CTV Building hearing: CTV Building Non-Linear Time History Analysis (NTHLA) Report: first draft issue prepared by Compusoft Engineering Limited
Browse other document categories
Summary
CTV Building hearing: CTV Building Non-Linear Time History Analysis (NTHLA) Report: first draft issue, prepared for Canterbury Earthquakes Royal Commission by Derek Bradley, Tony Stuart and Dr Nicholas Brooke of Compusoft Engineering Limited, July 2012
Hearing dates: 25 and 26 July 2012 (Panel)
Available formats
CTV Building hearing: CTV Building Non-Linear Time History Analysis (NTHLA) Report: first draft issue prepared by Compusoft Engineering LimitedPDF, 241 pages, 18.63 mbDate added to this website: 26 July 2012
About this document
Record ID | Attachment | Author(s) | Subject(s) | Building(s) | Action |
---|
To view other documents by the same author, or documents relating to the same subject or building choose one of the links above.