numerical Study of Seismic Behaviour of Timber Shear Walls with Slip-friction Connectors
                    • Chouw, Nawawi
                    • Loo, Wei Yuen
                    • Quenneville, Pierre
                    • University of Auckland
                      Exhibit
                      New Building Technologies
                      2012-11-27-14- 35-2327 November 2012A collection of documents compiled by the Royal Commission to assess the earthquake performance of Pacific Tower, 166 Gloucester Street. (Part 2)A collection of documents compiled by the Royal Commission to assess the earthquake performance of Pacific Tower, 166 Gloucester Street. (Part 2)
                        Various
                          Buildings - Representative Sample
                          2012-11-27-14- 35-5127 November 2012A collection of documents compiled by the Royal Commission to assess the earthquake performance of Pacific Tower, 166 Gloucester Street. (Part 1)A collection of documents compiled by the Royal Commission to assess the earthquake performance of Pacific Tower, 166 Gloucester Street. (Part 1)
                            Various
                            • Buildings - Representative Sample
                            • Engineering
                              Gloucester 166
                            2012-11-27-16- 28-1827 November 2012A Cluster Approach for Civil Defence and Emergency ManagementA Cluster Approach for Civil Defence and Emergency Management
                              Ministry of Civil Defence & Emergency Management
                              Referenced Document
                              Emergency Powers and Procedures
                              2011-10-19-17- 40-5219 October 20116.3 Magnitude Earthquake Part of Aftershock Sequence - includes graphic showing location of main shock, aftershocks above magnitude 3, and fault ruptures in Canterbury - Media Release by GNS Science, 25 February 20116.3 Magnitude Earthquake Part of Aftershock Sequence - includes graphic showing location of main shock, aftershocks above magnitude 3, and fault ruptures in Canterbury - Media Release by GNS Science, 25 February 2011
                                GNS Science
                                Exhibit
                                Seismicity
                                2012-09-14-14- 09-5414 September 20122012-09-12 Roles and Responsibilities hearing transcript2012-09-12 Roles and Responsibilities hearing transcript
                                  Speakers - Various
                                  Transcript
                                  Roles and Responsibilities
                                  2012-09-14-13- 43-2714 September 20122012-09-11 Roles and Responsibilities hearing transcript2012-09-11 Roles and Responsibilities hearing transcript
                                    Speakers - Various
                                    Transcript
                                    Roles and Responsibilities
                                    2012-09-12-17- 17-0912 September 20122012-09-10 Training and Education of Engineers hearing transcript2012-09-10 Training and Education of Engineers hearing transcript
                                      Speakers - Various
                                      Transcript
                                      Training and Education
                                      2012-09-11-16- 35-1011 September 20122012-09-07 CTV Building hearing transcript2012-09-07 CTV Building hearing transcript
                                        Speakers - Various
                                        Transcript
                                        Buildings - Representative Sample
                                        Madras 249
                                      2012-09-11-12- 20-4911 September 20122012-09-06 CTV Building hearing transcript2012-09-06 CTV Building hearing transcript
                                        Speakers - Various
                                        Transcript
                                        Buildings - Representative Sample
                                        Madras 249

                                      Search results navigation

                                      Displaying 1199 - 1218 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last