Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted ascending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-12-1515 December 2011Riccarton 7 hearing: Statement of Beth AdamRiccarton 7 hearing: Statement of Beth Adam
    Adam, Beth
    Exhibit
    Buildings - Representative Sample
    Riccarton 7
2012-07-3131 July 2012CTV Building hearing: Alan M. Reay Consulting Engineer time records for 1986CTV Building hearing: Alan M. Reay Consulting Engineer time records for 1986
    Alan M Reay Consulting Engineer
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-06-2525 June 2012CTV Building hearing: Architectural and structural drawings of the office building at 249 Madras StreetCTV Building hearing: Architectural and structural drawings of the office building at 249 Madras Street
    Alan Reay Consultants Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-3131 July 2012CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report on the Office Building at 249 Madras Street CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report on the Office Building at 249 Madras Street
    Alan Reay Consultants Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-08-0101 August 2012CTV Building hearing:Collection of building permit documents for the Westpark Tower at 56 Cashel Street CTV Building hearing:Collection of building permit documents for the Westpark Tower at 56 Cashel Street
    Alan Reay Consultants Ltd
    Exhibit
  • Buildings - Other
  • Buildings - Representative Sample
  • Cashel 56
  • Madras 249
2012-08-1414 August 2012CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural ReportCTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report
    Alan Reay Consultants Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-08-0707 August 2012CTV Building hearing: Letter from Alan Reay Consultants to DBH regarding the CTV investigation draft reportCTV Building hearing: Letter from Alan Reay Consultants to DBH regarding the CTV investigation draft report
    Alan Reay Consultants Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-07-2424 July 2012 CTV Building hearing: Spreadsheet setting out responses by Alan Reay Consultants Ltd to aspects of DBH draft report CTV Building hearing: Spreadsheet setting out responses by Alan Reay Consultants Ltd to aspects of DBH draft report
    Alan Reay Consultants Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-08-0909 August 2012CTV Building hearing: Seismic load analysis (calculations) by Alan Reay Consultants Ltd for Williams Development, 1986CTV Building hearing: Seismic load analysis (calculations) by Alan Reay Consultants Ltd for Williams Development, 1986
    Alan Reay Consultants Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-08-0909 August 2012CTV Building hearing: Gravity elements calculations by Alan Reay Consultants Ltd for Williams Development, 1986 CTV Building hearing: Gravity elements calculations by Alan Reay Consultants Ltd for Williams Development, 1986
    Alan Reay Consultants Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-08-0606 August 2012CTV Building hearing: Structural drawings in relation to Landsborough House, dated February 1985CTV Building hearing: Structural drawings in relation to Landsborough House, dated February 1985
    Alan Reay Consultants Ltd
    Exhibit
  • Buildings - Other
  • Buildings - Representative Sample
  • Durham 287
  • Madras 249
2012-11-2222 November 2012 CTV Building hearing - Madras 249 CTV Building - Letter dated 3 May 2011 from Alan Reay of Alan Reay Consultants Ltd to Clark Hyland of Hyland Fatigue and Earthquake Engineering CTV Building hearing - Madras 249 CTV Building - Letter dated 3 May 2011 from Alan Reay of Alan Reay Consultants Ltd to Clark Hyland of Hyland Fatigue and Earthquake Engineering
    Alan Reay Consultants Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-11-2222 November 2012CTV Building hearing - Letter from Alan Reay to Clark Hyland dated 21 April 2011confirming information request.CTV Building hearing - Letter from Alan Reay to Clark Hyland dated 21 April 2011confirming information request.
    Alan Reay Consultants Ltd
    Exhibit
  • Buildings - Representative Sample
  • Geotechnical
  • Structural Performance
    Madras 249
2012-06-2525 June 2012CTV Building hearing: Architectural and structural drawings of the office building at 249 Madras StreetCTV Building hearing: Architectural and structural drawings of the office building at 249 Madras Street
    Alun Wilkie Architects Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
2011-12-1515 December 2011Riccarton 7 hearing: Statement of Lynette AndrellRiccarton 7 hearing: Statement of Lynette Andrell
    Andrell, Lynette
    Exhibit
    Buildings - Representative Sample
    Riccarton 7
2012-11-2323 November 2012CTV Building hearing: Post earthquake building performance assessment formCTV Building hearing: Post earthquake building performance assessment form
    Applied Technology Council
    Exhibit
    Building assessments after earthquakes
    2011-10-2121 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph Archuleta, October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph Archuleta, October 2011
      Archuleta, Ralph J
    • Exhibit
    • Technical Report
      Seismicity
      2012-02-1616 February 2012Colombo 382 hearing: Statement of Cheryl ArmourColombo 382 hearing: Statement of Cheryl Armour
        Armour, Cheryl
        Exhibit
        Buildings - Representative Sample
      • Colombo 380
      • Colombo 382
      2011-11-0909 November 2011Photos of the Mt Eden Road Shopping Centre, Auckland supplied by Joe Arts - full sized slidesPhotos of the Mt Eden Road Shopping Centre, Auckland supplied by Joe Arts - full sized slides
        Arts, Joe
        Exhibit
        Unreinforced Masonry Buildings (URM)
        2011-10-2727 October 2011Unreinforced masonry and other earthquake prone buildings - Requirements for seismic strengthening: Submission by Joe Arts, October 2011Unreinforced masonry and other earthquake prone buildings - Requirements for seismic strengthening: Submission by Joe Arts, October 2011
          Arts, Joe
        • Exhibit
        • Submission
          Unreinforced Masonry Buildings (URM)
          High 137-139

        Search results navigation

        Displaying 1 - 20 of 1169 items arrow left disabled First arrow left disabled Prev arrow right Next arrow right Last