CTV Building hearing: Report by Charles Clifton on the Analysis of the CTV Floor Diaphragm Adequacy prepared for Hyland Consultant Ltd
Browse other document categories
Summary
CTV Building hearing: Report by Charles Clifton on the Analysis of the CTV Floor Diaphragm Adequacy prepared for Hyland Consultant Ltd for the Department of Building and Housing investigation into the collapse of the CTV Building during the 22 February 2011 earthquake after-shock, dated November 2011.
Hearing date: 16 and 17 August 2012 (Geoff Banks)
Available formats
CTV Building hearing: Report by Charles Clifton on the Analysis of the CTV Floor Diaphragm Adequacy prepared for Hyland Consultant Ltd PDF, 38 pages, 3.35 mbDate added to this website: 17 August 2012