Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted descending Subject(s) Not sorted Building(s) Not sorted Action
2012-04-0202 April 2012PGC Building hearing: Post-hearing submission from Holmes Consulting Group in relation to the PGC Building PGC Building hearing: Post-hearing submission from Holmes Consulting Group in relation to the PGC Building
  • Hannan, John
  • Holmes Consulting Group
    Post hearing submission
    Buildings - Representative Sample
    Cambridge 233
2012-03-1313 March 2012Submission on the Paper "Design of Conventional Structural Systems Following the Canterbury Earthquakes" by Colin Ashby of Ashby Consulting Engineering Ltd, March 2012Submission on the Paper "Design of Conventional Structural Systems Following the Canterbury Earthquakes" by Colin Ashby of Ashby Consulting Engineering Ltd, March 2012
  • Ashby Consulting Engineering Ltd
  • Ashby, Colin
    Exhibit
  • New Building Technologies
  • Standards and Regulation
    2012-03-1212 March 2012Requirement for Future Buildings: Submission by Rod Fulford on behalf of Precast New Zealand Inc, December 2011Requirement for Future Buildings: Submission by Rod Fulford on behalf of Precast New Zealand Inc, December 2011
    • Fulford, Rod
    • Precast New Zealand Inc
      Exhibit
    • Engineering
    • New Building Technologies
      2011-10-2727 October 2011Unreinforced masonry and other earthquake prone buildings - Requirements for seismic strengthening: Submission by Joe Arts, October 2011Unreinforced masonry and other earthquake prone buildings - Requirements for seismic strengthening: Submission by Joe Arts, October 2011
        Arts, Joe
        Exhibit
        Unreinforced Masonry Buildings (URM)
        High 137-139
      2012-03-1212 March 2012Requirement for Future Buildings: Submission by Rod Fulford on behalf of Precast New Zealand Inc, December 2011Requirement for Future Buildings: Submission by Rod Fulford on behalf of Precast New Zealand Inc, December 2011
      • Fulford, Rod
      • Precast New Zealand Inc
        Exhibit
      • Engineering
      • New Building Technologies
        2012-11-2626 November 2012CTV Building hearing: An Alternative Collapse Scenario for the CTV Building: Submission to the Royal Commission from John ManderCTV Building hearing: An Alternative Collapse Scenario for the CTV Building: Submission to the Royal Commission from John Mander
          Mander, John
          Exhibit
          Buildings - Representative Sample
          Madras 249

        Search results navigation

        Displaying 166 - 171 of 171 items arrow left First arrow left Prev arrow right disabled Next arrow right disabled Last